Retender radar: UK public contracts ending soon

Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 501–550

  1. Ends · in 206 days

    Bridgwater Town Hall Refurbishment & Extension 2026

    Bridgwater Town Council · Local authority · South West England

    Incumbent: Qube Construct Ltd

    • Construction work
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 7 May 2027 · start not published
    Reference
    ocds-h6vhtk-064e6f
  2. Ends · in 207 days

    Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Incumbent: SWG Construction (Build and Renovate) Ltd

    • Building construction work
    Contract value
    £5.5m
    Annual run-rate
    £1.9mvalue ÷ published term
    Term
    20 May 2024 → 8 May 2027 · 2.9 yrs
    Reference
    ocds-h6vhtk-040c90
  3. Ends · in 207 days

    Museum of Two Halves – Base Build Construction Works (Shell & Core)

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Incumbent: SWG Construction (Build and Renovate) Ltd

    • Building construction work
    Contract value
    £5.4m
    Annual run-rate
    £1.8mvalue ÷ published term
    Term
    20 May 2024 → 8 May 2027 · 2.9 yrs
    Reference
    ocds-h6vhtk-040c90
  4. Ends · in 209 days

    Lot 1 - Upper Rhymney Valley

    Caerphilly County Borough Council · Local authority · Wales (Cymru)

    Incumbent: Deco Glass & Glazing Ltd

    • Building completion work
    • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
    • Repair and maintenance services of building installations
    Contract value
    £450k
    Annual run-rate
    £450kvalue ÷ published term
    Term
    11 May 2026 → 10 May 2027 · 11 months
    Reference
    ocds-h6vhtk-05e8bd
  5. Ends · in 209 days

    Lot 2 - Eastern Valleys

    Caerphilly County Borough Council · Local authority · Wales (Cymru)

    Incumbent: Gary Carpenter Building Contractors

    • Building completion work
    • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
    • Repair and maintenance services of building installations
    Contract value
    £450k
    Annual run-rate
    £450kvalue ÷ published term
    Term
    11 May 2026 → 10 May 2027 · 11 months
    Reference
    ocds-h6vhtk-05e8bd
  6. Ends · in 209 days

    Lot 3 - Lower Rhymney Valley

    Caerphilly County Borough Council · Local authority · Wales (Cymru)

    Incumbent: Cardo Group (Wales and West) Limited

    • Building completion work
    • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
    • Repair and maintenance services of building installations
    Contract value
    £450k
    Annual run-rate
    £450kvalue ÷ published term
    Term
    11 May 2026 → 10 May 2027 · 11 months
    Reference
    ocds-h6vhtk-05e8bd
  7. Ends · in 209 daysPanel · 2 suppliers

    Lot 4 - Reserve

    Caerphilly County Borough Council · Local authority · Wales (Cymru)

    Panel: ALPHA BUILDING GROUP LTD, Fusion Electrical & Building Services Engineering Ltd

    • Building completion work
    • Construction work for buildings relating to leisure, sports, culture, lodging and restaurants
    • Repair and maintenance services of building installations
    Contract value
    £450k
    Annual run-rate
    —panel, not one supplier
    Term
    7 Aug 2026 → 10 May 2027 · 9 months
    Reference
    ocds-h6vhtk-05e8bd
  8. Ends · in 210 daysFramework re-let

    IA2882 The Provision and Installation of Windows and Doors

    Staffordshire County Council · Local authority · West Midlands

    Incumbent: Strata Double Glazing & Joinery Centre Ltd

    • Installation of doors and windows
    • Installation of doors and windows and related components
    Contract value
    Not published
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 11 May 2027 · start not published
    Reference
    ocds-h6vhtk-038ca1
  9. Ends · in 210 daysFramework re-let

    IA2882 The Provision and Installation of Windows and Doors

    Staffordshire County Council · Local authority · West Midlands

    Incumbent: Goliath Home World Ltd

    • Installation of doors and windows
    • Installation of doors and windows and related components
    Contract value
    Not published
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 11 May 2027 · start not published
    Reference
    ocds-h6vhtk-038ca1
  10. Ends · in 210 daysFramework re-let

