Kent and Medway Towns Fire Authority: Contract Register & Procurement Profile

Police & fireSouth East EnglandMaidstone

Official UK PPONPCTX-8834-ZQLL

Open now0no live notices
i

Tenders you can still bid for.

Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.

Notices, last 12 months30+30% vs prior 12 months (23)
i

Notices published in the last 12 months.

Counted per tender, not per lot, against the 12 months before where shown.

Typical bids per lot157.1% single-bid · 7 bid reports
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 7 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

Top-3 supplier share22%of 36 awarded procedures · 38 suppliers
i

How much of this buyer’s work goes to its three most frequent suppliers.

Share of its awarded tenders that name at least one of the top three. Each tender is counted once.

36 awarded tenders, 38 different suppliers.

Describes the record. It is not a sign of favouritism.

All awards we hold.

Contracts ending ≤18 months3none within 6 months
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

Published award value, 24m£25mnet · on 14 of 14 published values · top 5 = 96%
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

What they buy
i

What kind of work is bought here.

Notices by procurement category (CPV). A notice with several categories counts in each.

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

Last 24 months · 53 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i

How work here is packaged.

Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.

  • Contract79%(42 notices)
    42 of 53 notices are Contract (79%).
  • Framework21%(11 notices)
    11 of 53 notices are Framework (21%).
Procedure route
i

Which procedures buyers here use.

Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.

  • Open42%(22 notices)
    22 of 53 notices are Open (42%).
  • Route not published32%(17 notices)
    17 of 53 notices are Route not published (32%).
  • Direct award17%(9 notices)
    9 of 53 notices are Direct award (17%).
  • Limited / restricted9%(5 notices)
    5 of 53 notices are Limited / restricted (9%).
Typical bids per lot
i

How many companies usually bid when this buyer runs a tender.

Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.

Based on 7 lots from this buyer’s competitions, last 24 months.

Last 24 months, all categories.

1robust · n=757.1% of lots drew a single bid
Deadline → award
i

How long this buyer takes to decide after bids close.

Middle value in days from the bid deadline to the award date, on this buyer’s own tenders.

Based on 16 decided tenders across all categories, last 24 months.

Last 24 months.

226 daysrobust · n=16
Notice amendments
i

How often this buyer changes a notice after publishing it.

Middle number of amendments per notice. Deadline extensions and corrections both count.

Based on 53 notices across all categories, last 24 months.

Last 24 months.

021 of 53 notices amended
Award vs estimate
i

Do this buyer’s awards land above or below its own estimates.

Each lot’s published estimate against its award, on this buyer’s competitions, like for like.

Based on 5 lots with both an estimate and an award, last 24 months.

A past pattern, not a price to bid.

Last 24 months.

0% at estimaterobust · n=5

Who wins here
i

Which suppliers win the most here.

Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
FlamePro Global Ltdframework/DPS on 6616.7%667 Apr 2026
Hunter Apparel Solutions Limitedframework/DPS on 6616.7%667 Apr 2026
Ballyclare Limitedframework/DPS on 5513.9%557 Apr 2026
Eagle Technical Products Ltdframework/DPS on 4411.1%441 Apr 2026
Bristol Uniforms Ltdframework/DPS on 338.3%337 Apr 2026
Draeger Safety UK Ltd25.6%2230 Jun 2026
HG Mindworks Ltd25.6%2212 Mar 2026
Rosenbauer UK Limitedframework/DPS on 225.6%221 Apr 2026

The three most frequent suppliers are named on 22% of 36 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 38 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i

How much this buyer has awarded recently, by published values.

Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.

Published values, not actual spend. The biggest rows are listed so you can check.

£25mSum of published VAT-exclusive values on 14 of 14 published single-supplier values; the five largest make 96%; a further 11 published a VAT-inclusive amount only, kept apart.
Typical single-supplier award (24m)
i

The middle published award value for this buyer.

Middle value of the same awards as the total above.

Last 24 months.

£160k middle valuerobust · n=14Middle half £68k–£472k.
Largest published awards
i

The biggest published awards.

Awards to a single supplier with a published value, largest first, so you can check the totals against the notice.

A repeated framework total can appear here. Open the notice to check.

SupplierAwardedTermPublished value
Purchase of Fire AppliancesEmergency One (UK) Limited14 Apr 20265 yrs · up to 7.1 yrs£20,000,000
≈ £4.0m/yr
External Building, Minor Civil & Ground WorksAstral Limited—4 yrs£2,000,000 †
≈ £500k/yr
C25020 Electrical Reactive Repair and Installation WorksG M Monk Limited—3 yrs · up to 6 yrs£750,000 †
≈ £250k/yr
Supply of Panasonic Toughbooks CF-33 MK4 TabletsSpecialist Computer Centres Plc——£478,791 †
Fuel Management SystemOctane Holding Group Ltd4 Jun 20265 yrs · up to 10.1 yrs£450,000
≈ £90k/yr

Contracts ending
i

Contracts that finish in the next 18 months.

Contracts ending in that window by the published end date or, where only a duration is published, an estimate from signature plus duration (marked). Neither, not counted.

An end date does not confirm a new procurement.

27 of 30 contracts carry an end date, 1 estimated from the duration · not a retender forecast

Recent procedures

Latest 50 of 54 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
C25020 Electrical Reactive Repair and Installation WorksElectrical installation workAwarded / complete9 Jul 2026£750,000
C26042 - Smoke Machines - Pre-Market Engagement NoticeFirefighting equipmentPlanning1 Jul 2026£130,000
Purchase of Fire AppliancesEmergency vehiclesAwarded / complete30 Jun 2026£20,000,000
Supply and Maintenance of Gas MonitorsGas-detection apparatusAwarded / complete2 Jun 2026£200,000
C25075 - Fire Safety - Legal Support2 lotsLegal advisory and information servicesAwarded / complete29 May 2026£100,000
Specialist Legal SupportLegal servicesAwarded / complete21 May 2026—
C26035 - On Call ConsultationResearch and development consultancy servicesAwarded / complete19 May 2026—
Alerter System Support and MaintenanceAwarded / complete15 Apr 2026—
C25064 - Psychological Wellbeing ServiceAwarded / complete14 Apr 2026—
Insurance Broker and AdvisorInsurance servicesAwarded / complete13 Mar 2026—
C25064 - Psychological Wellbeing ServiceCompany health servicesAwarded / complete12 Mar 2026£120,000
Procurement Legal ServiceLegal servicesAwarded / complete11 Mar 2026—
CradlePoint Communication System- Licence RenewalAwarded / complete27 Feb 2026—
Planned & Reactive Maintenance, Servicing and Installations of Plumbing, HVAC & BMS SystemsAir-conditioning appliancesOpen20 Feb 2026£2,100,000
C23065 - HR Legal Support (Retainer)Legal servicesAwarded / complete19 Feb 2026—
C26006 - Business RatesConstruction consultancy servicesAwarded / complete22 Jan 2026—
Supply of Panasonic Toughbooks CF33 MK4Information systemsAwarded / complete6 Jan 2026—
C25020 Electrical Reactive Repair and Installation WorksElectrical installation workPlanning4 Dec 2025£500,000
C25052 - Information Architect ConsultancySystems and technical consultancy servicesAwarded / complete2 Dec 2025—
C24083 - Consultancy for SustainabilityInfrastructure works consultancy servicesAwarded / complete25 Nov 2025—

Search all 54 procedures for this authority →

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 27 of 30 published contracts have an end date; 1 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.