Find a TenderAwardedContract details notice
Published 15 Jan 2026, 21:33 GMT

Official UK procurement notice

PP-10183b Hornchurch Academy Trust Construction, Infrastructure, Building Works, Installations and Renewables Open Framework

Official notice

Authority: HORNCHURCH ACADEMY TRUST (Public body)·On behalf of: Place Group Limited

Open framework scheme6 lotsWorksOpen procedureAbove thresholdSME suitable
Framework ceiling (notional)£830,000,000total for 6 lots · framework ceiling, not attributable revenue
Submissions closed 13 Feb 2026awarded 21 May 2026
Awarded to AMELIO ENTERPRISES LIMITED +35 more6 awards
Framework period 2 yrsends 31 May 2028 · up to 1 Jun 2029 with extensions · starts 1 Jun 2026

What is being bought6 lots · detail below

Published requirement description

This Invitation to Tender (“ITT”) was issued by Place Group Limited as Procurement Agent of Hornchurch Academy Trust (“the Client”). Suppliers were invited by the Client to tender for a position on an Open Framework for the provision of various Construction, Infrastructure, Building Works, Installations and Renewables requirements in accordance with the ITT, including the following categories:

a. Category 1; Renewables

b. Category 2: Construction and Infrastructure

c. Category 3: Building Works, Installations, Repairs and Improvements

d. Category 4: Modular Buildings

e. Category 5: MUGAs and Sports Facilities

f. Category 6: Project Management and Building and Construction Consultancy

The Open Framework will act as a scheme of frameworks that provides for the award of successive frameworks on substantially the same terms. The first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.

The estimated contract value for this framework over the full potential 8-year period of the open framework is £830,000,000 excluding VAT / £996,000,000 including VAT. For the purposes of this notice, the framework value is split out equally per Category, however the framework value will be flexible across all Categories.

The framework shall include both mini-competition and direct award without further competition options for undertaking call-offs, as further detailed in Attachment 3 – Specification.

CPV: Advisory and consultative engineering services · Ancillary building services · Architectural, construction, engineering and inspection services · Batteries · Builders' carpentry · Builders' joinery · Building completion work · Building construction work · Building consultancy services · Building demolition and wrecking work and earthmoving work · Building installation work · Building services · +63 more

How this framework works

From the published notice
Type
Open framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Bids received
54 bids on the busiest of 6 lots · 97 suppliers appointed
Framework period
2 yrs · up to 3 yrs from 1 Jun 2026
Scheme runs until
7 Jun 2034
Supplier levy on call-offs (max %)

5% of call-off value · A Framework Levy is to be paid by the Supplier, calculated as a fixed percentage of the contract value for the initial term of each Call-Off Contract (prior to any deductions and exclusive of VAT), with the applicable fixed percentage being determined by the contract value (ranging from 5% to 0.35% dependent on contract value in line with the tender documentation).

Who may buy through it

The Framework shall be open for use by the following classifications of Contracting Authority throughout all administrative regions of the UK: UK public sector bodies (and

any future successors to these organisations), which include schools, academies, multi academy trusts, RBCs, DfE school buying hubs, colleges, universities, Central government departments and their arm's length bodies and agencies, non-departmental public bodies, NHS bodies and local authorities (county, unitary, district, borough, parish, town), devolved administrations, fire service, police service, transport services, buying consortiums and charities, Schools, Academies, Academy Trusts, RBCs, school buying hubs, colleges, universities, central government departments and agencies, nondepartmental public bodies, NHS bodies and local authorities, devolved administrations, fire service, police service, buying consortiums and charities.

Full details are included in the tendering documentation.

Published description of the framework

This framework contract will be accessed by two means of award - Mini-Competition and Direct Award without Further Competition. Both Mini Competition and Direct Award without Further Competition may be utilised against any available Category.

Customers may use conditions of participation for selection for Call-Off Contracts under the framework where permitted within the Procurement Act 2023.

The full conditions for mini-competition and direct award, and pricing models to be utilised can be found in the specification as part of the tender documentation.

