Stroud District Council: Contract Register & Procurement Profile
NHS ODS: LOCAL AUTHORITY·ONS register: Local-authority-district·Social housing register: Local authority·NHS ODS: LOCAL AUTHORITY - LEGACY·Local authority·South West England·Stroud
Official UK PPONPRHW-3326-HVMGWebsitestroud.gov.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
19 awarded tenders, 16 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
1 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| Major Voids Refurbishments - 9 Bunting Way, Forest Green, Nailsworth, GL6 0TQ | 2 Oct 2026 | 2d | £90,000 |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work17 procedures · 74% · 1 open71 Architectural, construction, engineering2 procedures · 9%19 Leather and textile fabrics1 procedures · 4%37 Musical instruments, sport, games1 procedures · 4%50 Repair and maintenance services1 procedures · 4%51 Installation services (except software)1 procedures · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 23 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 100% (23 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Open 87% (20 notices)
- Direct award 9% (2 notices)
- Limited / restricted 4% (1 notices)
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 23 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 7 lots with both an estimate and an award, last 24 months.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Severn Wye Energy Agency Ltd | 4 | 21.1% | 1 | 4 | 30 Apr 2025 |
| Smith's (Gloucester) Limited | 1 | 5.3% | 1 | 1 | 3 Mar 2026 |
| MD Building Services Ltd | 1 | 5.3% | 1 | 1 | 10 Mar 2026 |
| Joyner P.A. Limited | 1 | 5.3% | 1 | 1 | 13 Nov 2025 |
| DLP Planning Limited | 1 | 5.3% | 1 | 1 | 26 Mar 2026 |
| PUMP SUPPLIES LIMITED | 1 | 5.3% | 1 | 1 | 24 Sept 2026 |
| Safeway Demolition & Plant Hire Ltd | 1 | 5.3% | 1 | 1 | 4 Jul 2025 |
| Robert Nicholas Limited | 1 | 5.3% | 1 | 1 | 20 Aug 2026 |
The three most frequent suppliers are named on 32% of 19 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 16 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| H1803 Planned Externals 2 | MD Building Services Ltd | 10 Mar 2026 | 3 yrs · up to 4 yrs | £7,500,000 ≈ £2.5m/yr |
| M5 Crossing Project - Groundworks | TIMOTHY CHARLES AND COMPANY LIMITED | — | 1.5 yrs | £1,348,734 † ≈ £899k/yr |
| Gloucestershire & South Gloucestershire Warm & Well Scheme 2025 - 2028 | Severn Wye Energy Agency Ltd | — | — | £735,000 † |
| M5 Crossing Project - Sheet Piling | Suttle Project Limited | — | 1.4 yrs | £499,521 † ≈ £353k/yr |
| Minor External Works | Joyner P.A. Limited | — | 3 mo | £250,000 † |
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
Published end dates only · 10 of 19 contracts carry one · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Beige Bags | JPK Trade Suppliers Limited | 3 Nov 2026 | £33,856 |
| Temporary Dam works for M5 Crossing | Robert Nicholas Limited | 31 Oct 2027 | £47,477 |
| M5 Crossing Project - Groundworks | TIMOTHY CHARLES AND COMPANY LIMITED | 30 Nov 2027 | £1,348,734 |
| Dewatering Works for the M5 Crossing Project | PUMP SUPPLIES LIMITED | 31 Dec 2027 | £149,311 |
| Sheet Piling Works for M5 Crossing | Suttle Project Limited | 31 Dec 2027 | £499,521 |
Recent procedures
Latest 37 of 37 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| M5 Crossing Project - DewateringConstruction work for water projects | Awarded / complete | 24 Sept 2026 | £75,000 |
| M5 Crossing Project - Sheet PilingConstruction work for water projects | Awarded / complete | 24 Sept 2026 | £350,000 |
| Stroud District Council - Planned External Works 2026-2029Construction work | Awarded / complete | 18 Sept 2026 | £15,000,000 |
| Active Lifestyles Dursley – Gym RefurbishmentFitness equipments | Awarded / complete | 14 Sept 2026 | £178,000 |
| M5 Crossing Project - Temporary DamsConstruction work for water projects | Awarded / complete | 20 Aug 2026 | £40,000 |
| Major Void Refurbishment - 1 Kings Road, Stonehouse, Gloucestershire, GL10 2EZConstruction work | Open | 10 Aug 2026 | £66,000 |
| Major Voids ITT - 38 Oatfield Road, Frampton on Severn, Gloucestershire, GL2 7HPConstruction work | Open | 31 Jul 2026 | £76,000 |
| Major Void Refurbishment - 1 Witcomb Close, Upton St Leonards, Gloucestershire GL4 8AEConstruction work | Open | 30 Jul 2026 | £76,000 |
| Supply and Delivery of Beige Polythene Refuse SacksPolythene waste and refuse sacks and bags | Awarded / complete | 10 Jul 2026 | £40,000 |
| Major Void Refurbishment - 1A Betworthy, Coaley, Dursley, Gloucesterhire.Refurbishment work | Open | 26 Jun 2026 | £70,000 |
| Flat Roof Replacement - Matthews Way, Stroud, GloucestershireRoof works and other special trade construction works | Open | 24 Jun 2026 | £30,000 |
| M5 Crossing Project - GroundworksWorks for complete or part construction and civil engineering work | Awarded / complete | 22 Jun 2026 | £1,250,000 |
| Planning Consultancy Services | Awarded / complete | 26 Mar 2026 | — |
| Stratford Park Lake road runoff diversion projectConstruction work | Awarded / complete | 3 Mar 2026 | £30,000 |
| M5 Crossing - LogisticsConstruction work | Open | 5 Feb 2026 | £140,000 |
| M5 Crossing Project - Construction ManagerConstruction management services | Open | 12 Dec 2025 | £200,000 |
| Minor External Works | Awarded / complete | 13 Nov 2025 | — |
| Demolition of Bonds Mill Bridge, Stroud | Awarded / complete | 4 Jul 2025 | — |
| Stratford Park Leisure Centre – Lower Car Park – Resurfacing of Car ParkResurfacing works | Open | 16 Jun 2025 | £77,500 |
| Gloucestershire & South Gloucestershire Warm & Well Scheme 2025 - 2028Energy-efficiency consultancy services | Awarded / complete | 30 Apr 2025 | £1,225,000 |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£25m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 11 award records on 11 procedures (11 to a single canonical supplier, 0 multi-supplier). 10 values come from the contract record when the award carried none.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 10 of 19 published contracts carry a period end; 5 end within 18 months, 1 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (3 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PRHW-3326-HVMG