This notice announces an administrative change to an existing contract or market (a dynamic market modification notice). No new tender or admission is opened here; see the linked notices below for the original opportunity.
Official UK procurement notice
National Grid Substation Construction
Authority: NATIONAL GRID UK LIMITED (Public body)
What is being bought3 lots · detail below
Published requirement descriptionThis QUDM is for substation construction, mechanical and electrical installation and major civil works.
To effectively and efficiently deliver the capital works required to meet our Electricity License obligations, manage the risk on our electricity transmission network and to connect new customers,
CPV: Electrical installation work of electrical distribution apparatus · Electrical installation work of transformers · Substation construction work
How this dynamic market works
From the published notice- Type
- Dynamic market · active
- Market period
- 15 Apr 2026 – …
- Buyer types
- utilities
- Supplier levy on call-offs (max %)
- None
Who may buy through it
Available for use by any member of the National Grid group (parent company National Grid plc) and references to National Grid shall be interpreted accordingly as covering the whole group (except where the context requires otherwise).
Specifically this will include:
National Grid Electricity Transmission
National Grid Electricity Distribution
National Grid Ventures
other entities within the National Grid UK corporate structure as may require access
- 100572 Walpole SGT4 Tertiary Connection · NATIONAL GRID ELECTRICITY TRANSMISSION PLC · 13 Oct 2026
Notices that name this market as their framework in the official record. Many call-offs are never published, so this is a floor, not utilisation.
Lots and requirements (3)Procurement structure
3 lots · no lot values publishedLot #1EPC Substation Construction
Scope for Lot 1: EPC Substation Construction
Suppliers in lot 1 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (up to 400kV) transmission network substation environment:
- Detailed electrical and civil design
- Construction Design Management (CDM)
- Programme management
- Project management
- Site management, including acting as Principal Contractor under the CDM Regulations
- Procurement and supply chain management
- Subcontractor management
- Civil engineering
- Protection and control systems installation, configuration and commissioning
- Mechanical and electrical installation, testing and commissioning
An illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period)
- New Build AIS/GIS
- AIS/GIS Substation Extension
- Major AIS/GIS Substation Asset Replacement Operators that are successful in securing a position on lot 1 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid, to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example:
- Power transformers
- Protection and Control
- Gas Insulated Switchgear (GIS)
- Air Insulated Switchgear (AIS)
- Consumables This lot is designed for larger, more complex works requiring a traditional full EPC turnkey approach to delivery of the scope, with typical project estimates being >£20million.
Lot #2Mechanical & Electrical Installations
Scope for Lot 2: Mechanical & Electrical Installation
Suppliers in lot 2 shall compete for stand-alone contracts and shall be responsible for delivering capabilities from the following illustrative list, specific to working within a live high-voltage (132kV~400kV) transmission network substation environment:
- Detailed engineering and civil design, including primary and protection and control design
- Construction Design Management (CDM)
- Programme management
- Project management
- Site management, including acting as Principal Contractor under the CDM Regulations and temporary works management
- Procurement and supply chain management
- Subcontractor management
- Civil engineering
- Protection and control systems installation, configuration and commissioning
An illustrative list of work types included within this lot is as follows (this list is subject to change due to changing or emerging requirements throughout the QUDM period)
- Substation Upgrades / Smaller Extensions
- AIS/GIS Substation Extensions
- AIS/GIS Substation Asset Replacement
Operators that are successful in securing a position on lot 2 of the QUDM may be required to procure products that are to be selected from a list of suppliers that has been pre-approved by National Grid , to accept free-issue equipment and services supplied from contracts that National Grid has placed, or to accept the novation of such a contract after it has been placed by National Grid, for example:
- Power transformers
- Protection and Control
- Gas Insulated Switchgear (GIS)
- Air Insulated Switchgear (AIS)
- Consumables
This Lot is designed for relatively smaller and less complex works than Lot 1 whereby a competent installer or medium sized construction supplier would have the ability to deliver the scope of work, and typical project estimates would be less than
Lot #3Major Civils (>£5m)
Scope for Lot 3: Major Civil
Suppliers in lot 3 shall compete for stand-alone contracts and/or frameworks and shall be responsible for delivering capabilities from the following illustrative list for Substation major civil works with typical project estimated greater than >£5million. Scope shall include but is not limited to, the following illustrative types of works:
- Project & Programme Management:
- Ensure sufficient and competent resources are deployed on the project to deliver the project in accordance with all National Grid standards and specifications.