    IA2882 The Provision and Installation of Windows and Doors

    Staffordshire County Council · Local authority · West Midlands

    Incumbent: Carson Powell Construction Ltd

    • Installation of doors and windows
    • Installation of doors and windows and related components
    Contract value
    Not published
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 11 May 2027 · start not published
    Reference
    ocds-h6vhtk-038ca1
  11. Ends · in 213 daysFramework re-let

    De Grey Street Frontage Improvement Scheme

    Hull City Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: Geo Houlton & Sons Ltd (Appointed to Lots 1, 2 & 3)

    • Construction work
    Contract value
    £1.8mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    12 Oct 2026 → 14 May 2027 · 7 months
    Reference
    ocds-h6vhtk-0687e7
  12. Ends · in 213 days

    Marine Lake Project, Weston-super-Mare

    North Somerset Council · Local authority · South West England

    Incumbent: EJ McGrath Construction Limited

    • Construction work
    Contract value
    £856k
    Annual run-rate
    £531kvalue ÷ published term
    Term
    3 Oct 2025 → 14 May 2027 · 1.6 yrs
    Reference
    ocds-h6vhtk-052c09
  13. Ends · in 216 days

    Network Cabling Replacements

    Gateshead College · Education · North East England

    Incumbent: GreySpace Advisory

    • Installation of computer cabling
    Contract value
    £100kinc. VAT as published
    Annual run-rate
    £100kvalue ÷ published term
    Term
    18 May 2026 → 17 May 2027 · 11 months
    Reference
    ocds-h6vhtk-0663f8
  14. Ends · in 217 days

    West Way Sports Hub: Proposed Active Track & Ancillary Developments

    Chorley Council · Local authority · North West England

    Incumbent: Landscape Engineering Ltd

    • Construction work
    Contract value
    £402k
    Annual run-rate
    £401kvalue ÷ published term
    Term
    18 May 2026 → 18 May 2027 · 1 yrs
    Reference
    ocds-h6vhtk-0595a6
  15. Ends · in 218 days

    Refurbishment of The Civic Centre

    Runnymede Borough Council · Local authority

    Incumbent: M & J GROUP (CONSTRUCTION & ROOFING) LTD

    • Building construction work
    • Construction work
    • Refurbishment work
    Contract value
    £2.1m
    Annual run-rate
    £2.9mvalue ÷ published term
    Term
    26 Aug 2026 → 19 May 2027 · 8 months
    Reference
    ocds-h6vhtk-058432
  16. Ends · in 219 days

    DISABLED ADAPTATION WORKS at 29 Manse Road Burley in Wharfedale LS29 7LB

    City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber

    Incumbent: Harrison Property Solutions Ltd

    • Bathrooms construction work
    • Building construction work
    • Construction work
    Contract value
    £53k
    Annual run-rate
    £53kvalue ÷ published term
    Term
    21 May 2026 → 20 May 2027 · 11 months
    Reference
    ocds-h6vhtk-0600b7
  17. Ends · in 220 days

    Goldthorpe Housing Project Phase 2a New Build and Phase 2b Public Realm

    Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: Keystone Yorkshire Ltd

    • Building construction work
    • Construction work for multi-dwelling buildings and individual houses
    • Houses construction work
    Contract value
    £3.0m
    Annual run-rate
    £2.9mvalue ÷ published term
    Term
    11 May 2026 → 21 May 2027 · 1 yrs
    Reference
    ocds-h6vhtk-05026b
  18. Ends · in 223 days

    TD2288 - Rosehill Children's Centre Replacement of Existing Passenger Lift

    Derby City Council · Local authority · East Midlands

    Incumbent: Concept Elevators (UK) Ltd

    • Lift installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £110k
    Annual run-rate
    £69kvalue ÷ published term
    Term
    20 Oct 2025 → 24 May 2027 · 1.6 yrs
    Reference
    ocds-h6vhtk-055d6d
  19. Ends · in 226 daysExtension option · up to 27 May 2029Buyer plans to re-tender 1 Sept 2028