Call-offs published through it3

Notices that name this framework as their framework in the official record. Many call-offs are never published, so this is a floor, not utilisation.

Lots and requirements (6)Procurement structure

6 lots · all with a published value · same conditions of participation on every lot
Lot #1Category 1: RenewablesAwardedRenewal 2 yrsSMEPublished value£0

The source published no individual description for this lot.

Contract period: 1 Jun 2026 – 31 May 2028 (2 yrs) · up to 1 Jun 2029 with extensions
Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As detailed in Part A of the ITT documentation, and in the supplier response form.

  • Technical & professional ability

    As detailed in Part A of the ITT documentation, and in the supplier response form.

Lot #2Category 2: Construction and InfrastructureAwardedRenewal 2 yrsSMEPublished value£0

The source published no individual description for this lot.

Contract period: 1 Jun 2026 – 31 May 2028 (2 yrs) · up to 1 Jun 2029 with extensions
Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As detailed in Part A of the ITT documentation, and in the supplier response form.

  • Technical & professional ability

    As detailed in Part A of the ITT documentation, and in the supplier response form.

Lot #3Category 3: Building Works, Installations, Repairs and ImprovementsAwardedRenewal 2 yrsSMEPublished value£0

The source published no individual description for this lot.

Contract period: 1 Jun 2026 – 31 May 2028 (2 yrs) · up to 1 Jun 2029 with extensions
Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As detailed in Part A of the ITT documentation, and in the supplier response form.

  • Technical & professional ability

    As detailed in Part A of the ITT documentation, and in the supplier response form.

Lot #4Category 4: Modular BuildingsAwardedRenewal 2 yrsSMEPublished value£0

The source published no individual description for this lot.

Contract period: 1 Jun 2026 – 31 May 2028 (2 yrs) · up to 1 Jun 2029 with extensions
Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As detailed in Part A of the ITT documentation, and in the supplier response form.

  • Technical & professional ability

    As detailed in Part A of the ITT documentation, and in the supplier response form.

Lot #5Category 5: MUGAs and Sports FacilitiesAwardedRenewal 2 yrsSMEPublished value£0

The source published no individual description for this lot.

Contract period: 1 Jun 2026 – 31 May 2028 (2 yrs) · up to 1 Jun 2029 with extensions
Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As detailed in Part A of the ITT documentation, and in the supplier response form.

  • Technical & professional ability

    As detailed in Part A of the ITT documentation, and in the supplier response form.

Lot #6Category 6: Project Management and Building and Construction ConsultancyAwardedRenewal 2 yrsSMEPublished value£0

The source published no individual description for this lot.

Contract period: 1 Jun 2026 – 31 May 2028 (2 yrs) · up to 1 Jun 2029 with extensions
Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As detailed in Part A of the ITT documentation, and in the supplier response form.

  • Technical & professional ability

    As detailed in Part A of the ITT documentation, and in the supplier response form.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
Conditions of participation · identical on every lot2
  • Economic & financial standing

    As detailed in Part A of the ITT documentation, and in the supplier response form.

  • Technical & professional ability

    As detailed in Part A of the ITT documentation, and in the supplier response form.

