Retender radar: UK public contracts ending soon

Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 676–700

  1. Ends · in 322 daysFramework re-letPanel · 7 suppliers

    Bespoke

    Surrey and Borders Partnership NHS Foundation Trust on behalf of NHS Commercial Solutions · Charity · Nationwide (UK)

    Panel: D M HABENS (THE BUILDER) LTD, Hollmark Ltd, Inspired Glazing +4 more

    • Armoured or reinforced doors
    • Bedroom, dining room and living-room furniture
    • Door blanks
    Contract value
    £100mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03bcb8
  2. Ends · in 322 daysFramework re-letPanel · 3 suppliers

    Consultancy and Professional Services

    Surrey and Borders Partnership NHS Foundation Trust on behalf of NHS Commercial Solutions · Charity · Nationwide (UK)

    Panel: Custom Group Limited, Nationwide Fire Door Services, Protects Plus Ltd

    • Armoured or reinforced doors
    • Bedroom, dining room and living-room furniture
    • Door blanks
    Contract value
    £50mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-03bcb8
  3. Ends · in 322 days

    B947 (2020) Excavation, Cable laying and Reinstatement

    Northern Ireland Electricity Networks Limited · Northern Ireland

    Incumbent: Morrow Contracts Ltd

    • Ancillary works for electricity power lines
    • Ancillary works for pipelines and cables
    • Construction work
    Contract value
    £37m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-06c21e
  4. Ends · in 322 daysExtension option · up to 31 May 2028

    Core Valley Lines (CVL) Transformation: Complex track works with associated level boarding works

    Transport for Wales · Other public body · Wales (Cymru)

    Incumbent: Amey Infrastructure Wales (AIW)

    • Railway construction works
    • Railway-track construction materials and supplies
    Contract value
    £9.8m
    Annual run-rate
    £7.1mvalue ÷ published term
    Term
    13 Apr 2026 → 31 Aug 2027 · 1.3 yrs · up to 31 May 2028 with extensions
    Reference
    ocds-h6vhtk-059e3f
  5. Ends · in 322 daysFramework re-letPanel · 6 suppliers

    Lot 1 - Supply and Installation of Curtains and Blinds

    ESPO · Nationwide (UK)

    Panel: Bridge Contract Solutions LTD, Custom Group Limited, SIR JACOB BEHRENS AND SONS LIMITED +3 more

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £3.8mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  6. Ends · in 322 days

    Netherhall School - Replacement External Doors and Windows

    Cumberland Council · Local authority · North West England

    Incumbent: Thomas Armstrong (Construction) Ltd

    • Construction work
    Contract value
    £859k
    Annual run-rate
    £406kvalue ÷ published term
    Term
    21 Jul 2025 → 31 Aug 2027 · 2.1 yrs
    Reference
    ocds-h6vhtk-050b2f
  7. Ends · in 322 daysFramework re-letPanel · 2 suppliers

    Lot 2 - Supply and Installation of Electrically Powered Blinds

    ESPO · Nationwide (UK)

    Panel: Custom Group Limited, Wattrus Group Limited

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £750kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  8. Ends · in 322 daysFramework re-let

    Lot 3 - Supply and Installation of Theatre and Drama Room Equipment

    ESPO · Nationwide (UK)

    Incumbent: Custom Group Limited

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £750kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  9. Ends · in 322 daysFramework re-let

    Lot 4 - Supply and Installation of Security Shutters and Grilles

    ESPO · Nationwide (UK)

    Incumbent: Custom Group Limited

    • Blinds
    • Curtain rails
    • Curtain rails and hangings
    Contract value
    £750kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045802
  10. Ends · in 322 days

    HAR6108 Wood Wharf School

    Tower Hamlets · Other public body · Greater London

    Incumbent: Alpine Works Limited

    • Construction work for school buildings
    Contract value
    £736k
    Annual run-rate
    £565kvalue ÷ published term
    Term
    13 May 2026 → 31 Aug 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-065a8b
  11. Ends · in 322 days

    The Willows School Full Heating and Distribution Upgrade

    Milton Keynes City Council · Local authority · South East England

    Incumbent: SDG Electrical & Mechanical Engineering Ltd

    • Central-heating boilers
    • Central-heating equipment
    • Central-heating installation work
    Contract value
    £363k
    Annual run-rate
    £276kvalue ÷ published term
    Term
    8 May 2026 → 31 Aug 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-06567d
  12. Ends · in 322 daysExtension option · up to 31 Aug 2029

    Play Areas Repairs & Maintenance Works

    Wychavon District Council · Local authority · West Midlands

    Incumbent: Continental Landscapes Limited

    • Flatwork for children's play area
    • Repair and maintenance services of playground equipment
    Contract value
    £295k
    Annual run-rate
    £148kvalue ÷ published term
    Term
    1 Sept 2025 → 31 Aug 2027 · 1.9 yrs · up to 31 Aug 2029 with extensions
    Reference
    ocds-h6vhtk-0526d3
  13. Ends · in 322 daysFramework re-letPanel · 6 suppliers

    Asbestos Removal Services

    Cambridgeshire County Council · Local authority · East of England

    Panel: AA Woods, ASPECT CONTRACTS LIMITED, Asbestech Ltd +3 more

    • Asbestos removal services
    • Demolition, site preparation and clearance work
    Contract value
    Not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045686
  14. Ends · in 322 daysFramework re-letPanel · 4 suppliers

