Official UK procurement notice
Greener Futures Partnership Decarbonisation Delivery Framework
Authority: Abri Group Limited
What is being bought15 lots · detail below
Published requirement descriptionGreener Futures Partnerships (GFP) have procured a National framework of suitably qualified constructors and consultants for the delivery of retrofit works and services. As well as creating a route to market, GFP aspired to create a truly collaborative framework where all parties contribute and continually develop best practice in the field of decarbonisation. The Framework will be for a total of 7 years (4+3) to enable delivery of the works supported by the Social Housing Decarbonisation Fund and will be open to all Contracting Authorities in England and Wales to access. GFP are also procuring a separate Decarbonisation Delivery Framework for the delivery of retrofit works and services in Scotland, which is the subject of a separate Contract Notice and procurement process conducted in accordance with the Public Contracts Regulations (Scotland) 2015. Abri acted as the CA for the purposes of this procurement who will enter into the Framework Agreement with successful Suppliers.
CPV: Boiler installation work · Boilers · Building consultancy services · Central-heating boilers · Central-heating installation work · Central-heating radiators · Construction work · District heating boiler · Electrical installation work of heating and other electrical building-equipment · Electrical wiring work · Electricity, heating, solar and nuclear energy · Energy-efficiency consultancy services · +23 more
How this framework works
From the published notice- Places
- up to 120 suppliers · 16 bids on the busiest of 15 lots (0.1 per place) · 41 appointed
Lots and requirements (15)Procurement structure
15 lots · all with a published value · a supplier may bid for at most 5 and win at most 5 of them · same evaluation weights on every lotEvery one of these 2 lots carries the same published figure, £140,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Construction Works (up to £5m) North England & North WalesAwarded North East, North West +2Published value£105,000,000
Lot 1a covered Decarbonisation Construction works up to £5m in North England and North Wales.
Work under this Lot 1 could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #2Construction Works (up to £5m) Midlands and Mid WalesAwarded East Midlands, West Midlands +1Published value£70,000,000
Lot 1b covered Decarbonisation Construction works up to £5m in the Midlands and Central Wales.
Work under this could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #3Construction Works (up to £5m) South West England and South WalesAwarded South West, WalesPublished value£42,000,000
Lot 1c covered Decarbonisation Construction works up to £5m in South West England and South Wales.
Work under this could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #4Construction Works (up to £5m) South and East EnglandAwarded East of England, South Eastceiling above
Lot 1d covered Decarbonisation Construction works up to £5m in South and East England.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #5Construction Works (up to £5m) LondonAwarded LondonPublished value£112,000,000
Lot 1e covered Decarbonisation Construction works up to £5m in London.
Work under this Lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #6Construction Works (over £2m) North England and North WalesAwarded North East, North West +2Published value£210,000,000
Lot 2a covered Decarbonisation Construction works over £2m in North England and North Wales.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #7Construction Works (over £2m) Midlands and Mid WalesAwarded East Midlands, West Midlands +1ceiling above
Lot 2b covered Decarbonisation Construction works over £2m in Midlands and Central Wales.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #8Construction Works (over £2m) South West England and South WalesAwarded South West, WalesPublished value£84,000,000
Lot 2c covered Decarbonisation Construction works over £2m in South West England and South Wales.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #9Construction Works (over £2m) South and East EnglandAwarded East of England, South EastPublished value£280,000,000
Lot 2d covered Decarbonisation Construction works over £2m in South and East England.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #10Construction Works (over £2m) LondonAwarded LondonPublished value£224,000,000
Lot 2e covered Decarbonisation Construction works over £2m in London.
Work under this lot could include Solar PV and Battery, Heat Pumps, Electric Heaters, Heat and Hot Water Controller, Mechanical Extract, Solid Floor Insulation, Low Energy, Lighting, Internal Wall Insulation, Suspended Floor Insulation, Loft Insulation, Cavity Wall Insulation, Pitched Roof Insulation, Flat Roof Insulation, Windows, Front Doors, Hydrogen Boilers, Gas Boilers, Biomass, Combined Heating and Power and External Wall Insulation.
Lot #11Consultancy Work - North England and North WalesAwarded North East, North West +1Published value£16,000,000
Lot 3a covered Decarbonisation Consultancy work in North England and North Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Lot #12Consultancy Work - Midlands and Mid WalesAwarded East Midlands, West Midlands +1Published value£10,500,000
Lot 3b covered Decarbonisation Consultancy work in Midlands and Central Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Lot #13Consultancy Work - South West England and South WalesAwarded South East, WalesPublished value£6,300,000
Lot 3c covered Decarbonisation Consultancy work in South West England and South Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Lot #14Consultancy Work - South and East EnglandAwarded East of England, South EastPublished value£21,000,000
Lot 3d covered Decarbonisation Consultancy work in South and East England.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
Lot #15Consultancy Work - LondonAwarded LondonPublished value£16,800,000
Lot 3e covered Decarbonisation Consultancy work in North England and North Wales.
