SEVERN TRENT WATER LIMITED: Contract Register & Procurement Profile
Companies House: Private Limited Company·West Midlands·Coventry
Official UK PPONPQQN-5222-QDXRWebsiteseverntrent.com ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 5 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
49 awarded tenders, 122 different suppliers.
Describes the record. It is not a sign of favouritism.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
4 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| Ecology Survey | 20 Nov 2026 | 31d | £40,000,000 |
| Ductile Iron Pipe and Associated Fittings | 27 Nov 2026 | 38d | £71,350,000 |
| CHP Maintenance and Servicing Parts | 31 Mar 2029 | 893d | — |
| Supply of Salt | Not published | No deadline | — |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
42 Industrial machinery18 procedures · 20%45 Construction work16 procedures · 18%44 Construction structures and materials15 procedures · 17% · 1 open90 Sewage, refuse, cleaning and environmental15 procedures · 17% · 1 open50 Repair and maintenance services15 procedures · 17%71 Architectural, construction, engineering11 procedures · 12%31 Electrical machinery10 procedures · 11% · 1 open65 Public utilities10 procedures · 11%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 89 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Framework58%(52 notices)
52 of 89 notices are Framework (58%).Contract37%(33 notices)
33 of 89 notices are Contract (37%).Dynamic purchasing system4%(4 notices)
4 of 89 notices are Dynamic purchasing system (4%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Route not published35%(31 notices)
31 of 89 notices are Route not published (35%).Open30%(27 notices)
27 of 89 notices are Open (30%).Selective30%(27 notices)
27 of 89 notices are Selective (30%).Direct award3%(3 notices)
3 of 89 notices are Direct award (3%).Limited / restricted1%(1 notices)
1 of 89 notices are Limited / restricted (1%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 5 lots from this buyer’s competitions, last 24 months.
i
How long this buyer takes to decide after bids close.
Middle value in days from deadline to first award notice, on this buyer’s own tenders.
Based on 18 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 89 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 2 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Suez Advanced Solutions UK Limited | 3 | 6.1% | 3 | 3 | 28 Jul 2026 |
| Mott MacDonald | 2 | 4.1% | 1 | 3 | 28 Jul 2026 |
| Republic of Media | 2 | 4.1% | 1 | 2 | — |
| Jacobs UK Ltd | 2 | 4.1% | 1 | 2 | 28 Jul 2026 |
| Stark Connect Limited | 2 | 4.1% | 1 | 2 | 20 Jan 2026 |
| AtkinsRéalis UK Ltd | 2 | 4.1% | 1 | 2 | 28 Jul 2026 |
| CT PUMPS LIMITED | 1 | 2% | 1 | 7 | 14 Aug 2026 |
| James Troop & Company Ltd | 1 | 2% | 1 | 6 | 14 Aug 2026 |
The three most frequent suppliers are named on 12% of 49 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 122 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Media Buying Agency Services | Republic of Media | — | — | £4,000,000 † |
| Employee Engagement Survery | Workday Ltd | 13 Jul 2026 | 3 yrs · up to 6 yrs | £1,260,000 ≈ £420k/yr |
| Homesford Polymeric Membrane Replacement | SPECIALTY ELECTRONIC MATERIALS UK LIMITED | 9 Jul 2025 | 1 yrs · up to 1.3 yrs | £1,112,910 ≈ £1.1m/yr |
| Maintenance Apprenticeship Delivery | EEF LIMITED | — | — | £1,089,744 † |
| Severn Trent Water Annual Report and Accounts | EMPEROR DESIGN CONSULTANTS LIMITED | 5 Oct 2026 | 3 yrs · up to 5 yrs | £600,000 ≈ £200k/yr |
Recent procedures
Latest 50 of 192 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Supply & Install of Modular Treatment Equipment: Preliminary, Primary Filtration and Fixed Film Biological SystemsMachinery for the treatment of sewage | Open | 28 Jul 2026 | £19,372,500 |
| Digital Contractor Control of Work PlatformSoftware package and information systems | Planning | 21 Jul 2026 | — |
| Fencing ServicesFences | Open | 17 Jul 2026 | £4,112,000 |
| Supply of Reinforcement for Concrete Base SlabsBars | Planning | 13 Jul 2026 | £1,000,000 |
| Employee Engagement SurveryCustomer satisfaction survey | Awarded / complete | 13 Jul 2026 | £1,260,000 |
| Supply of Precast Concrete Shaft SegmentsTanks | Planning | 8 Jul 2026 | — |
| Procurement of Tank CoversMiscellaneous fabricated products and related items | Open | 25 Jun 2026 | £37,400,000 |
| Framework for Reedbed Refurbishment Services Pre Market EngagementSewage-treatment plant construction work | Planning | 19 Jun 2026 | — |
| Process Treatment HireChemical industry machinery | Planning | 15 Jun 2026 | — |
| Employee Benefits and PlatformsBenefit services | Open | 10 Jun 2026 | £805,000 |
| Digestor Roof Replacement Design & Build FrameworkBicycle helmets | Open | 22 May 2026 | £70,000,000 |
| Procurement of N2O Emissions Treatment Solutions and Other Treatment SolutoionsMachinery and apparatus for filtering or purifying gases | Planning | 19 May 2026 | — |
| Supply of diesel self priming solids handling pumpsPumps for liquids | Awarded / complete | 14 May 2026 | £3,500,000 |
| UK2 PME - Computer Aided Design SoftwareMiscellaneous software package and computer systems | Planning | 8 May 2026 | — |
| Common Data Environment SoftwareInformation technology services | Planning | 8 May 2026 | — |
| CHP Combine Heat and Power Engines OnlyGenerating sets | Awarded / complete | 7 May 2026 | £28,500,000 |
| Mobile Plant and Tools: Hire, Purchase and MaintenanceAccess road construction work | Open | 27 Apr 2026 | £60,000,000 |
| Core Networks TenderMaintenance services of telecommunications equipment | Open | 27 Apr 2026 | £14,400,000 |
| Framework for the provision of a Tunnelling, Drilling & Shaft Works for Build Only and Design & BuildConstruction work | Open | 23 Apr 2026 | £1,200,000,000 |
| HGV FrameworkChassis cabs | Awarded / complete | 17 Apr 2026 | £26,000,000 |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 2 of 73 published contracts state an end date; those feed “Contracts ending”.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.