East West Rail Company Limited: Contract Register & Procurement Profile

Central governmentSouth East EnglandMILTON KEYNES

Find a Tender organisation id17466

What they buy
i

Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each

How they buy
i

Last 24 months · 27 notices · commercial tool and route as published on the notice, not a legal-regime claim

Commercial tool
i
  • Contract81%(22 notices)
    22 of 27 notices are Contract (81%).
  • Framework15%(4 notices)
    4 of 27 notices are Framework (15%).
  • Dynamic purchasing system4%(1 notice)
    1 of 27 notices is Dynamic purchasing system (4%).
Procedure route
i
  • Direct award30%(8 notices)
    8 of 27 notices are Direct award (30%).
  • Selective30%(8 notices)
    8 of 27 notices are Selective (30%).
  • Route not published30%(8 notices)
    8 of 27 notices are Route not published (30%).
  • Limited / restricted7%(2 notices)
    2 of 27 notices are Limited / restricted (7%).
  • Open4%(1 notice)
    1 of 27 notices is Open (4%).
Bids per lot, few lots
i

Based on 2 lots from this buyer’s competitions, last 24 months. Fewer than 5 lots: a median, not a typical figure.

4.5indicative · n=20% of lots drew a single bid
Notice amendments
i

Based on 27 notices across all categories, last 24 months.

04 of 27 notices amended
Award vs estimate
i

Based on 2 lots with both an estimate and an award, last 24 months. Small sample.

4.2% above estimateindicative · n=2

Who wins here
i

All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records

SupplierProceduresShareLast 24mAward recordsLast activity
Bentley Systems UK Ltd.215.4%2319 Jun 2026
WSP UK Limitedframework/DPS on 1215.4%2211 May 2026
NPLAN LIMITED17.7%1222 Jun 2026
Thomson Ecology Ltdframework/DPS on 117.7%12—
Concept Engineering Consultantsframework/DPS on 117.7%12—
Kotter Inc.17.7%126 May 2025
AECOM LIMITEDframework/DPS on 117.7%11—
Black & Veatch Binnies UK Limitedframework/DPS on 117.7%11—

The three most frequent suppliers are named on 38% of 13 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 26 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.

Published award value (24m)
i
£90mSum of published VAT-exclusive values on 13 of 13 published single-supplier values; the five largest make 95%.
Typical single-supplier award (24m)
i
£1.1m middle valuerobust · n=13Middle half £208k–£3.0m.
Largest published awards
i
SupplierAwardedTermPublished value
Land and Property Services - Lot 2 (Land Access)WSP UK Limited11 May 20264 yrs · up to 6.2 yrs£34,510,876
≈ £8.6m/yr
Land and Property Services - Lot 1 (Valuations and Compensation)Arcadis11 May 20264 yrs · up to 6.2 yrs£25,211,833
≈ £6.3m/yr
Relocation of 132kV UKPN Cut Throat Lane Switching StationUK Power Networks—7 yrs£22,076,599
≈ £3.2m/yr
Provision of Artificial Intelligence Schedule Risk Analysis ToolNPLAN LIMITED—1 yrs · up to 11 yrs£3,014,851 †
≈ £3.0m/yr
Digital Project Lifecycle Mangement ToolMETHOD APPS LIMITED9 Jun 20251 yrs · up to 10 yrs£1,388,100
≈ £1.4m/yr

Contracts ending
i

11 of 13 contracts carry an end date, 3 estimated from the duration · not a retender forecast

Recent procedures

Latest 28 of 28 procedures where this authority buys, is the authority the work is for, or runs the procurement

ProcedureStatusPublishedPublished value
Relocation of 132kV UKPN Cut Throat Lane Switching StationAwarded / complete11 Nov 2026—
Integration Technical Operations Assurance & Environment (ITOAE)Civil engineering consultancy servicesOpen30 Oct 2026£300,000,000
Client Support Framework (CSF)Framework3 lotsAuditing servicesOpen30 Oct 2026£350,000,000
CT4692 Programme Support Works FrameworkFramework6 lotsAncillary works for electricity power linesOpen29 Oct 2026£450,000,000
Low Carbon Consultancy & Advanced Market ConditionsAwarded / complete21 Oct 2026—
NEC4 Copyright Licence & Two Year SubscriptionAwarded / complete12 Oct 2026—
Provision of Managed Security Operations Centre (SOC)IT services: consultingAwarded / complete23 Sept 2026—
Land and Property Services2 lotsSurvey servicesAwarded / complete8 Sept 2026£57,333,793
Ground InvestigationsDPSConstruction workAwarded / complete16 Jul 2026—
Provision of Artificial Intelligence Schedule Risk Analysis ToolAwarded / complete12 Jul 2026—
Provision of Bentley ProjectWise and ALIM LicencesAwarded / complete12 Jul 2026—
Environmental survey services frameworkFramework8 lotsAir pollution monitoring or measurement servicesAwarded / complete9 Jul 2026—
Provision of Data Services (Digital Spine)Awarded / complete19 Jun 2026—
Media ManagementMarketing management consultancy servicesPlanned26 May 2026£3,333,333
Provision of Azure and MS365 LicencesSoftware package and information systemsPlanned26 May 2026£2,500,000
Stakeholder Engagement SupportStakeholders representation servicesPlanned26 May 2026£3,333,333
CT4692 Programme Support Works Framework Preliminary Market EngagementFrameworkArchaeological servicesPlanned26 May 2026£500,000,000
Leadership Effectiveness ServicesAwarded / complete11 May 2026—
MethodGridAwarded / complete9 Feb 2026—
Travel Booking SystemAwarded / complete12 Jun 2025—

Search all 28 procedures for this authority →

Contracts Finder adds 1 more procedure by this authority, mostly below the Find a Tender threshold or from before 2025. Each is counted once beside any Find a Tender copy; they are in the totals, not in this list or in search.

About this data
  • One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
  • Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
  • Contract end dates. 11 of 13 published contracts have an end date; 3 of those are estimated as the signature (or publication) date plus the published duration and are marked “estimated”. They feed “Contracts ending”, the same rule as the retender radar. Published values in that list come from either source; Contracts Finder figures are shown as published and stay out of this profile’s money totals.
  • Source. Official UK public procurement notices (Find a Tender and Contracts Finder), reused under the Open Government Licence v3.0, updated through the day and rebuilt nightly. Not every figure uses both feeds, and each one shows how many records it rests on: see the methodology. Spotted something wrong? Tell us.