What this means for your bid
  • “PP-10183b Hornchurch Academy Trust Construction, Infrastructure,…” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Open framework scheme
Who may use this agreement
The Framework shall be open for use by the following classifications of Contracting Authority throughout all administrative regions of the UK: UK public sector bodies (and any future successors to these organisations), which include schools, academies, multi academy trusts, RBCs, DfE school buying hubs, colleges, universities, Central government departments and their arm's length bodies and agencies, non-departmental public bodies, NHS bodies and local authorities (county, unitary, district, borough, parish, town), devolved administrations, fire service, police service, transport services, buying consortiums and charities, Schools, Academies, Academy Trusts, RBCs, school buying hubs, colleges, universities, central government departments and agencies, nondepartmental public bodies, NHS bodies and local authorities, devolved administrations, fire service, police service, buying consortiums and charities. Full details are included in the tendering documentation. · open scheme: new suppliers can join during the term
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
15 Jan 2026, 21:33 GMT
Last source update
8 Jul 2026, 10:16 BST
Award evaluation window
Submission end – 27 Apr 2026
Authority reference
PP-10183b
FTS notice number
2026/S 000-003671
Latest notice
Contract details notice (UK7)
Classification (CPV)
Advisory and consultative engineering servicesAncillary building servicesArchitectural, construction, engineering and inspection servicesBatteriesBuilders' carpentryBuilders' joineryBuilding completion workBuilding construction workBuilding consultancy servicesBuilding demolition and wrecking work and earthmoving work
+65 moreBuilding installation workBuilding services
Delivery area
UKNorth East (UKC)North West (UKD)Yorkshire & Humber (UKE)
Official registry OCID
ocds-h6vhtk-060719 Find a Tender
Contract terms summary

As per the framework and call-off contract terms within the tendering documentation.

Review and risk notes
Risks

Please see section 7 of Part A of the tender documentation for details of contract risks and dependencies.

How it was run

Official notice
Run through: In-tend · Who buys & how to bid on In-tend
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · one account per buying organisation's portal · reCAPTCHA on signup
Appointment period ends
13 Feb 2026, 12:00 GMT
Clarification deadline
2 Feb 2026, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)

call-off levy · 5% of call-off value · A Framework Levy is to be paid by the Supplier, calculated as a fixed percentage of the contract value for the initial term of each Call-Off Contract (prior to any deductions and exclusive of VAT), with the applicable fixed percentage being determined by the contract value (ranging from 5% to 0.35% dependent on contract value in line with the tender documentation).

Detailed submission instructions & authority contactsFrom official release

Tender responses, and all clarifications and correspondence, must be submitted using In-tend portal through which the procurement will be managed, under project reference PP-10183a: in-tendhost.co.uk/placegroup ↗

Timeline

15 Jan 2026 → 8 Jul 2026 · 8 dates
  1. Tender notice published281 days ago
    15 Jan 2026, 21:33 GMT
  2. Clarification questions by263 days ago
    2 Feb 2026, 17:00 GMT
  3. Admission / appointment period ends253 days ago · period end, not a bid countdown
    13 Feb 2026, 12:00 GMT
  4. Award decision expected by179 days ago
    27 Apr 2026, 23:59 BST
  5. Assessment summaries sent151 days ago
    26 May 2026, 00:00 BST
  6. Contract starts145 days ago
    1 Jun 2026, 00:00 BST
  7. Standstill ends141 days ago
    4 Jun 2026, 23:59 BST
  8. Latest notice published108 days ago
    8 Jul 2026, 10:16 BST

Notice history

5 events · 3 releases on Find a Tender · since 15 Jan 2026
  1. Tender notice published
    15 Jan 2026, 21:33 GMT
    UK4
  2. Contract award notice published
    26 May 2026, 17:01 BST
    UK6
  3. Status changed to complete
    26 May 2026, 17:01 BST
  4. Contract signature expected
    8 Jun 2026, 23:59 BST
    scheduled
  5. Contract details notice published
    8 Jul 2026, 10:16 BST
    UK7

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 976 awards · see the list ↓
Bids received 5446 from SMEs · busiest of 6 lots
Named bidders 108published on the award notice
Contracts signed 6latest 8 Jun 2026