- Liaison with and management of the interface with any affected landowner, statutory body or undertaker during the delivery of the works (e.g., Local Highways Authority, Network Rail, Environment Agency, Distribution Network Operators).
- Consultation & Engagement:
- Support the Client in the development of consultation materials as required
- Attend and present at consultation events and support the preparation of consultation responses
- Support the Client at any technical stakeholder meetings
- Input into Consultation Report, liaise with Consents Integrator and engage with consultees as required
- Coordinate with Lands Team for survey access
- Assist with S172 evidence compilation and other requirements.
- Surveys:
- Planning, management, delivery and reporting of all surveys required to support the project at all stages of its lifecycle, including:
- Site walkover surveys to verify desktop work
- Borehole surveys
- Perform soil surveys
- Intrusive surveys (e.g., foundation inspections).
- Existing asset surveys.
- Earthing surveys.
- Utility surveys
- Traffic surveys including vehicle volume and speed surveys.
- Design:
- Development of outline design, associated drawings and technical reporting required for inclusion within the planning and/or consent application and the construction works information
- Production of design, which is in accordance with the Client's requirements, eliminates hazards as far as reasonably practicable for the whole life of the assets, facilitates a safe and efficient construction phase and gives due regard to Client's environmental and sustainability requirements.
- Support the Client at any technical stakeholder meetings
- Enact the role of Principal Designer in accordance with the CDM regulations 2015 for the development and/or delivery phase and formerly appoint the Principal Designer Representative as required
- Review the System Design Specification for completeness and identify any gaps
- Review any design works prior to engagement to understand any limitations and restrictions to be carried forward into the subsequent design stage,
- Discharge relevant conditions associated with any approved planning permission and/or consent to ensure these are factored into the detailed design
- Proactively engage and share design information with other design disciplines involved in the project(s) to ensure that all requirements are considered such that a robust, holistic design can be achieved.
- Effectively manage design change ensuring that appropriate communication channels are maintained and document/drawing version control well established.
- Responsible with others at the point of known design interfaces (i.e., HV Substation, HV OHL, HV Cables, etc.) and/or with other parties (i.e., Bulk Purchase Equipment (static wound equipment), Generators, DNO, etc.) to ensure that their project design is the most cost-effective solution which does not compromise any other party's programme and objectives in compliance with the duties and responsibilities identified by current CDM Regulations.
- Design management and coordination to reduce interface risk.
- Building Permanent Structures: The design and construction of new permanent buildings including but not limited to:
- Switch Halls for Gas Insulated Switchgear and other equipment contained therein.
- Ancillary Plant Room Buildings.
- Office & Amenities Blocks.
- Storage and Workshop Units
- Building Services: Building services required for any new build or refurbishment work (e.g., heating / cooling, ventilation, plumbing and sanitation).
- Cable Jointing:
- Provision of jointing resources for cable system installation using client-issued materials.
- Jointing resources and equipment for non-client-issued jointing tasks.
- Temporary works design for jointing techniques.
- Cable Pulling: Delivery of all required cable pulling installations including supply (as required) access, cable trenches, duct installation, jointing, testing, backfilling and cable installation elements.
- Cable Removal: Removal of existing buried HV cable equipment and any associated above ground equipment such as terminations, oil tanks or kiosks including their foundations
- Enabling Works: Pre-construction activities required before commencing the construction of main works including highway and service diversions, ground preparation and remediation, flood mitigation works, demolition of structures, soil stripping and removal, bridge construction, obtaining (including submission and payments of fees) of relevant permits and licences and environmental mitigation works.
- Foundations & Structures: Design and supply of civil works for overhead line, underground cables, substation or other required works and structures including ground preparation; excavation and disposal of or stock piling for re-use of arisings; creating safe working platforms for piling rigs; installation of any piling and construction of pile caps; supply and installation of all form work, reinforcement, and concrete.
- Flood Defence Design & Build: The design and build of flood defences to reduce the risk of flooding to new and existing infrastructure including hydraulic modelling, flood risk assessment, detailed design, drainage, flood defence walls, floodgates, pumping stations.
- Haul Roads and Access Roads:
- Design and build of permanent drainage, roadworks and surfacing to satisfy highway specifications.
- Tr…
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “National Grid Substation Construction” is a dynamic market: the contest is a place on its panel, not a single contract.
Procedure terms & legal framework
From the official record- Procedure method
- Dynamic market
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Administrative change
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Utilities
- Commercial structure
- Dynamic market
- Who may use this agreement
Available for use by any member of the National Grid group (parent company National Grid plc) and references to National Grid shall be interpreted accordingly as covering the whole group (except where the context requires otherwise).
Specifically this will include:
National Grid Electricity Transmission
National Grid Electricity Distribution
National Grid Ventures
other entities within the National Grid UK corporate structure as may require access
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 19 Feb 2026, 09:55 GMT
- Last source update
- 1 Oct 2026, 12:16 BST
- FTS notice number
2026/S 000-015074- Latest notice
- Dynamic market modification notice (UK15)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0657bcFind a Tender
How to participate & submission route
Official notice Apply via portal- Requests to participate (first stage)
- —
- Admission period ends
- —
- Clarification deadline
- —
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Supplier levy on call-offs (max %)
- submission fee · None
forms.office.com/Pages/ResponsePage.aspx ↗
Link for registration form for National Grid eSourcing system
Please complete the form and select correct Dynamic Market to receive further registration details.
Timeline
19 Feb 2026 → 1 Oct 2026 · 2 dates- Tender notice published245 days ago19 Feb 2026, 09:55 GMT
- Latest notice published21 days ago1 Oct 2026, 12:16 BST
Notice history
5 events · 5 releases on Find a Tender · since 19 Feb 2026- Dynamic market intention notice published19 Feb 2026, 09:55 GMTUK13
- Dynamic market establishment notice published21 Apr 2026, 15:17 BSTUK14
- Dynamic market modification notice published16 Jun 2026, 15:13 BSTUK15
- Dynamic market modification notice published4 Aug 2026, 10:08 BSTUK15
- Dynamic market modification notice published1 Oct 2026, 12:16 BSTUK15
Published amendments (3)
3 amendments published without a description.
Routine re-releases (5)
- 2026-04: 1 release · 21 Apr 2026
- 2026-02: 1 release · 19 Feb 2026
Commercial outcome & contract awardsAwards so far
Published awards, contracts and bid statistics, not a forecast3 suppliers are admitted to this dynamic market without individual award values or dates, see the supplier list below.
Contracting authority & participating public bodies
Suppliers admitted to the dynamic market
21 commercial parties on the notice- ALPHA CONSTRUCTION LIMITEDAdmitted to the market
- AMALGAMATED CONSTRUCTION LTDAdmitted to the market
- BAM NUTTALL LIMITEDAdmitted to the market
- COSTAIN LIMITEDAdmitted to the market
- ENVOLVE INFRASTRUCTURE LIMITEDAdmitted to the market
- GALLIFORD TRY CONSTRUCTION LIMITEDAdmitted to the market
- GLOBAL SUBSTATION SOLUTIONS LIMITEDAdmitted to the market
- Kirby Group Engineering ULCAdmitted to the market
- LAING O'ROURKE DELIVERY LIMITEDAdmitted to the market
- LINXON UK LTDAdmitted to the market
Show 11 more suppliers
- M GROUP ENERGY (NETWORK INFRASTRUCTURE) LIMITEDAdmitted to the market
- MORSON PROJECTS LIMITEDAdmitted to the market
- OCU UTILITY SERVICES LIMITEDAdmitted to the market
- Powell Engineering UK Ltd T/as OmexomAdmitted to the market
- RJ McLeod (Contractors) LtdAdmitted to the market
- SIEMENS ENERGY LIMITEDAdmitted to the market
- SKANSKA CONSTRUCTION UK LIMITEDAdmitted to the market
- STRABAG UK LIMITEDAdmitted to the market
- TRANT ENGINEERING LIMITEDAdmitted to the market
- TUDORBORNE LIMITEDAdmitted to the market
- WINSHALL LTDAdmitted to the market
Official documents & specifications (6)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specifications Registration form for National Grid eSourcing platform Please complete details to begin registration process
Notices published for this procedure
- Dynamic market modification notice Dynamic market modification notice on Find a Tender
- Dynamic market modification notice Dynamic market modification notice on Find a Tender
- Dynamic market modification notice Dynamic market modification notice on Find a Tender
- Dynamic market establishment notice Dynamic market establishment notice on Find a Tender
- Dynamic market intention notice Dynamic market intention notice on Find a Tender