Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 576–600

  1. Ends · in 251 days

    West Hall Goods Lift Construction

    Science Museum Group · Central government

    Incumbent: Arrow Lift Engineers Ltd

    • Goods lifts
    • Lift and escalator installation work
    • Lift installation work
    Contract value
    £526k
    Annual run-rate
    £643kvalue ÷ published term
    Term
    27 Aug 2026 → 21 Jun 2027 · 9 months
    Reference
    ocds-h6vhtk-069daf
  2. Ends · in 251 daysExtension option · up to 30 Sept 2027

    Thicket Crescent & Thicket Road Energy Efficient Retrofit Works - Fire Safety Works

    London Borough of Sutton · Local authority · Greater London

    Incumbent: A P C BUILDING SERVICES (LONDON) LIMITED

    • Construction work
    Contract value
    £188k
    Annual run-rate
    £188kvalue ÷ published term
    Term
    22 Jun 2026 → 21 Jun 2027 · 11 months · up to 30 Sept 2027 with extensions
    Reference
    ocds-h6vhtk-05ab78
  3. Ends · in 251 daysExtension option · up to 30 Sept 2027

    Thicket Crescent & Thicket Road Energy Efficient Retrofit Works - External Fabric Repairs

    London Borough of Sutton · Local authority · Greater London

    Incumbent: A P C BUILDING SERVICES (LONDON) LIMITED

    • Construction work
    Contract value
    £104k
    Annual run-rate
    £104kvalue ÷ published term
    Term
    22 Jun 2026 → 21 Jun 2027 · 11 months · up to 30 Sept 2027 with extensions
    Reference
    ocds-h6vhtk-05ab79
  4. Ends · in 253 days

    Drill/Training Tower Construction at West Denton Fire Station

    Tyne and Wear Fire and Rescue Authority · Police & fire · Nationwide (UK)

    Incumbent: Crofton Engineering Limited

    • Construction work
    • Fire station construction work
    Contract value
    £178k
    Annual run-rate
    £178kvalue ÷ published term
    Term
    24 Jun 2026 → 23 Jun 2027 · 11 months
    Reference
    ocds-h6vhtk-060739
  5. Ends · in 254 days

    New Drive Train Facility (NDTF)

    ORE Catapult · Other public body · North East England

    Incumbent: Galliford Try Construction Limited

    • Building construction work
    • Construction work
    • Project and design preparation, estimation of costs
    Contract value
    £30minc. VAT as published
    Annual run-rate
    £18mvalue ÷ published term
    Term
    9 Oct 2025 → 24 Jun 2027 · 1.7 yrs
    Reference
    ocds-h6vhtk-058366
  6. Ends · in 254 days

    PLACE 122 Markham Vale Site Maintenance

    Derbyshire County Council · Local authority · East Midlands

    Incumbent: T & I Landscapes

    • Construction work
    Contract value
    £118k
    Annual run-rate
    —start date not published
    Term
    Ends 24 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-033fa4
  7. Ends · in 255 days

    Bedlington Town Centre Phase 3

    ADVANCE NORTHUMBERLAND (COMMERCIAL) LIMITED · Other public body · North East England

    Incumbent: Tri Construction Limited

    • Construction work
    Contract value
    £3.6m
    Annual run-rate
    £4.8mvalue ÷ published term
    Term
    29 Sept 2026 → 25 Jun 2027 · 8 months
    Reference
    ocds-h6vhtk-065c4e
  8. Ends · in 258 days

    Demolition of Staff Accomodations

    North West Anglia NHS Foundation Trust · Central government · East of England

    Incumbent: Harte Demolition Ltd

    • Asbestos-removal work
    • Demolition, site preparation and clearance work
    Contract value
    £263k
    Annual run-rate
    £267kvalue ÷ published term
    Term
    3 Jul 2026 → 28 Jun 2027 · 11 months
    Reference
    ocds-h6vhtk-05eb64
  9. Ends · in 260 daysFramework re-letPanel · 5 suppliers

    Projects with an estimated construction value over £8m

    Broadland Development Services Limited · East of England

    Panel: ASPEN BUILD (EAST ANGLIA) LIMITED, E.N. Suiter & Sons Limited, Lovell Partnerships Ltd +2 more

    • Building construction work
    • Construction work
    • Construction work for houses
    Contract value
    £100mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-049339
  10. Ends · in 260 daysFramework re-letPanel · 6 suppliers

    Projects with an estimated construction value up to £8m

    Broadland Development Services Limited · East of England

    Panel: ASPEN BUILD (EAST ANGLIA) LIMITED, E.N. Suiter & Sons Limited, Fox Construction Eastern Limited +3 more

    • Building construction work
    • Construction work
    • Construction work for houses
    Contract value
    £50mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-049339
  11. Ends · in 260 days

    North Shields Ferry Landing Relocation Design & Build

    Tyne and Wear Passenger Transport Executive · North East England

    Incumbent: McLaughlin and Harvey Limited

    • Construction work
    • Marine construction works
    Contract value
    £24m
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-04552e
  12. Ends · in 260 daysFramework re-letPanel · 3 suppliers