    Window and Rear Door Replacement Programme

    Reading Borough Council · Local authority · South East England

    Incumbent: C W G GROUP LTD

    • Installation of door and window frames
    • Installation of door frames
    • Installation of doors and windows and related components
    Contract value
    £4.2m
    Annual run-rate
    £4.2mvalue ÷ published term
    Term
    28 May 2026 → 27 May 2027 · 11 months · up to 27 May 2029 with extensions
    Reference
    ocds-h6vhtk-059cde
  20. Ends · in 227 days

    Becoming America- Exhibition Fit-out

    Science Museum Group · Central government

    Incumbent: Lucidblack Ltd

    • Construction work for art and cultural buildings
    • Construction work for buildings relating to exhibitions
    Contract value
    £196k
    Annual run-rate
    £225kvalue ÷ published term
    Term
    15 Jul 2026 → 28 May 2027 · 10 months
    Reference
    ocds-h6vhtk-067dbe
  21. Ends · in 228 days

    Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South)

    Renfrewshire Council · Local authority · Scotland

    Incumbent: Farrans Construction trading as a division of Northstone (NI) Ltd.

    • Bridge
    • Civil engineering consultancy services
    • Civil engineering support services
    Contract value
    £35m
    Annual run-rate
    —start date not published
    Term
    Ends 29 May 2027 · start not published
    Reference
    ocds-h6vhtk-03b4a6
  22. Ends · in 230 daysFramework re-letPanel · 16 suppliers

    Lot 1 - Playground Equipment

    ESPO · Nationwide (UK)

    Panel: Dragon Play and Sports, EIBEPLAY LIMITED, Fawns Recreational Services Ltd +13 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  23. Ends · in 230 daysFramework re-letPanel · 9 suppliers

    Lot 7 - Wet pour Rubber Surfacing

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, CREATIVE PLAY (UK) LIMITED +6 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  24. Ends · in 230 daysFramework re-letPanel · 12 suppliers

    Lot 8.1 - Sport and Play Surface - Synthetic Artificial Grass

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, Axo Leisure Ltd +9 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  25. Ends · in 230 daysFramework re-letPanel · 10 suppliers

    Lot 8.2 - Sport and Play Surface - Needle Punched Carpet

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, Axo Leisure Ltd +7 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  26. Ends · in 230 daysFramework re-letPanel · 9 suppliers

    Lot 9 - Football - 3rd Generation Synthetic Grass (3G) Pitch

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Ace Play Limited, Axo Leisure Ltd +6 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  27. Ends · in 230 daysFramework re-letPanel · 6 suppliers

    Lot 10.1 - Tennis Courts - Macadam

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Axo Leisure Ltd, Blakedown Sport & Play Limited +3 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  28. Ends · in 230 daysFramework re-letPanel · 6 suppliers

    Lot 10.2 - Tennis Courts - Synthetic Grass

    ESPO · Nationwide (UK)

    Panel: Abacus Playgrounds Ltd, Axo Leisure Ltd, Blakedown Sport & Play Limited +3 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  29. Ends · in 230 daysFramework re-letPanel · 2 suppliers

    Lot 11 - Indoor Sensory and Soft Play Equipment

    ESPO · Nationwide (UK)

    Panel: Ace Play Limited, Sensory Technology Ltd

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  30. Ends · in 230 daysFramework re-letPanel · 3 suppliers

    Lot 12 - Splash / Water Parks

    ESPO · Nationwide (UK)

    Panel: FOUNTAINEERS LIMITED, SPLASH PADS ENTERPRISES LIMITED, USTIGATE LIMITED

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  31. Ends · in 230 daysFramework re-letPanel · 8 suppliers

    Lot 13 - Inspection Reports - Play Equipment (including Surfacing) and Outdoor Sports

