Health and Safety Executive: Contract Register & Procurement Profile
GOV.UK register: Executive non-departmental public body·Central government·North West England·Liverpool·Ran 1 procurement for other authorities
Official UK PPONPBXM-4389-TXVZ
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 18 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
53 awarded tenders, 71 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
1 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| Transmission Electron Microscope (TEM) with Energy Dispersive X-Ray Spectroscopy (EDS) for asbestos analysis | 9 Oct 2026 | 9d | £400,000 |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
38 Laboratory, optical and precision22 procedures · 28% · 1 open24 Chemical products8 procedures · 10%44 Construction structures and materials8 procedures · 10%45 Construction work7 procedures · 9%72 IT services: consulting, software, internet6 procedures · 8%71 Architectural, construction, engineering5 procedures · 6%42 Industrial machinery4 procedures · 5%79 Business services: law, marketing, consulting4 procedures · 5%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 79 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 94% (74 notices)
- Framework 4% (3 notices)
- Dynamic purchasing system 3% (2 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Open 75% (59 notices)
- Direct award 13% (10 notices)
- Route not published 9% (7 notices)
- Limited / restricted 3% (2 notices)
- Selective 1% (1 notices)
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 18 lots from this buyer’s competitions, last 24 months.
i
How long this buyer takes to decide after bids close.
Middle value in days from deadline to first award notice, on this buyer’s own tenders.
Based on 13 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 79 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 12 lots with both an estimate and an award, last 24 months.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| CASTLE OWEN CONSTRUCTION AND PROPERTY CONSULTANTS LIMITED | 2 | 3.8% | 1 | 2 | 18 Sept 2026 |
| Mintel Group Ltd | 2 | 3.8% | 1 | 2 | 7 Nov 2025 |
| PA CONSULTING SERVICES LTD | 2 | 3.8% | 1 | 2 | 12 Dec 2025 |
| Q Associates Limited | 2 | 3.8% | 0 | 2 | 18 Jan 2023 |
| ESRI (UK) Limited | 2 | 3.8% | 0 | 2 | 14 Feb 2023 |
| NRC Services Limited | 1 | 1.9% | 1 | 2 | 13 Mar 2026 |
| Capita Business Services Ltd | 1 | 1.9% | 1 | 1 | 3 Mar 2025 |
| EMBER TECHNOLOGY LTD | 1 | 1.9% | 1 | 1 | 13 Apr 2026 |
The three most frequent suppliers are named on 11% of 53 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 71 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
Published end dates only · 16 of 72 contracts carry one · not a retender forecast
Recent procedures
Latest 50 of 128 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| The Provision of Approved Documents Review Digital Research | Awarded / complete | 26 Mar 2026 | — |
| Pesticide Usage Survey (PUS)Pesticides pollution assessment | Awarded / complete | 24 Mar 2026 | £2,560,000 |
| FOR THE INVESTIGATION OF REAL FIRESProvision of services to the community | Awarded / complete | 24 Mar 2026 | £420,000 |
| 80 mm Cryogenic Control ValveIndustrial process control equipment | Open | 16 Mar 2026 | £20,000 |
| THE UPGRADE AND REPLACEMENT OF LV ELECTRICAL INFRASTRUCTURE TO BUILDINGS 112 & 113Construction work | Awarded / complete | 13 Mar 2026 | £290,000 |
| THE PROVISION OF LEAVE/HOLIDAY MANAGEMENT SOFTWARE AS A SERVICE SOLUTIONIT services: consulting | Awarded / complete | 13 Mar 2026 | £140,000 |
| Liquid Hydrogen Supply for Experimental ProgrammeGases | Open | 25 Feb 2026 | £400,000 |
| 80 mm Vacuum Insulated Control ValveIndustrial process control equipment | Open | 17 Feb 2026 | £20,000 |
| Gaseous Hydrogen Supply for Experimental ProgrammeIndustrial gases | Open | 12 Feb 2026 | £80,000 |
| Gaseous Hydrogen Pressure Reduction StationIndustrial process control equipment and remote-control equipment | Open | 12 Feb 2026 | £35,000 |
| Liquid Hydrogen Flow Conditioning Module for Experimental ProgrammeIndustrial process control equipment | Open | 12 Feb 2026 | £80,000 |
| 3" Cryogenic Vent Stack with Changeable TerminationsPipeline | Open | 11 Feb 2026 | £25,000 |
| 25 mm Vacuum Insulated Control ValveIndustrial process control equipment | Open | 11 Feb 2026 | £23,000 |
| National Calculation Methodology Contract(s)Architectural | Planning | 23 Jan 2026 | £889,400 |
| FOR ACCESS IMPROVEMENT WORKS TO THE ROAD BETWEEN QUARRY AND CHAFF BUNKERS HSE SITE IN BUXTONConstruction structures and materials; auxiliary products to construction (except electric apparatus) | Awarded / complete | 14 Jan 2026 | £55,000 |
| 1" Cryogenic Vacuum Insulated Control ValveIndustrial process control equipment | Planned | 5 Jan 2026 | £22,000 |
| 3" Cryogenic ValveIndustrial process control equipment | Planned | 5 Jan 2026 | £18,000 |
| 3" Cryogenic Hydrogen Vent Stack with Changeable TerminationsIndustrial process control equipment | Planned | 5 Jan 2026 | £25,000 |
| THE PROVISION OF RESEARCH INTO FIRE SAFETY ACCESS AND FACILITIES IN BUILDINGSResearch and development services and related consultancy services | Awarded / complete | 23 Dec 2025 | £150,700 |
| Gaseous Hydrogen Pressure Reduction Station for Experimental ProgrammeIndustrial process control equipment | Planned | 22 Dec 2025 | — |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£265m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 28 award records on 26 procedures (28 to a single canonical supplier, 0 multi-supplier). 8 values come from the contract record when the award carried none.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 16 of 72 published contracts carry a period end; 4 end within 18 months, 0 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (16 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PBXM-4389-TXVZ