    Specialist Highway Patching Framework 2025 - 2027

    Cumberland Council · Local authority · North West England

    Panel: Archway Roadmaster UK Ltd., NU-PHALT CONTRACTING LIMITED, Velocity UK Ltd

    • Surface work for highways
    Contract value
    £3.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    9 Jul 2025 → 30 Jun 2027 · 1.9 yrs
    Reference
    ocds-h6vhtk-05010e
  13. Ends · in 260 days

    291 Harrow Road Pre-Construction Services, Enabling and Main Works

    Westminster City Council · Local authority · Nationwide (UK), Greater London

    Incumbent: WATES CONSTRUCTION LIMITED

    • Construction work for houses
    Contract value
    £2.5m
    Annual run-rate
    £2.6mvalue ÷ published term
    Term
    15 Jul 2026 → 30 Jun 2027 · 11 months
    Reference
    ocds-h6vhtk-0516f3
  14. Ends · in 260 days

    Paisley Grammar School Community Campus (PGSCC) - Principal Contractor (PC)

    Renfrewshire Council · Local authority · Scotland

    Incumbent: Galliford Try Construction Limited

    • Building construction work
    • Construction work
    • Secondary school construction work
    Contract value
    £2.0m
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-02dcab
  15. Ends · in 260 days

    TD2236 - Electrical Equipment & Fixed Wire Testing Services

    Derby City Council · Local authority · East Midlands

    Incumbent: Security and Fire Experts Ltd

    • Electrical equipment and apparatus
    • Electrical services
    • Electrical wiring work
    Contract value
    £450k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-04e671
  16. Ends · in 260 daysFramework re-letExtension option · up to 30 Jun 2029

    e-ITT for the provision of Framework for the Design, Supply, Erection and Hire of Independent Scaffolding

    New Forest District Council · Local authority · South East England

    Incumbent: S&K Scaffolding Ltd

    • Scaffolding work
    Contract value
    £330kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Jul 2025 → 30 Jun 2027 · 1.9 yrs · up to 30 Jun 2029 with extensions
    Reference
    ocds-h6vhtk-05088e
  17. Ends · in 260 days

    Paisley Grammar School Community Campus (PGSCC) - Principal Contractor (PC)

    Renfrewshire Council · Local authority · Scotland

    Incumbent: Galliford Try Construction Limited

    • Building construction work
    • Construction work
    • Secondary school construction work
    Contract value
    £229k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-02dcab
  18. Ends · in 260 daysExtension option · up to 30 Jun 2028

    Sanctuary Scheme for victims of Domestic Abuse in Milton Keynes

    Milton Keynes City Council · Local authority

    Incumbent: 24-7 Locks Ltd

    • Compulsory social security services
    • Engineering work for security installations
    • Other community, social and personal services
    Contract value
    £120k
    Annual run-rate
    £60kvalue ÷ published term
    Term
    1 Jul 2025 → 30 Jun 2027 · 1.9 yrs · up to 30 Jun 2028 with extensions
    Reference
    ocds-h6vhtk-05074c
  19. Ends · in 260 days

    PAN3380 - Installation of Public Toilets Access Control System

    Leicester City Council · Local authority · East Midlands

    Incumbent: Armson Electrical Services Ltd

    • Construction work
    Contract value
    £115k
    Annual run-rate
    £116kvalue ÷ published term
    Term
    1 Jul 2026 → 30 Jun 2027 · 11 months
    Reference
    ocds-h6vhtk-066065
  20. Ends · in 260 daysFramework re-let

    Passenger Lift Servicing and Repairs - Leeds Building Services

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: Ace Elevators Ltd

    • Lift and escalator installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £99kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-056708
  21. Ends · in 260 daysFramework re-let

    Passenger Lift Servicing and Repairs - Leeds Building Services

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: E A Foulds Ltd t/as Foulds Lifts

    • Lift and escalator installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £99kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-056708
  22. Ends · in 260 daysFramework re-let

    Passenger Lift Servicing and Repairs - Leeds Building Services

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: PICKERINGS EUROPE LIMITED

    • Lift and escalator installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £99kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-056708
  23. Ends · in 261 days

    Watergate School Expansion Project 2023

    London Borough of Lewisham · Local authority · Greater London

    Incumbent: Neilcott Construction Limited

    • Building construction work
    Contract value
    £9.0m
    Annual run-rate
    —start date not published
    Term
    Ends 1 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04265d
  24. Ends · in 261 daysExtension option · up to 1 Jul 2028

    Stourbridge Main Contractor

    Greensquareaccord · West Midlands

    Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED

    • Building construction work
    • Construction work
    • Construction work for houses
    Contract value
    £3.7m
    Annual run-rate
    £3.0mvalue ÷ published term
    Term
    1 Apr 2026 → 1 Jul 2027 · 1.3 yrs · up to 1 Jul 2028 with extensions
    Reference
    ocds-h6vhtk-05992f
  25. Ends · in 261 days

    Contract for Supply and Installation of PIV at Townhill

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Envirovent Limited

    • Electrical installation work
    • Electrical installation work of heating and other electrical building-equipment
    • Heating, ventilation and air-conditioning installation work
    Contract value
    £25k
    Annual run-rate
    £25kvalue ÷ published term
    Term
    1 Jul 2026 → 1 Jul 2027 · 1 yrs
    Reference
    ocds-h6vhtk-05de7e
How to read the radar
  • End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.