Work under this lot could include provision of Managed Services including Retrofit lead generation and management to deliver eligible Customer referrals, Programme management to deliver eligible installations, Retrofit Advice, Assessment and Coordination Pre-Works, Retrofit Coordination and Evaluation, Deliver air permeability test to a dwelling, Deliver damp survey to a dwelling, Deliver thermographic image survey to a dwelling, Deliver EPR, Air Tightness Test and could also include the provision of interim support in some roles including Retrofit Coordinator, Retrofit Advisor, Retrofit Assessor, Retrofit Designer, Retrofit Evaluator, Project Administrator
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Quality: 40%
- Cost: 60%
Published award criteria (2)
- Quality: 40
- Cost: 60
- Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
- “Greener Futures Partnership Decarbonisation Delivery Framework” is a framework: the contest is a place on its panel, up to 120 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 24 Jan 2023, 20:54 GMT
- Last source update
- 21 May 2023, 12:54 BST
- Award evaluation window
- 28 Feb 2023 – …
- Authority reference
ECH 1205- FTS notice number
2023/S 000-014420- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-039a58Find a Tender
- Review procedure
The Contracting Authority observed a 10-day stand still period following the award to the framework and conducted itself in respect of any appeals in accordance with the Public Contracts Regulations 2015 (as amended)
Publisher note: The Contracting Authority considered that this contract may be suitable for economic operators that are Small or Medium Enterprises (SMEs). However, any selection of tenderers was based solely on the criteria set out for the procurement. There is an intentionally large overlap between the band values for Lot 1a-e and Lot 2a-e. Where works to be carried out under the call off contract are estimated to have a value that falls in the overlap value between Lots 1a-e and 2a-e, the GFP member/Authorised User awarding the contract shall, at its complete discretion, be entitled to: (i) award the contract by direct selection under the Framework Lot of it's choosing, in accordance with the provisions of the Framework (ii) award the contract via a mini-competition under the Framework Lot of its choosing; or (iii) award the contract via a mini-competition between all of the Framework suppliers appointed to the Framework Lots in question that are capable of carrying out the particular contract. Where there is insufficient interest for a particular Call Off Contract under Lots 1a-e or 2a-e, the GFP Members/Authorised User may seek expressions of interest from the Framework Suppliers appointed to the corresponding regional Framework Lot. E.g., if the GFP Member/Authorised User wishes to award a contract under Lot 1a but considers there is insufficient interest for the contract from the suppliers appointed to that Lot it may seek expressions of interest from the suppliers appointed to Lot 2a. Whether there is "insufficient interest" for a contract will be determined by the GFP Member/Authorised User making the award, having regard to the requirements of it's own financial regulations and standing orders, and any other relevant matters. It is intended that a Dynamic Purchasing System (DPS) will be procured at a later date to compliment the Framework and provide access to emerging technology. The framework is to operate across England and Wales and will be open to the following organisations to access via an Access Agreement between the supplier, Abri and Pretium Frameworks Ltd, who GFP has appointed to administer the framework on its behalf. In addition to the GFP members, the following "Authorised Users" will be entitled to use this framework: (i) any entity within the same group of companies as a GFP Member from time to time; (ii) any Social Housing Provider in the United Kingdom from time to time (including Registered Providers, local authorities and Arm’s Length Management Organisations) A list of the current registered providers of social housing can be found here: https://www.gov.uk/government/publications/registered-providers-of-social-housing/list-of-registered-providers-14-april-2022-accessible-version ; (iii) any other “contracting authority” in the UK as defined in the Public Contracts Regulations 2015; and (iv) any supply chain member of a GFP member or of any of the above organisations. Note that the estimated values given in this Notice are estimates only. Actual values may vary depending on how many organisations decide to access and call off contracts under the Framework. The Contracting Authority reserved the right to cancel the procurement and not to proceed with all or any part of the Framework Agreement. The Contracting Authority will not, under any circumstances, reimburse any expense incurred by suppliers in participating in this procurement exercise or in preparing their tender submissions. With reference to Lots 1a-e and Lots 2a-e, Bidders were only able to bid for a specific region under Lot 1 or Lot 2, but not both (i.e. they could not bid for Lot 1a and Lot 2a, only 1a or 2a) Therefore, the maximum number of bids that could be submitted by any one Bidder for Lots 1 and 2 was five, and the maximum number of bids that would be awarded to any one Bidder is five. This is further explained in the procurement documents, specifically the Lot Bidding Form section 1.1
How it was run
Official notice- Appointment period ends
- 3 Mar 2023, 17:00 GMT
- Submission channel
- {"electronicSubmission","written"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Bids opened
- 28 Feb 2023, 12:00 GMT
Timeline
28 Feb 2023 → 21 May 2023 · 3 dates- Bids opened28 Feb 2023, 12:00 GMT
- Admission / appointment period endsperiod end, not a bid countdown3 Mar 2023, 17:00 GMT
- Notice published21 May 2023, 12:54 BST
Notice history
2 events · 3 releases on Find a Tender · since 7 Feb 2023- Deadline moved to 3 Mar 2023, 17:00 GMT7 Feb 2023, 16:39 GMT+3 days · was 28 Feb 2023, 12:00 GMT
- Status changed to complete21 May 2023, 12:54 BST
Published amendments (1 · 1 deadline change)
| When | What | Before | After | Shift |
|---|---|---|---|---|
| — | Deadline28/2/2023 12:00 · IV.2.2 | 28 Feb 2023 | 3 Mar 2023 | +3 d |
Please note amendment to section IV.2.2 providing a revised Tender return time and date being 17:00 3/3/2023
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast107 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 9 of these contracts carry the same published figure, £224,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 6 May 2023
- Value
- £16,800,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £105,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £24,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- ceiling above
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Greener Futures Partnership Decarbonisation Delivery Framework
- Signed
- 5 May 2023
- Value
- £140,000,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Construction Works (up to £5m) North England & North Wales | 7bids · 7 electronic | 3 | — | — |
| 2 · Construction Works (up to £5m) Midlands and Mid Wales | 8bids · 8 electronic | 5 | — | — |
| 3 · Construction Works (up to £5m) South West England and South Wales | 8bids · 8 electronic | 6 | — | — |
| 4 · Construction Works (up to £5m) South and East England | 16bids · 16 electronic | 14 | — | — |
| 5 · Construction Works (up to £5m) London | 14bids · 14 electronic | 13 | — | — |
| 6 · Construction Works (over £2m) North England and North Wales | 12bids · 12 electronic | 4 | — | — |
| 7 · Construction Works (over £2m) Midlands and Mid Wales | 15bids · 15 electronic | 4 | — | — |
| 8 · Construction Works (over £2m) South West England and South Wales | 9bids · 9 electronic | 4 | — | — |
| 9 · Construction Works (over £2m) South and East England | 16bids · 16 electronic | 5 | — | — |
| 10 · Construction Works (over £2m) London | 16bids · 16 electronic | 3 | — | — |
| 11 · Consultancy Work - North England and North Wales | 11bids · 11 electronic | 8 | — | — |
| 12 · Consultancy Work - Midlands and Mid Wales | 13bids · 13 electronic | 10 | — | — |
| 13 · Consultancy Work - South West England and South Wales | 9bids · 9 electronic | 5 | — | — |
| 14 · Consultancy Work - South and East England | 14bids · 14 electronic | 8 | — | — |
| 15 · Consultancy Work - London | 16bids · 16 electronic | 12 | — | — |
Contracting authority & participating public bodies
Dispute resolution & review bodies
- Cabinet OfficeReview contact point
Framework contractors & participating bidders
69 commercial parties on the notice · 50 awardedThe first 50 of 69 commercial parties (by name); the JSON mirror lists them all.
- AD Construction Group (Architectural Decorators Ltd) Framework contractor
- AD Construction Group (Architectural Decorators Ltd) Framework contractor
- Axis Europe plcFramework contractor
- Baily Garner LLPFramework contractor
- Bell Decorating Group Limited Framework contractor
- Breyer Group PlcFramework contractor
- CLC Contractors LimitedFramework contractor
- CLC Contractors Limited Framework contractor
- CoreLogic U.K. LimitedFramework contractor
- CoreLogic U.K. LtdFramework contractor
Show 40 more suppliers
- Correct Contract Services LimitedFramework contractor
- Correct Contract Services LimitedFramework contractor
- Correct Contract Services LimitedFramework contractor
- Cosgrove & Drew LtdFramework contractor
- Dodd Group (Midlands) LimitedFramework contractor
- Dyson Energy Services LtdFramework contractor
- Dyson Energy Services LtdFramework contractor
- Ecogee LtdFramework contractor
- Energy Specifics LtdFramework contractor
- Energy Specifics Ltd.Framework contractor
- Energy Specifics Ltd.Framework contractor
- Equans Regeneration LimitedFramework contractor
- Equans Regeneration LimitedFramework contractor
- Equans Regeneration LtdFramework contractor
- Everwarm LtdFramework contractor
- Everwarm LtdFramework contractor
- Everwarm LtdFramework contractor
- Everwarm LtdFramework contractor
- Faithful+Gould LimitedFramework contractor
- Faithful+Gould LimitedFramework contractor
- Fortem Solutions LimitedFramework contractor
- Guildmore Limited Framework contractor
- Guildmore Limited Framework contractor
- Ian Williams Limited Framework contractor
- Keegans LtdFramework contractor
- Kier Services Limited (T/a Kier Places)Framework contractor
- Kier Services Limited T/a Kier PlacesFramework contractor
- LCB GroupFramework contractor
- LCB GroupFramework contractor
- LCB GroupFramework contractor
- Liberty Group Investments Ltd. Framework contractor
- Liberty Group Investments Ltd. Framework contractor
- Low Carbon Exchange LtdFramework contractor
- Low Carbon Exchange LtdFramework contractor
- Low Carbon Exchange LtdFramework contractor
- Morgan Sindall Property Services Ltd.Framework contractor
- Morgan Sindall Property Services Ltd.Framework contractor
- Mulalley and Company LimitedFramework contractor
- Mulalley and Company LimitedFramework contractor
- Next Energy SolutionsFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria