THE PIRBRIGHT INSTITUTE: Contract Register & Procurement Profile

Companies House: PRI/LTD BY GUAR/NSC (Private, limited by guarantee, no share capital)South East EnglandWoking

Companies House00559784 ↗Websitepirbright.ac.uk ↗

Open now2next deadline 13 Nov 2026
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months39+56% vs prior 12 months (25)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot50% single-bid · 4 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.

Last 24 months, all categories.

Top-3 supplier share14%of 50 awarded procedures · 41 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

50 awarded tenders, 41 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months95 within 6 months
i

Contracts that finish in the next 18 months.

Published contracts with an end date in that window. No end date, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£2.6mnet · on 34 of 34 published values · top 5 = 39%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

Open notices

2 live · deadline in the future or not published · as of page build

NoticeDeadlineDays leftPublished value
ISO11 Fumigation Lobby and Dedicated Air Handling Unit (AHU) - Retender13 Nov 202624d£151,666
Provision of Payroll Services18 Nov 202629d£85,000

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

45 Construction work16 procedures · 25% · 1 open
71 Architectural, construction, engineering13 procedures · 20% · 1 open
31 Electrical machinery9 procedures · 14%
42 Industrial machinery9 procedures · 14%

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 64 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract92%(59 notices)
    59 of 64 notices are Contract (92%).
  • Framework8%(5 notices)
    5 of 64 notices are Framework (8%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Direct award48%(31 notices)
    31 of 64 notices are Direct award (48%).
  • Open47%(30 notices)
    30 of 64 notices are Open (47%).
  • Limited / restricted5%(3 notices)
    3 of 64 notices are Limited / restricted (5%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.

Last 24 months, all categories.

5moderate · n=40% of lots drew a single bid
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from deadline to first award notice, on this buyer’s own tenders.

Based on 11 decided tenders across all categories, last 24 months.

Last 24 months.

54 daysrobust · n=11
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 64 notices across all categories, last 24 months.

Last 24 months.

025 of 64 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 1 lots with both an estimate and an award, last 24 months. Small sample.

A past pattern, not a price to bid.

Last 24 months.

43.2% below estimateindicative · n=1

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
SCHNEIDER ELECTRIC LIMITED36%33—
ASSA ABLOY GLOBAL SOLUTIONS UK LIMITED T/A Trakaframework/DPS on 124%22—
Beckman Coulter United Kingdom Limited24%22—
CJB Commissing Services24%22—
Luhrfilter Ltd24%227 May 2026
Terra-NRG Ltd24%22—
Safety Gas Detection Ltd24%22—
Fuel Conservation services Ltd24%12—

The three most frequent suppliers are named on 14% of 50 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 41 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£2.6mSum of published VAT-exclusive values on 34 of 34 published single-supplier values; the five largest make 39%; a further 11 published a VAT-inclusive amount only, kept apart.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£50k middle valuerobust · n=34Middle half £36k–£86k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
Brooksby Incinerator – Refractory ReplacementFuel Conservation services Ltd—2 mo£267,995 †
Brooksby Incinerator PLC Systems and Scada ModificationsLuhrfilter Ltd7 May 20265 mo£248,900
Ultra, High-speed, & Bench Top centrifugesBeckman Coulter United Kingdom Limited—1.1 yrs£195,000 †
≈ £180k/yr
Formulation machineGlobal Life Sciences Solutions Operations UK Ltd—1 mo£154,360 †
Site HV/LV Supplies Maintenance RetenderUK Power Networks Services (Commercial) Limited—3 yrs · up to 4 yrs£151,216 †
≈ £50k/yr

Contracts ending
i

Contracts that finish in the next 18 months.

Published contracts with an end date in that window. No end date, not counted.

An end date does not confirm a new procurement.

Published end dates only · 49 of 50 contracts carry one · not a retender forecast

Recent procedures

Latest 50 of 72 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Rental of Containerised/Trailer Steam Boiler HouseAwarded / complete5 Jun 2026—
Supply of updated Stage 3 mechanical & civils design for Site Steam Upgrade project (inc project support).Awarded / complete5 Jun 2026—
ISO 11 - Fumigation Lobby Replacement Project ManagerFumigation servicesAwarded / complete12 May 2026£65,000
Grounds Maintenance for The Pirbright Institute and HousingGrounds maintenance servicesAwarded / complete11 May 2026£260,000
Plowright and Brooksby CETP BETP Calibrations Service ContractCalibration servicesAwarded / complete11 May 2026£0
Filters for 2026 for use across all bio protection systemsAwarded / complete25 Mar 2026—
IS4L Fire Alarm UpgradeBurglar and fire alarmsAwarded / complete5 Feb 2026£42,750
Ultra, High-speed, & Bench Top centrifugesAwarded / complete21 Jan 2026—
QIAcuity One, 5plex Platform DeviceAwarded / complete21 Jan 2026—
Benchtop centrifuge replacementAwarded / complete21 Jan 2026—
XPR105MCP balanceAwarded / complete21 Jan 2026—
C-Cure Server replacementAwarded / complete13 Jan 2026—
Plowright Batch ETP safety PLC replacementAwarded / complete13 Jan 2026—
Service contract agreement for all site autoclaves - servicing and validationsAwarded / complete13 Jan 2026—
Rental of Containerised/Trailer Steam Boiler HouseAwarded / complete13 Jan 2026—
Site Steam Upgrade Project - Principal Contractor & Installation PackageBoiler installation workAwarded / complete7 Jan 2026£320,000
Site HV/LV Supplies MaintenanceFrameworkElectric motorsAwarded / complete22 Dec 2025£31,000
Autoclave Service and Validation ContractFrameworkAutoclavesAwarded / complete22 Dec 2025£130,000
Jenner Building CO2 Detection System ReplacementElectrical installation workAwarded / complete9 Dec 2025£45,000
Brooksby Diesel Generator Conditional MonitoringAwarded / complete28 Nov 2025—

Search all 72 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 49 of 50 published contracts state an end date; those feed “Contracts ending”.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.