RELIANCE HIGH-TECH LIMITED: UK Public Sector Contracts Won & Awards

Companies House: Private Limited CompanyBracknellNationwide (UK)Main market: Surveillance and security systems and devices

Official UK PPONPWNV-6466-BTGLCompanies House02025063 ↗ · Active

Where they win
i

36 awards (35 for a named lot, 97%, 1 for a whole procedure with no lot named) · top CPV classes, shares of all 36 awards. An award may cover more than one class.

3512 Surveillance and security systems and devices13 awards · 36% · awards naming a lot
7131 Consultative engineering and construction services4 awards · 11% · 3 awards naming a lot + 1 whole-procedure awards
7971 Security services4 awards · 11% · awards naming a lot
3250 Telecommunications equipment and supplies1 award · 3% · awards naming a lot
3511 Firefighting, rescue and safety equipment1 award · 3% · awards naming a lot
Attributable award value
i
£6.4mOn 11 of 36 award records; the five largest make 96%; a further 2 published a VAT-inclusive amount only (£84k inc. VAT, kept apart). Largest rows below.
Typical attributable award
i
£110k middle valuerobust · n=11
Award vs estimate
i

Based on 2 wins across all categories. Small sample.

5.5% below estimateindicative · n=2compared within all comparable wins
Largest published awards
i
AuthorityAwardedTermPublished value
CCTV MONITORING & MAINTENANCE AND SECURITY ACCESS CONTROL SYSTEMLuton Borough Council——£4,500,000 †
Security Systems Maintenance (2026)London School of Hygiene & Tropical Medicine23 Jun 20263 yrs · up to 7 yrs£800,000
≈ £267k/yr
CCTV System UpgradeUniversity of Wales Trinity Saint David——£599,000 †
Lone Working DevicesDarlington Borough Council——£130,860 †
CM49 - ACCESS CONTROLTRINITY HOUSE—4 yrs · up to 7 yrs£130,293 †
≈ £33k/yr

Where their buyers are
i

ITL1 region of the buyer office · known for 57 of 57 awarded procedures · each procedure counts once

Greater London12 procedures · 21%
South East England11 procedures · 19%
East Midlands9 procedures · 16%
South West England6 procedures · 11%
North East England4 procedures · 7%
North West England4 procedures · 7%
East of England4 procedures · 7%
Yorkshire and the Humber3 procedures · 5%

Bidding record
i

Procurement Act 2023 award notices name every bidder · 3 notices name this supplier since 23 Jun 2026 · observed bids, not an estimate

Contract lots contested
i
1 won · 0 lostindicative · n=1Fewer than three decided lots: no rate is claimed.
Framework / DPS places
i
2 of 2
Authorities bid for
i
3

Bidder names come from Procurement Act 2023 award notices, which list every bidder (from 2025). Older notices name no bidders, so earlier contests do not appear here. Latest ten notices shown.

Who they sell to
i

Authorities named on this supplier’s published awards · ranked by distinct procedures · a framework or DPS adds one award record per appointed supplier

Authority type · official UK type when published, else name/id class, else not classified · by award records (a single panel can dominate)
i
  • Type not classified40%(14 awards)
    14 of 35 awards are Type not classified (40%).
  • Local authority20%(7 awards)
    7 of 35 awards are Local authority (20%).
  • Other public body14%(5 awards)
    5 of 35 awards are Other public body (14%).
  • Central government11%(4 awards)
    4 of 35 awards are Central government (11%).
  • NHS & health9%(3 awards)
    3 of 35 awards are NHS & health (9%).
  • Education6%(2 awards)
    2 of 35 awards are Education (6%).
AuthorityProceduresShareAward recordsLast activity
Kent County Councilframework/DPS on 2610.5%69 Jun 2026
Luton Borough Council35.3%328 Sept 2022
Gov Facility Services Ltd35.3%33 Sept 2026
Derbyshire Support and Facilities Services Limited35.3%330 Apr 2025
ESPOframework/DPS on 123.5%77 Dec 2023
Bromford Flagship LiveWest Limited23.5%227 Jan 2026
Cumbria, Northumberland, Tyne and Wear NHSFT23.5%226 May 2026
Amplius Living23.5%224 Jul 2026

Share = of the 57 procedures with an award naming this supplier. Last activity = award date, or notice publication when no award date was published.

Contracts ending
i

58 of 68 awards carry an end date, 11 estimated from the duration · not a retender forecast

ContractEndsPublished value
Lot 2 - Car Park Barrier Supply, Installation and Maintenance29 Nov 2026 estimated£6,000,000 ceiling
Lot 3 - Intruder Alarm Systems Supply, Installation and Maintenance29 Nov 2026 estimated£6,000,000 ceiling
Lot 5 - Entrance and Access Control Consumables29 Nov 2026 estimated£3,000,000 ceiling
Body Worn Video Cameras for DVSA13 Feb 2027£400,000
CCTV and Intruder Alarm Maintenance1 Apr 2027£61,538
Security - Install & Design, Maintenance & Commissioning16 Apr 2027 estimatedNot published

Recent awards

Latest 30 of 36 award records naming this supplier

Contracts Finder adds 32 more procedures won by this supplier, mostly below the Find a Tender threshold or from before 2025. Each is counted once beside any Find a Tender copy; they are in the totals, not in this list.

About this data
  • One profile per supplier. Built from award and contract notices that name this supplier; different spellings and registration numbers of the same company are merged into this profile.
  • Values are published values. The table mirrors what the notice published: framework ceilings and joint awards are labelled and never counted as this supplier's money, and † marks a value taken from the contract notice when the award published none. Only awards made to this supplier alone count towards its value, excluding VAT. It is not turnover.
  • Regions in the buyer chart describe the buyer office, not where the work is delivered or the supplier’s registered address.
  • Contract end dates. Published on 47 of 68 awards, estimated from the published duration on 11 more (marked “estimated”); those feed “Contracts ending”. Published values in that list come from either source; Contracts Finder figures are shown as published and stay out of this profile’s money totals.
  • Source. Official UK public procurement notices (Find a Tender and Contracts Finder), reused under the Open Government Licence v3.0, updated through the day and rebuilt nightly. Not every figure uses both feeds, and each one shows how many records it rests on: see the methodology. Spotted something wrong? Tell us.