London South Bank University: Contract Register & Procurement Profile
Companies House: PRI/LTD BY GUAR/NSC (Private, limited by guarantee, no share capital)·DfE school register: Higher education institutions·Education·Greater London·London
Official UK PPONPJMT-5564-YWMTWebsitelsbu.ac.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
12 awarded tenders, 12 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
72 IT services: consulting, software, internet1 procedures · 6%79 Business services: law, marketing, consulting1 procedures · 6%80 Education and training services1 procedures · 6%85 Health and social work services1 procedures · 6%98 Other community, social and personal services1 procedures · 6%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 16 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 100% (16 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Limited / restricted 63% (10 notices)
- Direct award 19% (3 notices)
- Open 13% (2 notices)
- Selective 6% (1 notices)
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 16 notices across all categories, last 24 months.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Malvern Panalytical Ltd | 1 | 8.3% | 1 | 1 | 11 May 2026 |
| Site Solutions Specialist Contractors Ltd | 1 | 8.3% | 1 | 1 | 10 Jul 2025 |
| XYZ Machine Tools | 1 | 8.3% | 1 | 1 | 8 Sept 2026 |
| Alpine Works Limited | 1 | 8.3% | 1 | 1 | 20 Jan 2026 |
| Shimadzu UK Ltd | 1 | 8.3% | 1 | 1 | 23 Mar 2026 |
| The Fulker Consultancy Ltd | 1 | 8.3% | 1 | 1 | 22 May 2026 |
| Dimension Green Energy Limited | 1 | 8.3% | 1 | 1 | 2 Apr 2026 |
| Kendall Kingscott Limited | 1 | 8.3% | 1 | 1 | 6 Jul 2026 |
The three most frequent suppliers are named on 25% of 12 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 12 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| 24-037 K2 Building Cladding Repairs | Site Solutions Specialist Contractors Ltd | — | 3 mo | £258,303 † |
| 24-065 Passmore Centre Plant Relocation Works | Alpine Works Limited | — | 4 mo | £255,412 † |
| Bivalent Heating System (Heat Pump Installation Work) at Clarence Centre | Dimension Green Energy Limited | — | 2 mo | £203,003 † |
| 25-053 CNC Equipment | XYZ Machine Tools | — | 3 yrs | £164,948 † ≈ £55k/yr |
| ICP-MS system via RCIF funding | Shimadzu UK Ltd | — | 3 yrs | £149,425 † ≈ £50k/yr |
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
Published end dates only · 9 of 12 contracts carry one · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Professional Services for Contract Admin and Quantity Surveying | Kendall Kingscott Limited | 18 Dec 2026 | £53,772 |
| 25-015: Professional Services for Fire Doors Repair Works | The Fulker Consultancy Ltd | 25 Jun 2027 | £49,985 |
Recent procedures
Latest 19 of 19 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| 25-053 CNC Equipment | Awarded / complete | 8 Sept 2026 | — |
| Professional Services for Contract Admin and Quantity Surveying for Pipework Replacement Works | Awarded / complete | 6 Jul 2026 | — |
| 24 052 International Student Recruitment Marketing and ConversionMarketing services | Open | 15 Jun 2026 | £3,000,000 |
| 25-015: Professional Services for Fire Doors Repair Works | Awarded / complete | 22 May 2026 | — |
| 25-035 X-ray diffraction instrument RCI Funded | Awarded / complete | 11 May 2026 | — |
| Bivalent Heating System (Heat Pump Installation Work) at Clarence Centre | Awarded / complete | 2 Apr 2026 | — |
| ICP-MS system via RCIF funding | Awarded / complete | 23 Mar 2026 | — |
| 24-065 Passmore Centre Plant Relocation Works | Awarded / complete | 20 Jan 2026 | — |
| Salesforce CRM licences | Awarded / complete | 31 Oct 2025 | — |
| NT1542 -24 052 International Student Recruitment Marketing and Conversion | Awarded / complete | 10 Oct 2025 | — |
| Adult Skills Fund - Subcontractors and PartnersEducation and training services | Cancelled | 8 Sept 2025 | £3,900,000 |
| Chapel Remedial Works at Southbank Campus LSBU | Awarded / complete | 7 Aug 2025 | — |
| 24-037 K2 Building Cladding Repairs | Awarded / complete | 10 Jul 2025 | — |
| NT 1836 UCAS Capitalisation July 2025 | Awarded / complete | 8 Jul 2025 | — |
| 24-033 OH-Student Counselling project_2807Counselling services | Cancelled | 26 Jun 2025 | £240,000 |
| www.lsbu.ac.ukIT services: consulting | Awarded / complete | 10 Dec 2024 | — |
| 0Building and facilities management services | Open | 26 Jun 2023 | £66,100,000 |
| 200,000Health and social work services | Awarded / complete | 3 Apr 2023 | — |
| Marketing ServicesAdvertising and marketing services | Awarded / complete | 3 Apr 2023 | — |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£73m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 10 award records on 10 procedures (10 to a single canonical supplier, 0 multi-supplier). 6 values come from the contract record when the award carried none; 3 awards published only a VAT-inclusive amount and are counted but not valued.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 9 of 12 published contracts carry a period end; 2 end within 18 months, 1 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (3 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PJMT-5564-YWMT