NETWORK RAIL INFRASTRUCTURE LIMITED: Contract Register & Procurement Profile
Companies House: Private Limited Company·Greater London·London·Ran 2 procurements for other authorities
Official UK PPONPNZN-9524-VCQJWebsitenetworkrail.co.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 13 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
221 awarded tenders, 337 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
An end date does not confirm a new procurement.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
8 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| Aggregate supply and track excavated waste | 21 Oct 2026 | 1d | £1,064,000,000 |
| UK4 - Tender Notice Template for CSM & RIR Framework | 2 Nov 2026 | 13d | £13,500,000 |
| Provision of 24/7 Chairs and Associated Services | 5 Nov 2026 | 16d | £4,600,000 |
| Provision of Aerial Survey of the UK Rail Network - LiDAR (Light Detection and Ranging) and Aerial Photography | 9 Nov 2026 | 20d | £12,000,000 |
| Operational Property Inspections Framework | 12 Nov 2026 | 23d | £36,000,000 |
| Station Advertising | 20 Nov 2026 | 31d | £1,900,000,000 |
| Rail Haulage | 2 Dec 2026 | 43d | £949,900,000 |
| Network Rail Dynamic Purchasing System (DPS) for Supply of Goods | 12 Jul 2027 | 264d | — |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work58 procedures · 15%50 Repair and maintenance services54 procedures · 14%34 Transport equipment and products53 procedures · 13%71 Architectural, construction, engineering49 procedures · 12% · 2 open72 IT services: consulting, software, internet43 procedures · 11%79 Business services: law, marketing, consulting38 procedures · 10% · 2 open60 Transport services (except waste transport)18 procedures · 5% · 2 open48 Software package and information systems17 procedures · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 397 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract71%(282 notices)
282 of 397 notices are Contract (71%).Framework29%(114 notices)
114 of 397 notices are Framework (29%).Dynamic purchasing system0%(1 notices)
1 of 397 notices are Dynamic purchasing system (0%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Route not published56%(223 notices)
223 of 397 notices are Route not published (56%).Selective17%(69 notices)
69 of 397 notices are Selective (17%).Direct award17%(66 notices)
66 of 397 notices are Direct award (17%).Open6%(22 notices)
22 of 397 notices are Open (6%).Limited / restricted4%(17 notices)
17 of 397 notices are Limited / restricted (4%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 13 lots from this buyer’s competitions, last 24 months.
i
How long this buyer takes to decide after bids close.
Middle value in days from deadline to first award notice, on this buyer’s own tenders.
Based on 20 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 397 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 5 lots with both an estimate and an award, last 24 months.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| AtkinsRéalis UK Ltd | 8 | 3.6% | 3 | 8 | 14 Oct 2026 |
| Amalgamated Construction Ltd | 8 | 3.6% | 0 | 17 | — |
| Balfour Beatty Rail Limited | 6 | 2.7% | 1 | 6 | 17 Sept 2026 |
| Oracle Corporation UK Limited | 5 | 2.3% | 5 | 6 | 12 May 2026 |
| Ground Control Limited | 5 | 2.3% | 4 | 5 | 23 Jul 2026 |
| QTS Group Ltd | 5 | 2.3% | 2 | 10 | — |
| SIEMENS MOBILITY LIMITED | 5 | 2.3% | 2 | 6 | 9 Jun 2026 |
| Taziker Industrial | 5 | 2.3% | 1 | 6 | 17 Sept 2026 |
The three most frequent suppliers are named on 10% of 221 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 337 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
An end date does not confirm a new procurement.
Published end dates only · 81 of 521 contracts carry one · not a retender forecast
Soonest 10 of 14 contracts ending within 18 months.
Recent procedures
Latest 50 of 754 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Insurance Brokerage ServicesFinancial and insurance services | Awarded / complete | 19 Oct 2026 | £500,000 |
| Open For Business - Saas Agreement - Oracle | Awarded / complete | 19 Oct 2026 | — |
| Lift and Escalator Consultant FrameworkLift-maintenance services | Planning | 15 Oct 2026 | £4,000,000 |
| project_47554 - #45669 - Conwy Tubes Track Renewal | Awarded / complete | 15 Oct 2026 | — |
| Supply of Liquid FuelsPetroleum and distillates | Planning | 14 Oct 2026 | £9,621,987 |
| East West Rail - Further Critical Works | Awarded / complete | 14 Oct 2026 | — |
| Stakeholder Engagement ServicesPublic relations consultancy services | Awarded / complete | 13 Oct 2026 | — |
| Employee Relations Case Management SystemSoftware package and information systems | Planning | 9 Oct 2026 | — |
| “Pop-Up” Management Agent ServiceNon-residential property renting or leasing services | Planned | 6 Oct 2026 | £5,000,000 |
| Provision of Services for Drugs & Alcohol Testing and Medication Advice LineDrug detection apparatus | Awarded / complete | 5 Oct 2026 | £10,000,000 |
| Potteric Carr SFC and 33kv Substation Service Agreement | Awarded / complete | 5 Oct 2026 | — |
| London Kings Cross & St Pancras (Platforms A&B) - Mechanical & ElectricalBuilding services | Awarded / complete | 1 Oct 2026 | £4,800,000 |
| Railhead Cleaning Technology Trial | Awarded / complete | 1 Oct 2026 | — |
| ESDD - High Output SurveysGeophysical surveys of archaeological sites | Planning | 1 Oct 2026 | £15,000,000 |
| Network Rail/Great British Railways Facilities Management Preliminary Market EngagementBuilding and facilities management services | Planning | 30 Sept 2026 | £2,400,000,000 |
| Operational Property InspectionsBuilding surveying services | Awarded / complete | 28 Sept 2026 | £1,500,000 |
| Non Rail Plant FrameworkRepair | Awarded / complete | 25 Sept 2026 | — |
| Remote Securing - Controller Software Detailed Design | Awarded / complete | 23 Sept 2026 | — |
| Upgrade GPR SIR30Railway-track maintenance services | Planned | 23 Sept 2026 | — |
| OLE SteelworksOverhead electrical equipment | Awarded / complete | 23 Sept 2026 | £240,000,000 |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 81 of 521 published contracts state an end date; those feed “Contracts ending”.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.