    Demolition Services

    Cambridgeshire County Council · Local authority · East of England

    Panel: CAWARDEN CO. LIMITED, DSM Demolition, Jackson Environmental Ltd +1 more

    • Asbestos removal services
    • Demolition, site preparation and clearance work
    Contract value
    Not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-045686
  15. Ends · in 322 days

    AT1329 Wandon Park Housing Development (FTS)

    Luton Council · Local authority · Nationwide (UK), East of England

    Incumbent: Boom Construction Limited

    • Construction work
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04d719
  16. Ends · in 322 days

    Beckenham Car Park Housing Scheme Main Contractor

    London Borough of Bromley · Local authority · Greater London

    Incumbent: Jerram Falkus Construction Ltd

    • Construction work
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 31 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-051cc8
  17. Ends · in 328 days

    COV - Baginton Fields Expansion - Main contractor

    Coventry City Council · Local authority · West Midlands

    Incumbent: Jeakins Weir Limited

    • Building construction work
    Contract value
    £8.5m
    Annual run-rate
    £5.1mvalue ÷ published term
    Term
    5 Jan 2026 → 6 Sept 2027 · 1.7 yrs
    Reference
    ocds-h6vhtk-0513f7
  18. Ends · in 328 days

    Major Roads-Carriageway Resurfacing Works Contract 2026-2027

    Reading Borough Council · Local authority · South East England

    Incumbent: O'Hara Bros Surfacing Ltd

    • Carriageway resurfacing works
    • Dual carriageway construction work
    • Single carriageway construction work
    Contract value
    £1.8m
    Annual run-rate
    £1.8mvalue ÷ published term
    Term
    7 Sept 2026 → 6 Sept 2027 · 11 months
    Reference
    ocds-h6vhtk-06a733
  19. Ends · in 328 daysExtension option · up to 6 Sept 2031Buyer plans to re-tender 1 Apr 2030

    Lagoon Bird Netting & Wiring Tensioning

    FLYDONCASTER LIMITED · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Airport Utilities Ltd

    • Disinfecting and exterminating services
    • Fencing, railing and safety equipment installation work
    • Forest pest control services
    Contract value
    £250k
    Annual run-rate
    £250kvalue ÷ published term
    Term
    7 Sept 2026 → 6 Sept 2027 · 11 months · up to 6 Sept 2031 with extensions
    Reference
    ocds-h6vhtk-06c117
  20. Ends · in 329 daysExtension option · up to 7 Sept 2029

    The Design, Manufacture and Installation of Modular Ramps and Associated Services

    Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK), Yorkshire and the Humber

    Incumbent: Easibathe Ltd

    • Access ramps
    • Construction work
    Contract value
    £300k
    Annual run-rate
    £300kvalue ÷ published term
    Term
    8 Sept 2026 → 7 Sept 2027 · 11 months · up to 7 Sept 2029 with extensions
    Reference
    ocds-h6vhtk-06145f
  21. Ends · in 335 days

    Clent Way Roof Replacement 2026

    Greensquareaccord · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED

    • Roof works and other special trade construction works
    Contract value
    £306k
    Annual run-rate
    £306kvalue ÷ published term
    Term
    14 Sept 2026 → 13 Sept 2027 · 11 months
    Reference
    ocds-h6vhtk-069d8e
  22. Ends · in 335 daysFramework re-letExtension option · up to 31 Jul 2031Panel · 3 suppliers

    ET154 - Electrical Services & Maintenance

    Liverpool School Of Tropical Medicine · Education · North West England

    Panel: BBG Electrical Solution Ltd, Consortia Integrated Services Ltd, PCI Electrical Ltd

    • Electrical engineering installation works
    • Electrical services
    • Electrical-system repair services
    Contract value
    £50kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    14 Sept 2026 → 13 Sept 2027 · 11 months · up to 31 Jul 2031 with extensions
    Reference
    ocds-h6vhtk-069c3d
  23. Ends · in 338 days

    National Gallery Research Centre Excavation and Structures

    National Gallery · Central government · Greater London

    Incumbent: Erith Contractors Ltd

    • Basement excavation work
    • Structural works
    Contract value
    £4.7m
    Annual run-rate
    £3.9mvalue ÷ published term
    Term
    8 Jul 2026 → 16 Sept 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-05f5f4
  24. Ends · in 344 days

    PKC13611 Modernisation of Passenger Lifts at Various Sites within Perth & Kinross

    Perth & Kinross Council · Local authority · Scotland

    Incumbent: Classic Lifts (Scotland) Ltd

    • Construction work
    Contract value
    £860k
    Annual run-rate
    —start date not published
    Term
    Ends 22 Sept 2027 · start not published
    Reference
    ocds-h6vhtk-06707e
  25. Ends · in 349 days

    Design, Supply, and Installation of a Liquid Nitrogen Storage &Distribution System

    UK Atomic Energy Authority · Other public body · Nationwide (UK), South East England

    Incumbent: AS Scientific products Ltd

    • Design-modelling services
    • Engineering design services
    • Engineering services
    Contract value
    £1.1m
    Annual run-rate
    £624kvalue ÷ published term
    Term
    26 Nov 2025 → 27 Sept 2027 · 1.8 yrs
    Reference
    ocds-h6vhtk-04ef21
How to read the radar
  • End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.