University Hospitals of Morecambe Bay NHS Foundation Trust: Contract Register & Procurement Profile
NHS ODS: NHS TRUST·Central government·North West England·Kendal·Ran 1 procurement for other authorities
Official UK PPONPGWW-7958-CHJDWebsiteuhmb.nhs.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
29 awarded tenders, 22 different suppliers.
Describes the record. It is not a sign of favouritism.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work5 procedures · 19%64 Postal and telecommunications services5 procedures · 19%71 Architectural, construction, engineering4 procedures · 15%85 Health and social work services4 procedures · 15%72 IT services: consulting, software, internet3 procedures · 11%42 Industrial machinery2 procedures · 7%15 Food, drink, tobacco1 procedures · 4%24 Chemical products1 procedures · 4%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 27 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 85% (23 notices)
- Framework 15% (4 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Limited / restricted 78% (21 notices)
- Open 15% (4 notices)
- Route not published 7% (2 notices)
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 4 lots from this buyer’s competitions, last 24 months. Small sample.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 27 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 2 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| WHISTL UK LIMITED | 5 | 17.2% | 5 | 5 | 3 Jun 2026 |
| THE JAMES MERCER GROUP LIMITED | 3 | 10.3% | 3 | 3 | 2 Apr 2026 |
| DAY Project Management Limited | 2 | 6.9% | 2 | 2 | 13 Jul 2026 |
| Multi Health Specialists Limited | 1 | 3.4% | 1 | 1 | 26 Jun 2026 |
| Lancashire Hospital Services Limited | 1 | 3.4% | 1 | 1 | 4 Feb 2025 |
| Hydraclean Limited | 1 | 3.4% | 1 | 1 | 5 Jun 2026 |
| Energy Efficient Solutions Group Ltd | 1 | 3.4% | 1 | 1 | 5 Nov 2025 |
| Gables UK Limited | 1 | 3.4% | 1 | 1 | 30 Dec 2025 |
The three most frequent suppliers are named on 34% of 29 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 22 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Outpatient Pharmacy Services | Lancashire Hospital Services Limited | — | — | £12,000,000 † |
| Security Guards and Care Led Security Supervision | Lingwood Security Management Ltd | — | — | £2,276,046 † |
| Furness General Hospital High Level Roof Replacement- RS5 | Gables UK Limited | — | — | £1,496,995 † |
| The installation of Solar Panels | Energy Efficient Solutions Group Ltd | — | — | £1,426,667 † |
| Architectural Services for UHMB Diagnostic Schemes | Day Architectural Limited | — | — | £678,086 † |
Recent procedures
Latest 38 of 37 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| RLI Pharmacy Robot RefurbishmentConstruction project management services | Awarded / complete | 2 Sept 2026 | — |
| Clinical Waste Management ServicesClinical-waste collection services | Awarded / complete | 1 Sept 2026 | £10,250,000 |
| Architectural Services for UHMB Diagnostic SchemesArchitectural and related services | Awarded / complete | 11 Aug 2026 | — |
| Provision of Milk & Bread - University Hospitals of Morecambe BayBread | Open | 10 Aug 2026 | £637,260 |
| Cost Management for UHMB Diagnostic SchemesQuantity surveying services | Awarded / complete | 31 Jul 2026 | — |
| Project Management Diagnostic SchemesProject management consultancy services | Awarded / complete | 13 Jul 2026 | — |
| Maintenance of Piped medical Gases and Vacuum SystemsMedical gases | Awarded / complete | 2 Jul 2026 | £220,000 |
| Project Management Lancaster EDProject management consultancy services | Awarded / complete | 26 Jun 2026 | — |
| Project Management Diagnostic SchemesProject management consultancy services | Awarded / complete | 24 Jun 2026 | — |
| Legionella and Pseudomonas Sampling and TestingTechnical testing | Awarded / complete | 23 Jun 2026 | £115,000 |
| Postage - UHMBPost and courier services | Awarded / complete | 3 Jun 2026 | — |
| UHMB - Insourcing TenderMedical specialist services | Open | 8 May 2026 | £9,000,000 |
| UHMB - CRU Condensate Receiver RLIParts of air-conditioning machines | Awarded / complete | 2 Apr 2026 | — |
| UHMB - BMS Spares RLIParts of air-conditioning machines | Awarded / complete | 2 Apr 2026 | — |
| Patient Transporrt ServicesAmbulance services | Awarded / complete | 20 Mar 2026 | — |
| Security Guards and Care Led Security SupervisionSecurity services | Awarded / complete | 12 Mar 2026 | — |
| Spirax Steam Eco Bolt FGH & RLIBoiler installation work | Awarded / complete | 18 Feb 2026 | — |
| LED Lighting - Royal Lancaster InfirmaryElectrical installation work | Awarded / complete | 18 Feb 2026 | — |
| Furness General Hospital High Level Roof Replacement- RS5Roof | Awarded / complete | 30 Dec 2025 | — |
| The installation of Solar PanelsSolar panel roof-covering work | Awarded / complete | 5 Nov 2025 | — |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£12m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 23 award records on 23 procedures (22 to a single canonical supplier, 0 multi-supplier, 1 with no supplier published). 14 values come from the contract record when the award carried none.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 2 of 30 published contracts carry a period end; 0 end within 18 months, 0 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (7 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PGWW-7958-CHJD