£138,333,333 is the framework's published maximum, restated by the publisher on 6 award rows. It is one ceiling, not 6 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · Category 1: Renewables6 awards
AMELIO ENTERPRISES LIMITED, BELL GROUP LTD, CUBE EV CHARGERS LTD, ETEC CONTRACT SERVICES LTDSME, Equans Regeneration Ltd, PHOENIX RENEWABLES LTD +19 more8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.ceiling above21 May 2026Awarded
CityAxis LimitedSME, ETEC CONTRACT SERVICES LTDSME, Indecon Building LimitedSME, JP Developers LtdSME, LUCION SURVEY LTD, SAVOY DEVELOPMENTS LIMITED +24 moreCategory 2: Construction and Infrastructure8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.ceiling above21 May 2026Awarded
ADVANCED FIRE & SECURITY SERVICES LIMITED, BELL GROUP LTD, CityAxis LimitedSME, ETEC CONTRACT SERVICES LTDSME, Equans Regeneration Ltd, Indecon Building LimitedSME +44 moreCategory 3: Building Works, Installations, Repairs and Improvements8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.ceiling above21 May 2026Awarded
A1 LOO HIRE LIMITED, LUCION SURVEY LTD, MAC ZERO MODULAR BUILDINGS LTD, SAVOY DEVELOPMENTS LIMITED, South East Modular Ltd (t/a SEMCO) - previously BM Modular Limited, Streetspace LtdSME +14 moreCategory 4: Modular Buildings8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.ceiling above21 May 2026Awarded
A&S Landscape Limited, Aspire Construction Projects Ltd, CSF Building Contractors LtdSME, Dura-Sport LtdSME, ETEC CONTRACT SERVICES LTDSME, Streetspace LtdSME +2 moreCategory 5: MUGAs and Sports Facilities8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.ceiling above21 May 2026Awarded
HADRON CONSULTING LTD, IESIS LIMITED, MUNDAY & CRAMER ARCHITECTURAL & BUILDING SURVEYORS LIMITED, POWERTECH GENERATORS LIMITED, SJM 360 GROUP (UK) LIMITED, SPACEZERO (NORTH) LIMITED +18 moreCategory 6: Project Management and Building and Construction Consultancy8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029Extensions: The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.ceiling above21 May 2026Awarded

Contracts

All 6 of these contracts carry the same published figure, £138,333,333, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Category 1: Renewables · AMELIO ENTERPRISES LIMITED, BELL GROUP LTD, CUBE EV CHARGERS LTD, ETEC CONTRACT SERVICES LTDSME, Equans Regeneration Ltd, PHOENIX RENEWABLES LTD +19 more

    Signed
    8 Jun 2026
    Value
    ceiling above
    Period
    8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029 with extensions
    Status
    active
    Extensions
    The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
  • Category 2: Construction and Infrastructure · CityAxis LimitedSME, ETEC CONTRACT SERVICES LTDSME, Indecon Building LimitedSME, JP Developers LtdSME, LUCION SURVEY LTD, SAVOY DEVELOPMENTS LIMITED +24 more

    Signed
    8 Jun 2026
    Value
    ceiling above
    Period
    8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029 with extensions
    Status
    active
    Extensions
    The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
  • Category 3: Building Works, Installations, Repairs and Improvements · ADVANCED FIRE & SECURITY SERVICES LIMITED, BELL GROUP LTD, CityAxis LimitedSME, ETEC CONTRACT SERVICES LTDSME, Equans Regeneration Ltd, Indecon Building LimitedSME +44 more

    Signed
    8 Jun 2026
    Value
    ceiling above
    Period
    8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029 with extensions
    Status
    active
    Extensions
    The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
  • Category 4: Modular Buildings · A1 LOO HIRE LIMITED, LUCION SURVEY LTD, MAC ZERO MODULAR BUILDINGS LTD, SAVOY DEVELOPMENTS LIMITED, South East Modular Ltd (t/a SEMCO) - previously BM Modular Limited, Streetspace LtdSME +14 more

    Signed
    8 Jun 2026
    Value
    ceiling above
    Period
    8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029 with extensions
    Status
    active
    Extensions
    The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
  • Category 5: MUGAs and Sports Facilities · A&S Landscape Limited, Aspire Construction Projects Ltd, CSF Building Contractors LtdSME, Dura-Sport LtdSME, ETEC CONTRACT SERVICES LTDSME, Streetspace LtdSME +2 more