    ESPO · Nationwide (UK)

    Panel: Ace Play Limited, Dragon Play and Sports, EIBEPLAY LIMITED +5 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  32. Ends · in 230 daysFramework re-letPanel · 12 suppliers

    Lot 2 - Bespoke Design Playground Equipment / Play areas

    ESPO · Nationwide (UK)

    Panel: EIBEPLAY LIMITED, Fawns Recreational Services Ltd, GARDEN ESCAPES IRELAND LTD +9 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  33. Ends · in 230 daysFramework re-letPanel · 12 suppliers

    Lot 3.1 - Multi Use Games Area (MUGA) - Steel - Macadam Surface

    ESPO · Nationwide (UK)

    Panel: Blakedown Sport & Play Limited, EIBEPLAY LIMITED, Fosse Contracts Limited +9 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  34. Ends · in 230 daysFramework re-letPanel · 11 suppliers

    Lot 3.2 - Multi Use Games Area (MUGA) - Steel - Synthetic Grass Surface (Sand Filled)

    ESPO · Nationwide (UK)

    Panel: Blakedown Sport & Play Limited, EIBEPLAY LIMITED, Fosse Contracts Limited +8 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  35. Ends · in 230 daysFramework re-letPanel · 6 suppliers

    Lot 3.3 - Multi Use Games Area (MUGA) - Timber on Steel Frame - Macadam Surface

    ESPO · Nationwide (UK)

    Panel: Blakedown Sport & Play Limited, EIBEPLAY LIMITED, KOMPAN Limited +3 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  36. Ends · in 230 daysFramework re-letPanel · 6 suppliers

    Lot 3.4 - Multi Use Games Area (MUGA) - Timber on Steel Frame - Synthetic Grass Surface (Sand Filled)

    ESPO · Nationwide (UK)

    Panel: Blakedown Sport & Play Limited, EIBEPLAY LIMITED, KOMPAN Limited +3 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  37. Ends · in 230 daysFramework re-letPanel · 7 suppliers

    Lot 4 - Skateparks / BMX Parks - In-Situ Concrete

    ESPO · Nationwide (UK)

    Panel: Bendcrete Leisure LTD, Betongpark Limited, Canvas Spaces Limited +4 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  38. Ends · in 230 daysFramework re-letPanel · 3 suppliers

    Lot 5 - Other Wheeled Sports Areas - Asphalt

    ESPO · Nationwide (UK)

    Panel: BACK-ON-TRACK MOUNTAIN BIKE SOLUTIONS LIMITED, EIBEPLAY LIMITED, Safeplay Playground Services Ltd

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  39. Ends · in 230 daysFramework re-letPanel · 10 suppliers

    Lot 6 - Outdoor Fitness Equipment

    ESPO · Nationwide (UK)

    Panel: CREATIVE PLAY (UK) LIMITED, Dragon Play and Sports, EIBEPLAY LIMITED +7 more

    • Artificial grass
    • Chairs
    • Construction work for sports facilities
    Contract value
    £140mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-04b234
  40. Ends · in 230 days

    Heating Systems Servicing, Maintenance and Inspections with Installation Works 2023

    Dover District Council · Local authority · South East England

    Incumbent: Sureserve Compliance North Limited

    • Central-heating installation work
    Contract value
    £5.1m
    Annual run-rate
    —start date not published
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-0389b7
  41. Ends · in 230 days

    Homes England - Lea Castle, Kidderminster – Groundwater Remediation Works

    Homes England (the name adopted by the Homes and Communities Agency) · Other public body · West Midlands

    Incumbent: Arcadis UK Limited

    • Groundwater pollution monitoring or control services
    • Groundwater pollution treatment or rehabilitation
    • Site preparation work
    Contract value
    £2.1m
    Annual run-rate
    —start date not published
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-042293
  42. Ends · in 230 daysFramework re-letPanel · 2 suppliers

    NRW Timber signs and structures 2023-2027

    Natural Resources Wales · Wales (Cymru)

