Find a TenderAwarded
Published 16 Jul 2026, 10:14 BST

Official UK procurement notice

Ground Investigations · UK public procurement notice

Official notice

Authority: East West Rail Company Limited (Central government)

Dynamic marketWorksRestricted procedure
Dynamic market estimateValue not publishedmarket-wide estimate, not attributable revenue
Awarded 10 Oct 2024

What is being bought

Published requirement description

Ground investigation will inform many aspects of the infrastructure design including slope angles for earthworks, foundations for all structures, suitability of material for reuse as fill, contaminated land, retaining wall, drainage design and design of temporary works.

The ground investigations will inform the preliminary design for DCO and for the upcoming detailed design. The Phase 1 ground investigation will target areas that are identified by the designer as critical to the design such as major structures or areas of known geotechnical complexity.

CPV: Construction work

How this dynamic market works

From the published notice
Type
Dynamic market
Bids received
5 bids received · 1 suppliers appointed

The lotProcurement structure

single lot · no lot value published
Lot #1Ground investigation surveys to inform many aspects of the infrastructure design…Awarded

Ground investigation surveys to inform many aspects of the infrastructure design including slope angles for earthworks, foundations for all structures, suitability of material for reuse as fill, contaminated land, retaining wall, drainage design and design of temporary works.

considers that in circumstances where the Contractor was merely exercising a right to claim compensation under an NEC4 Option B "Priced Contract with a Bill of Quantities where there has been a change to the required quantities and the scope of the contract had not otherwise changed there has been no modification but that this is properly characterized as the operation of the contract as originally awarded. However as regards the additional ground investigation surveys, now required EWR acknowledges that this will involve a contractual modification to extend the scope.

Delivery: UK

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 21%Price: 30%Social value: 7%Environmental: 42%
Published sub-criteria (4)
  • Health wellbeing safe and security: 21%
  • Pricing schedule: 30%
  • Environmental sustainability and social value: 7%
  • Geotechnical and Geoenvironmental: 42%
Published award criteria (4)
  • Health wellbeing safe and security: 21
  • Geotechnical and Geoenvironmental: 42
  • Environmental sustainability and social value: 7
  • Pricing schedule: 30
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
  • “Ground Investigations” is a dynamic market: the contest is a place on its panel, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Restricted procedure
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Dynamic market
Who may use this agreement
Any qualifying supplier may apply while the market is open
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
16 Jul 2026, 10:14 BST
Last source update
16 Jul 2026, 10:40 BST
Authority reference
CT3227
FTS notice number
2026/S 000-067106
Classification (CPV)
Construction work
Delivery area
UK
Official registry OCID
ocds-h6vhtk-06cc82 Find a Tender

Publisher note: The value of this contract was initially estimated ( before commencing the procurement) as a below threshold contract. The contract was procured competitively through the RISQS qualification system using a competitive process akin to the restrictive procedure and a contract summary was published from contract finder. This summary indicated that the actual value of the contract, as awarded, was in fact above threshold.

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 1admitted to the panel · see the list ↓
Bids received 5
Contracts signed 2latest 10 Oct 2024

2 suppliers are admitted to this dynamic market without individual award values or dates, see the supplier list below.

Contracts

  • Contract 067081-2026-CT3227-1

    Signed
    10 Oct 2024
    Value
    £6,308,167
    Status
    active
  • Contract 067106-2026-CT3227-1

    Signed
    10 Oct 2024
    Value
    £25,000,000
    Status
    active
    • Change Increase in value to enable continued delivery of works pending replacement arrangements, Need for additional works, services or supplies by the original contractor/concessionaire: Primary justification - Regulation 88(1)(b) UCR 2016 (Additional services) The modification is required to procure additional works of the same type from the original contractor which have become necessary for the continued delivery of the programme and were not included in the original procurement. As design develops to take account of consultation feedback and identifications of new risks and opportunities it is not unusual for additional surveys to be required. The conditions for Regulation 88(1)(b) are satisfied as follows: 1. Necessity of additional services • Provision of additional ground investigation surveys is required to support ongoing rail infrastructure development by informing the design and ensuring on-time delivery of the East West Rail Development Consent Orderr • These additional surveys/ boreholes clearly do not change the overall nature of the contract 2. Inability to change contractor for economic / technical reasons without major inconvenience or cost duplication • The contracting entity has recently procured a replacement contractor, Kier Integrated Services Limited ("Kier") to lead Surveys Phase 2 through the SCAPE Utilities Works and Services Framework. Part of the responsibilities of the replacement contractor include surveys, including ground investigation surveys. Kier has been appointed from the SCAPE framework to provide the works and are expected to commence works in June 2026. Given this appointment it would not be feasible to hold a further competitive tender to make a short-term interim appointment to deliver the additional ground investigations required surveys prior to the commencement of the replacement Surveys Phase 2 contract with Kier. To do so would cause major inconvenience by delaying the EWR programme and impacting on the process of obtaining the Development Consent Order. Such an appointment would also involve cost duplication, for example by having two separate contractors incur mobilization costs) given that Kier will separately be mobilising. Therefore, only practicable step to deliver the approximate additional ground investigation surveys is to modify the existing appointment to facilitate this.

Bid statistics published by the authority

BidsSMEVCSEValid bid range
5bids———

Contracting authority & participating public bodies

EAST WEST RAILWAY COMPANY LIMITED

Contracting authorityCentral Governmenttransport GB-COH: 11072935 The Quadrant, Milton Keynes, South East, MK91ENContact name, email, phone

Dispute resolution & review bodies

  • Technology and Construction CourtReview body London

Suppliers admitted to the dynamic market

1 commercial party on the notice

Official documents & specifications

Official links; attachments are not copied

No document links were published on the notice.