    Signed
    8 Jun 2026
    Value
    ceiling above
    Period
    8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029 with extensions
    Status
    active
    Extensions
    The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.
  • Category 6: Project Management and Building and Construction Consultancy · HADRON CONSULTING LTD, IESIS LIMITED, MUNDAY & CRAMER ARCHITECTURAL & BUILDING SURVEYORS LIMITED, POWERTECH GENERATORS LIMITED, SJM 360 GROUP (UK) LIMITED, SPACEZERO (NORTH) LIMITED +18 more

    Signed
    8 Jun 2026
    Value
    ceiling above
    Period
    8 Jun 2026 – 7 Jun 2028 · up to 7 Jun 2029 with extensions
    Status
    active
    Extensions
    The extension date is to the maximum length of the first framework in the Open Framework scheme in accordance with the Procurement Act if the open framework was not re-opened after 2 years or if the reopening becomes delayed. However, the intention is that the first framework shall be for a period of 2 years, with each successive framework being for a period of 3 years, with the final framework expiring at the end of the period of eight years beginning with the day on which the first framework under the scheme is awarded.

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Category 1: Renewables40final-stage tenders · 41 at stage one320—
2 · Category 2: Construction and Infrastructure38final-stage tenders330—
3 · Category 3: Building Works, Installations, Repairs and Improvements54final-stage tenders460—
4 · Category 4: Modular Buildings22final-stage tenders200—
5 · Category 5: MUGAs and Sports Facilities8final-stage tenders70—
6 · Category 6: Project Management and Building and Construction Consultancy26final-stage tenders260—

Who bid (first 60 of 108)

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

2 public bodies on the notice

HORNCHURCH ACADEMY TRUST

Contracting authorityPublic authority - sub-central government GB-COH: 10760863 Whybridge Junior School Blacksmiths Lane, Essex, London, RM13 7AHContact email

Other public bodies

  • Place Group LimitedProcess contact pointProcuring entityProcurement Agent on behalf of the ClientGB-COH: 04395705 Penzance, South WestContact name, email

Framework contractors & participating bidders

108 commercial parties on the notice · 44 awarded

The first 50 of 108 commercial parties (by name); the JSON mirror lists them all.

  • A&S LandscapeFramework contractorGB-COH: 09494241 March Way, Shrewsbury, West Midlands, SY1 3JEContact email
  • A1 LOO HIRE LIMITEDFramework contractorGB-COH: 05333973 Silver Birches, Wokingham, South East, RG41 4SPContact email
  • ADVANCED FIRE & SECURITY SERVICES LIMITEDFramework contractorGB-COH: 03196564 18 Acorn Industrial Park, Crayford, London, DA1 4ALContact email
  • AHR BUILDING CONSULTANCY LIMITEDFramework contractorGB-COH: 02156528 5th Floor 55 Princess Street, Manchester, North West, M2 4EWContact email
  • ALTEC SERVICES LTDBidder / tendererGB-COH: 11916062 116 Duke Street, Liverpool, North West, L1 5JW
  • AMELIO ENTERPRISES LIMITEDFramework contractorGB-COH: 07341860 Good Energy Monkton Park Offices, Chippenham, South West, SN15 1GHContact email
  • AMPTRON ELECTRICAL SERVICES LIMITEDFramework contractorGB-COH: 06024190 156 Russell Drive, Nottingham, East Midlands, NG8 2BEContact email
  • AMR CONSULT LIMITEDFramework contractorGB-COH: 06597779 First Floor, London, London, SE1 1QRContact email
  • APEX CONTRACTORS LIMITEDFramework contractorGB-COH: 03350641 12 Hatherley Road, Sidcup, London, DA14 4DTContact email
  • ASPECT BUILDING SOLUTIONS LIMITEDFramework contractorGB-COH: 06382267 Wentworth House Turnberry Park Road, Leeds, Yorkshire & Humber, LS27 7LEContact email
Show 40 more suppliers
  • ASPIRE CONSTRUCTION PROJECTS LTDFramework contractorGB-COH: 07129318 5/6 Salmon Fields Business Village, Oldham, North West, OL2 6HTContact email
  • Alternative Heat LimitedFramework contractorGB-COH: NI054205 Unit 18 - 19 Scarva Road Industrial Estate, Banbridge, Northern Ireland, BT32 3QDContact email
  • BARKER ASSOCIATES (ESSEX) LIMITEDFramework contractorGB-COH: 11605920 Majesty House, Avenue West, Skyline 120, Braintree, Essex, East of England, CM77 7AAContact email
  • BELL GROUP LTDFramework contractorGB-COH: SC114142 Bell Business Park, Airdrie, Scotland, ML6 9BGContact email
  • BELLROCK PROPERTY & FACILITIES MANAGEMENT LIMITEDFramework contractorGB-COH: 03075427 Peat House, Leicester, East Midlands, LE1 6LPContact email
  • BLUELIGHT MANAGEMENT LTDFramework contractorGB-COH: 13212874 Golden Cross House, London, London, WC2N 4JFContact email
  • BRIMSTONE ENERGY LIMITEDBidder / tendererGB-COH: 14714966 15 Langley Way, Hemingford Grey, East of England, PE28 9DB
  • BSN GROUP CONSTRUCTION LIMITEDFramework contractorGB-COH: 11173369 Azzurri House Walsall Business Park, Walsall, West Midlands, WS9 0RBContact email
  • CARMELCREST LIMITEDFramework contractorGB-COH: 01731918 Suite 20 Block H, Peek Business Centre, Bishop's Stortford, East of England, CM23 5RGContact email
  • CBES LIMITEDFramework contractorGB-COH: SC288763 Caledonia House, Glasgow, Scotland, G5 0USContact email
  • CITYAXIS LIMITEDFramework contractorGB-COH: 02748683 1st Floor, 346 Kensington High Street Kensington High Street, London, London, W14 8NSContact email
  • CONCEPT INTERIORS MANAGEMENT LIMITEDBidder / tendererGB-COH: 04428320 Victoria House, Southend On Sea, East of England, SS1 1BN
  • CONCERTUS DESIGN AND PROPERTY CONSULTANTS LIMITEDBidder / tendererGB-COH: 08366439 2 Friars Bridge Road, Ipswich, East of England, IP1 1RR
  • CSF BUILDING CONTRACTORS LTDFramework contractorGB-COH: 07474830 1210 London Road, Leigh-On-Sea, East of England, SS9 2UAContact email
  • CUBE EV CHARGERS LTDFramework contractorGB-COH: 14338642 C/O Aligned Accountancy Group Ltd Bromley Old Town Hall, Bromley, London, BR1 3FEContact email
  • D M DEVELOPMENTS (INSKIP) LTD t/a Eco HomeFramework contractorGB-COH: 11376384 Pad End Barn, Preston, North West, PR4 0UAContact email
  • DAVID STAGG & ASSOCIATES LTD.Framework contractorGB-COH: 03593167 Electron House, Great Baddow, East of England, CM2 8JTContact email
  • DURA-SPORT LIMITEDFramework contractorGB-COH: 03018525 West Avenue, Leicestershire, East Midlands, LE18 2FFContact email
  • E.V. BULLEN & SON LIMITEDBidder / tendererGB-COH: 00653265 Green Lane Business Park 238 Green Lane, London, London, SE9 3TL
  • EENERGY SERVICES UK LIMITEDFramework contractorGB-COH: 11217759 20 St. Thomas Street, London, London, SE1 9RSContact email
  • ENERGY CONSERVATION SOLUTIONS LIMITEDFramework contractorGB-COH: 03619534 New Kings Court Tollgate, Eastleigh, South East, SO53 3LGContact email
  • EQUANS Regeneration LimitedFramework contractorGB-COH: 1738371 Neon Q10 Quorum Business Park, Benton Lane, Newcastle Upon Tyne, North East, NE12 8BUContact email
  • ETEC CONTRACT SERVICES LIMITEDFramework contractorGB-COH: 05392794 Suite 7, Elmhurst, South Woodford, London, E18 2QHContact email
  • EVERY PROJECT COUNTS LTDFramework contractorGB-COH: 08743656 The Old Granary, Laindon, East of England, SS15 4DBContact email
  • FIRESERV UK (MIDLANDS) LIMITEDFramework contractorGB-COH: 08427170 26 High View Close, Leicester, East Midlands, LE4 9LJContact email
  • FUSION PROJECT MANAGEMENT LIMITEDFramework contractorGB-COH: 05705987 Spring Lodge 172 Chester Road, Helsby, North West, WA6 0ARContact email
  • GRATTE BROTHERS BUILDING SERVICES MAINTENANCE LIMITEDBidder / tendererGB-COH: 02729551 2 Regents Wharf, London, London, N1 9RL
  • GREENLIGHT ENGINEERING LIMITEDFramework contractorGB-COH: 07076022 Unit 14 14 Watermill Way, London, London, SW19 2RDContact email
  • HADRON CONSULTING LTDFramework contractorGB-COH: 09262653 Broom House 39/43 London Road, Benfleet, East of England, SS7 2QLContact email
  • HEALTHMATIC LIMITEDFramework contractorGB-COH: 02065014 4th Floor Fitzrovia House, London, London, W1T 6QWContact email
  • HUTTON CONSTRUCTION LIMITEDFramework contractorGB-COH: 02016581 Birch Business Centre, Colchester, East of England, CO2 0LTContact email
  • IESIS LIMITEDFramework contractorGB-COH: 06466868 89-95 Redcliff Street, Bristol, South West, BS1 6LUContact email
  • Indecon Building LimitedFramework contractorGB-COH: 1414461 South Hanningfield Road, Wickford, East of England, SS11 7PFContact email
  • J.P. DEVELOPERS LIMITEDFramework contractorGB-COH: 03873231 County House, Dalton Street, Hull, Yorkshire & Humber, HU8 8BBContact email
  • JOHN MERISON (BUILDING MAINTENANCE CONTRACTORS) LIMITEDFramework contractorGB-COH: 03401473 2 Thornborough Road, Coalville, East Midlands, LE67 3THContact email
  • K& W BUILDERS LIMITEDFramework contractorGB-COH: 08819542 Cawley House, Nottingham, East Midlands, NG1 7HRContact email
  • KEITH RIDGEWAY SERVICES LIMITEDFramework contractorGB-COH: 12404641 The Courtyard, Wakefield, Yorkshire & Humber, WF2 7AJContact email
  • KSN PROJECT MANAGEMENT LIMITEDFramework contractorGB-COH: SC534449 185 St. Vincent Street, Glasgow, Scotland, G2 5QDContact email
  • LEISURE ENERGY LTDFramework contractorGB-COH: 08938136 Leisure Energy Technology Centre, Units 6, 7, 8 Site 8, Gemini Business Park, Kidderminster, West Midlands, DY11 7HJContact email
  • LIBERTY FIRE & VISION LIMITEDFramework contractorGB-COH: 05863517 Units 1-2, Rosehill Business, Southport, North West, PR9 0SHContact email

Official documents & specifications (20)

Official links; attachments are not copied

Tender pack and attachments

  • Signed contract contractSigned contractDOCXOverarching framework contract attached which applies to all Categories/Lots.
  • Bidding documents and specifications tenderBidding documents and specificationsTender documentation and all correspondence will be managed via the InTend portal under project reference PP-10183a. Please register on the portal and express interest in the project to access the tender documentation.
  • Signed contract contractSigned contractDOCXOverarching framework contract attached which applies to all Categories/Lots.
  • Signed contract contractSigned contractDOCXOverarching framework contract attached which applies to all Categories/Lots.
  • Signed contract contractSigned contractDOCXOverarching framework contract attached which applies to all Categories/Lots.
  • Signed contract contractSigned contractDOCXOverarching framework contract attached which applies to all Categories/Lots.
  • Signed contract contractSigned contractDOCXOverarching framework contract attached which applies to all Categories/Lots.

Notices published for this procedure

Show 5 more notices
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender