University of Sheffield: Contract Register & Procurement Profile
Companies House: Royal Charter Company·DfE school register: Higher education institutions·Education·Yorkshire and the Humber·Sheffield
Official UK PPONPXDP-7327-GWHT
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 14 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
100 awarded tenders, 126 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
42 Industrial machinery19 procedures · 44%38 Laboratory, optical and precision13 procedures · 30%72 IT services: consulting, software, internet6 procedures · 14%39 Furniture, furnishings, domestic appliances5 procedures · 12%43 Mining, quarrying and construction machinery5 procedures · 12%45 Construction work5 procedures · 12%51 Installation services (except software)5 procedures · 12%09 Petroleum, coal, oil and gas4 procedures · 9%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 43 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 91% (39 notices)
- Dynamic purchasing system 5% (2 notices)
- Framework 5% (2 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Open 60% (26 notices)
- Route not published 23% (10 notices)
- Limited / restricted 9% (4 notices)
- Selective 5% (2 notices)
- Direct award 2% (1 notices)
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 14 lots from this buyer’s competitions, last 24 months.
i
How long this buyer takes to decide after bids close.
Middle value in days from deadline to first award notice, on this buyer’s own tenders.
Based on 9 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 43 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 15 lots with both an estimate and an award, last 24 months.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| KPMG | 3 | 3% | 0 | 3 | 31 May 2023 |
| B. and B. Press (Parkgate) Limited | 2 | 2% | 1 | 2 | 21 Jul 2025 |
| Hickling & Squires UK | 2 | 2% | 1 | 2 | 21 Jul 2025 |
| W&J Linney Ltd | 2 | 2% | 1 | 2 | 21 Jul 2025 |
| Optichrome Ltd | 2 | 2% | 1 | 2 | 21 Jul 2025 |
| Belmont Press | 2 | 2% | 1 | 2 | 21 Jul 2025 |
| SciMed Ltd | 2 | 2% | 0 | 9 | 28 Nov 2022 |
| Anton Paar | 2 | 2% | 0 | 6 | 13 Apr 2023 |
The three most frequent suppliers are named on 5% of 100 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 126 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| 4184.EFM.SW.24 Faculty of Health Phase 1 New Build | Clegg Construction Limited | — | — | £15,699,033 † |
| MBE System | DCA Instruments Oy | — | — | £4,878,210 † |
| Rehosting Partner for Stanage Data Centre | Softcat Plc | — | — | £2,939,430 † |
| 4585/AMRC/CK/25 Gas Decarbonisation Equipment & Carbon Removal Services | Suiso Limited | 15 Dec 2025 | 2 yrs | £470,000 ≈ £235k/yr |
| 4855/AMRC/GM/2025 Kiln Modification for Hydrogen / Natural Gas Mix | Therser (UK) Ltd | 15 Dec 2025 | 1.5 yrs | £399,613 ≈ £266k/yr |
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
Published end dates only · 26 of 157 contracts carry one · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| 4855/AMRC/GM/2025 Kiln Modification for Hydrogen / Natural Gas Mix | Therser (UK) Ltd | 13 Jul 2027 | £399,613 |
| 4449/AMRC/JS/25-5 Axis Milling Machine | NCMT Limited | 31 Aug 2027 | £245,000 |
| 5087/AM/CK Wood Dust Extraction / LEV System for Pattern Shop Environment | Vent-Tech Ltd | 7 Dec 2027 | £91,797 |
| 5112.SH.JN - High Yield Electrospinning System | Bioinicia Fluidnatek S.L. | 10 Dec 2027 | £118,600 |
| 4585/AMRC/CK/25 Gas Decarbonisation Equipment & Carbon Removal Services | Suiso Limited | 13 Jan 2028 | £470,000 |
| 4950.AM.GM - Laser Wire Directed Energy Deposition (Lw-DED) System | 3D GB IRE Ltd | 19 Mar 2028 | £258,287 |
Recent procedures
Latest 50 of 138 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| [CANCELLED] 4585/AMRC/CK/25 Gas Decarbonisation Equipment & Carbon Removal ServicesCarbon | Open | 9 Oct 2025 | £470,000 |
| Dual-growth chamber Molecular Beam Epitaxy System (2 Lots)Laboratory | Awarded / complete | 3 Oct 2025 | — |
| 4473/CYMRU/RH/25 Drilling Spindle IntegrationDrilling equipment | Awarded / complete | 9 Sept 2025 | £125,000 |
| Large Ti Furnace Hydraulic Modifications | Awarded / complete | 27 Aug 2025 | — |
| 4525/JN/25 - Wide-field Fluorescence MicroscopeMicroscopes | Awarded / complete | 26 Aug 2025 | £133,175 |
| 4434/AMRC/GM/25 - Two Component Resin Transfer Moulding MachineAnalysis apparatus | Awarded / complete | 21 Aug 2025 | £130,000 |
| 4449/AMRC/JS/25-5 Axis Milling MachineLathes | Awarded / complete | 5 Aug 2025 | £250,000 |
| 4405/AMRC/CK/25 AMRC Uniform Contract | Awarded / complete | 4 Aug 2025 | — |
| Vibratory Drilling SpindleDrilling equipment | Awarded / complete | 23 Jul 2025 | £125,000 |
| 4403.PS.LWM.24 Print Services Framework Agreement for High Quality Litho Sheet Fed and Digital Printing (non Wide Format)Digital printing services | Awarded / complete | 21 Jul 2025 | £1,600,000 |
| Digital Product Passport (DPP)Combined smart card and fingerprint readers | Open | 18 Jul 2025 | £410,000 |
| Rehosting Partner for Stanage Data CentreComputer facilities management services | Awarded / complete | 7 Apr 2025 | — |
| Marks Management Solution- AWS Integration PartnerSystems and technical consultancy services | Awarded / complete | 27 Mar 2025 | — |
| Stereo Ultra High-Speed cameras for Digital Image CorrelationCameras | Awarded / complete | 21 Feb 2025 | £400,000 |
| 4184.EFM.SW.24 Faculty of Health Phase 1 New BuildConstruction work for buildings relating to education and research | Awarded / complete | 31 Jan 2025 | £14,300,000 |
| Short Pulse LaserIndustrial lasers | Awarded / complete | 31 Jan 2025 | £250,000 |
| Dynamic Purchasing System (DPS) for Translation, transcription, interpretation and other related servicesInterpretation services | Planned | 28 Jan 2025 | £170,000 |
| Dynamic Purchasing System (DPS) for Creative ServicesPhotographic services | Planned | 28 Jan 2025 | £60,000 |
| 4282/AMRC/CK/24 KTC Conference UpgradeConstruction work | Awarded / complete | 27 Jan 2025 | £416,667 |
| Dual growth chamber Molecular Beam Epitaxy SystemLaboratory | Planned | 13 Nov 2024 | £5,000,000 |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£31m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 25 award records on 24 procedures (24 to a single canonical supplier, 1 multi-supplier). 14 values come from the contract record when the award carried none; 3 awards published only a VAT-inclusive amount and are counted but not valued.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 26 of 157 published contracts carry a period end; 6 end within 18 months, 0 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (13 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PXDP-7327-GWHT