    Panel: Signs Workshop Limited, The Creative Core Group Ltd

    • Signage
    • Timber
    • Woodwork
    Contract value
    £750kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-03b676
  43. Ends · in 230 days

    Planned Preventative Maintenance and Responsive Repairs to Drainage Systems and Water/Sewage Pumps

    Southend City Council · Local authority · East of England

    Incumbent: CCR Property Services Ltd

    • Burglar-alarm system installation work
    • Drainage works
    • Dredging and pumping works
    Contract value
    £698k
    Annual run-rate
    —start date not published
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-042b30
  44. Ends · in 230 daysExtension option · up to 31 May 2031

    Concrete Repairs

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Incumbent: SPECIALIST UK RESTORATIONS LIMITED

    • Concrete carcassing work
    • Concrete repair work
    • Concrete work
    Contract value
    £600k
    Annual run-rate
    £344kvalue ÷ published term
    Term
    2 Sept 2025 → 31 May 2027 · 1.7 yrs · up to 31 May 2031 with extensions
    Reference
    ocds-h6vhtk-05113c
  45. Ends · in 230 days

    RCC-1655 DESIGN, BUILD AND INSTALLATION OF THE 'DIGGING RUTLAND GALLERY FROM STONE AGE TO ANGLO SAXON' FOR THE RUTLAND COUNTY MUSEUM

    Rutland County Council · Local authority · East Midlands

    Incumbent: VERTIGO CREATIVE STUDIO LIMITED

    • Construction work
    Contract value
    £451k
    Annual run-rate
    £658kvalue ÷ published term
    Term
    24 Sept 2026 → 31 May 2027 · 8 months
    Reference
    ocds-h6vhtk-0684a2
  46. Ends · in 230 days

    Car park resurfacing - wharf road level 4

    South Kesteven District Council · Local authority · East Midlands

    Incumbent: Rio Asphalt & Paving Co. Limited

    • Car park building construction work
    Contract value
    £300kinc. VAT as published
    Annual run-rate
    £300kvalue ÷ published term
    Term
    1 Jun 2026 → 31 May 2027 · 11 months
    Reference
    ocds-h6vhtk-066517
  47. Ends · in 230 days

    Inspection, testing and responsive repairs to Intruder Systems

    Southend City Council · Local authority · East of England

    Incumbent: Blake Contractors Ltd

    • Burglar-alarm system installation work
    • Drainage works
    • Dredging and pumping works
    Contract value
    £294k
    Annual run-rate
    —start date not published
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-042b30
  48. Ends · in 230 daysFramework re-let

    Supply and Installation of Burial Chambers

    Sandwell Metropolitan Borough Council · Local authority · West Midlands

    Incumbent: Gem Precast

    • Cemetery services
    • Cemetery works
    Contract value
    £268kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-03c448
  49. Ends · in 230 days

    Inspection, testing and responsive repairs to Fire Suppression Systems

    Southend City Council · Local authority · East of England

    Incumbent: Churches Fire Security Ltd

    • Burglar-alarm system installation work
    • Drainage works
    • Dredging and pumping works
    Contract value
    £96k
    Annual run-rate
    —start date not published
    Term
    Ends 31 May 2027 · start not published
    Reference
    ocds-h6vhtk-042b30
  50. Ends · in 230 daysExtension option · up to 31 May 2028

    Provision of PA, Staging and Lighting for ACBCBC Events within the Tourism, Arts and Culture Department

    Armagh, Banbridge & Craigavon Borough Council · Local authority

    Incumbent: McCusker Pro Audio ltd

    • Electrical equipment and apparatus
    • Event services
    • Lighting equipment and electric lamps
    Contract value
    £80kinc. VAT as published
    Annual run-rate
    £80kvalue ÷ published term
    Term
    1 Jun 2026 → 31 May 2027 · 11 months · up to 31 May 2028 with extensions
    Reference
    ocds-h6vhtk-067621
How to read the radar
  • End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.