Accent Group Ltd: Contract Register & Procurement Profile
Companies House: Registered Society·Social housing register: Registered society·Yorkshire and the Humber·Bradford
Official UK PPONPTXD-7116-XTCR
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 21 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
49 awarded tenders, 117 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work3 procedures · 11%71 Architectural, construction, engineering3 procedures · 11%42 Industrial machinery2 procedures · 7%44 Construction structures and materials2 procedures · 7%50 Repair and maintenance services2 procedures · 7%66 Financial and insurance services2 procedures · 7%77 Agricultural, forestry, horticultural services2 procedures · 7%39 Furniture, furnishings, domestic appliances1 procedures · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 27 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 100% (27 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Limited / restricted 44% (12 notices)
- Open 37% (10 notices)
- Direct award 11% (3 notices)
- Selective 4% (1 notices)
- Route not published 4% (1 notices)
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 21 lots from this buyer’s competitions, last 24 months.
i
How long this buyer takes to decide after bids close.
Middle value in days from deadline to first award notice, on this buyer’s own tenders.
Based on 5 decided tenders across all categories, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 27 notices across all categories, last 24 months.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| CLC Contractors Ltd | 5 | 10.2% | 0 | 8 | 23 Sept 2024 |
| IAN WILLIAMS | 4 | 8.2% | 1 | 8 | 7 Jul 2025 |
| The Purple Roofing Company Ltd | 2 | 4.1% | 2 | 2 | 2 Jun 2026 |
| Martin Collins Joinery and Glazing Limited | 2 | 4.1% | 2 | 2 | 5 Feb 2026 |
| Mcintyre Compliance Services Limited | 2 | 4.1% | 1 | 3 | 21 Oct 2024 |
| AEJ Management Limited | 2 | 4.1% | 1 | 2 | 9 Jan 2025 |
| Malc Firth Landscapes Limited | 1 | 2% | 1 | 2 | 3 Dec 2024 |
| Ajar Tech Limited | 1 | 2% | 1 | 2 | 16 Sept 2025 |
The three most frequent suppliers are named on 18% of 49 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 117 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Church End, Hilton, Cambridgeshire - Design & Construction of 16 Homes | VALIDUM LIMITED | 11 Sept 2026 | 1.6 yrs | £3,814,785 ≈ £2.4m/yr |
| GM North West | AEJ Management Limited | — | — | £2,936,432 † |
| NE & Yorks | Malc Firth Landscapes Limited | — | — | £1,761,162 † |
| Insurance and related services for Property, legal liability and other general (non-life) insurable risks, as required by Accent Group Ltd. | Arthur J. Gallagher Insurance Brokers Ltd | 13 Mar 2026 | 3 yrs · up to 5 yrs | £1,125,000 ≈ £375k/yr |
| South | Mcintyre Compliance Services Limited | — | — | £1,000,000 † |
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
Published end dates only · 16 of 164 contracts carry one · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Unit 4 Cloud Migration - Implementation Support | Arribatec UK Ltd | 30 Sept 2026 | £100,000 |
| Harton Lea | The Purple Roofing Company Ltd | 30 Sept 2026 | £112,846 |
| Red House Court | The Purple Roofing Company Ltd | 31 Dec 2026 | £36,832 |
| Replacement of Windows, Doors & Associated Works - Moss Side C, Leyland, Preston | Martin Collins Joinery and Glazing Limited | 31 Mar 2027 | £592,473 |
| Customer Data | RESEARCHERS AT CROWN LIMITED | 31 Mar 2027 | £58,428 |
| Occupational Health | Latus Group (IDC Audiology) | 31 May 2027 | £30,000 |
| Waste Removal Services | Any Junk Limited | 31 Dec 2027 | £275,000 |
Recent procedures
Latest 50 of 57 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Unit 4 Cloud Migration - Implementation Support | Awarded / complete | 28 Apr 2026 | — |
| Waste Removal Services | Awarded / complete | 30 Mar 2026 | — |
| Provision of Closed-Circuit TelevisionClosed circuit television services | Awarded / complete | 16 Sept 2025 | — |
| Kitchens and Bathrooms Replacement Planned Works – North West RegionBathrooms construction work | Awarded / complete | 7 Jul 2025 | — |
| Grounds Maintenance Services - North WestGrounds maintenance services | Awarded / complete | 9 Jan 2025 | — |
| Grounds Maintenance Services - YorkshireGrounds maintenance services | Awarded / complete | 3 Dec 2024 | — |
| ITT for the Provision of Fire Safety Reactive WorksFire-prevention services | Awarded / complete | 21 Oct 2024 | — |
| Bathroom Replacement Planned Works in East, South and Yorkshire RegionsBathroom furniture | Awarded / complete | 23 Sept 2024 | — |
| Kitchens and Bathrooms Replacement Planned Works - North EastBathrooms construction work | Awarded / complete | 18 Sept 2024 | — |
| Kitchens East, South and YorkshireFitted kitchens | Awarded / complete | 20 Aug 2024 | — |
| Replacement Stairlifts - EastStairlifts | Awarded / complete | 15 May 2024 | — |
| Grounds Maintenance BarrowHorticultural services | Awarded / complete | 30 Apr 2024 | — |
| DPS For Repairs and Maintenance, Voids, Managing Contractor & Pension ServicesConstruction management services | Awarded / complete | 23 Apr 2024 | — |
| Omega DPSAccess gates | Awarded / complete | 22 Apr 2024 | — |
| Encompass DPSArticles for the bathroom and kitchen | Awarded / complete | 22 Apr 2024 | — |
| Finite DPSArchitectural | Awarded / complete | 22 Apr 2024 | — |
| Decoration SolutionCharge cards | Awarded / complete | 23 Feb 2024 | £40,000,000 |
| Hyper Converged Infrastructure (HCI) data storage solutionData-processing machines (hardware) | Awarded / complete | 16 Jan 2024 | — |
| Scorex Office RefurbishmentConstruction work | Awarded / complete | 27 Nov 2023 | — |
| Replacement Backup, Disaster Recovery and M365 Backup SolutionData-processing machines (hardware) | Open | 8 Sept 2023 | — |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£13m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 34 award records on 27 procedures (31 to a single canonical supplier, 3 multi-supplier). 21 values come from the contract record when the award carried none; 6 awards published only a VAT-inclusive amount and are counted but not valued.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 16 of 164 published contracts carry a period end; 7 end within 18 months, 3 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (17 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PTXD-7116-XTCR