Find a TenderAwardedContract award notice
Published 5 Feb 2026, 15:57 GMT

Official UK procurement notice

CM3159 Property Management Framework

Official notice

Authority: YORKSHIRE WATER SERVICES LIMITED (Public body)

Open framework scheme7 lotsWorksCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Framework ceiling (notional)£18,000,000total for 7 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 12 Jun 2026awarded 20 Oct 2026
Award (standstill) to CHG Electrical Ltd +26 more7 awards
Framework period 4 yrsends 16 Aug 2030 · up to 16 Aug 2034 with extensions · starts 17 Aug 2026

What is being bought7 lots · detail below

Published requirement description

Yorkshire Water Services Limited is seeking to establish a multi‑supplier Property Management Framework to support the delivery, maintenance, refurbishment, and improvement of its diverse property estate.

The Framework will be structured across multiple Lots, covering a range of works and services. The lotting structure is:

Lot 1 - Estate infrastructure

Lot 2a - Complex Estate infrastructure (PD & PC Required)

Lot 2b - Barns, Slurry Tanks & Septic Tanks

Lot 3 - Interior Renovation

Lot 4a -Structural Engineering & Reporting

Lot 4b - Consultant Building Surveying Services

Lot 5 - Heritage Buildings

The Framework is intended to provide the Client with access to a pool of qualified, competent suppliers capable of delivering works across a range of complexity, risk profiles, and asset types.

The Framework will operate as a multi‑supplier arrangement, with call‑offs awarded primarily through mini‑competition or in rare situation where a high risk has been identified direct award in accordance with the Framework terms. The Framework is being established as an open framework, with provision for periodic re‑opening and re‑competition.

  • How the procedure runs: The procurement is expected to follow the stages below: Selection Questionnaire (SQ): Assessment of bidder capability. Invitation to Tender (ITT): Evaluation of: Quality submissions Commercial proposals Yorkshire Water Services reserves the right to seek clarification of submissions to ensure accurate evaluation. Award Decision: Contracts will be awarded on the basis of the Most Advantageous Tender (MAT).

CPV: Agricultural buildings construction work · Architectural and related services · Architectural services for buildings · Architectural, construction, engineering and inspection services · Barn construction work · Building completion work · Building surveying services · Building-inspection services · Buildings of particular historical or architectural interest · Construction work · Construction-related services · Electrical installation work · +9 more

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Places
up to 45 suppliers · 27 appointed
Framework period
4 yrs · up to 8 yrs from 17 Aug 2026
Scheme runs until
16 Aug 2034
Published description of the framework

The Framework will operate as a multi‑supplier, multi‑lot arrangement, providing Yorkshire Water with access to a pool of pre‑appointed suppliers for the delivery of property management works and services.

Contracts under the Framework ("Call Off Contracts") will be awarded primarily through mini‑competition. All suppliers appointed to the relevant Lot will be invited to submit a tender for the specific requirement. Awards will be made based on defined evaluation criteria, which may include quality, price, and other relevant factors, as set out in the call off documentation. The specific evaluation criteria and weighting applied at Call Off stage will be proportionate to the nature and complexity of the requirement. In rare situation where a high risk has been identified Yorkshire Water may direct award a Call Off.

Call‑Off specific pricing may include:

Fixed (lump sum) pricing

Measured works based on Schedule of Rates

Target cost or cost‑reimbursable arrangements

Time‑charge basis for professional services

The applicable pricing mechanism will be determined at Call Off stage based on the scope, complexity, and risk profile of the requirement. Pricing will be subject to competitive tension through mini‑competition where appropriate, and the Client reserves the right to benchmark and validate pricing to ensure value for money.

The Framework Agreement does not guarantee any minimum volume or value of work. All Call Off Contracts awarded under the Framework will be subject to the terms and conditions of the Framework Agreement and the relevant Call Off documentation.

The Framework will allow for the appointment of multiple suppliers per Lot and will operate as an open framework, with re‑opening to competition periodically. At each re‑opening, all suppliers (including existing Framework suppliers) will be required to reapply and will be evaluated in accordance with the criteria set out in the procurement documents, including the Invitation to Tender and Framework Agreement.

Lots and requirements (7)Procurement structure

7 lots · all with a published value · evaluation weights differ by lot

Every one of these 7 lots carries the same published figure, £2,571,428: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Estate infrastructureAwardedRenewal 4 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 17 Aug 2026 – 16 Aug 2030 (4 yrs) · up to 16 Aug 2034 with extensions
Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.
Lot #2Interior & Exterior RenovationAwardedRenewal 4 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 17 Aug 2026 – 16 Aug 2030 (4 yrs) · up to 16 Aug 2034 with extensions
Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.
Lot #3Heritage BuildingsAwardedRenewal 4 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 17 Aug 2026 – 16 Aug 2030 (4 yrs) · up to 16 Aug 2034 with extensions
Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.
Lot #4Complex Estate infrastructure (PD & PC Required)AwardedRenewal 4 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 17 Aug 2026 – 16 Aug 2030 (4 yrs) · up to 16 Aug 2034 with extensions
Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.
Lot #5Barns, Slurry Tanks & Septic TanksAwardedRenewal 4 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 17 Aug 2026 – 16 Aug 2030 (4 yrs) · up to 16 Aug 2034 with extensions
Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.
Lot #6Structural Engineering & ReportingAwardedRenewal 4 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 17 Aug 2026 – 16 Aug 2030 (4 yrs) · up to 16 Aug 2034 with extensions
Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.
Lot #7Consultant Building Surveying ServicesAwardedRenewal 4 yrsSMEceiling above

The source published no individual description for this lot.

Contract period: 17 Aug 2026 – 16 Aug 2030 (4 yrs) · up to 16 Aug 2034 with extensions
Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • Price carries 30–50 points depending on the lot; most lots put it at 30 points.
  • “CM3159 Property Management Framework” is a framework: the contest is a place on its panel, up to 45 suppliers, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Open framework scheme
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
5 Feb 2026, 15:57 GMT
Last source update
20 Oct 2026, 17:01 BST
Award evaluation window
Submission end – 5 Aug 2026
FTS notice number
2026/S 000-048113
Latest notice
Contract award notice (UK6)
Classification (CPV)
Agricultural buildings construction workArchitectural and related servicesArchitectural services for buildingsArchitectural, construction, engineering and inspection servicesBarn construction workBuilding completion workBuilding surveying servicesBuilding-inspection servicesBuildings of particular historical or architectural interestConstruction work
+11 moreConstruction-related servicesElectrical installation work
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+1 moreSouth West (UKK)
Official registry OCID
ocds-h6vhtk-064947 Find a Tender
How it runs

The procurement is expected to follow the stages below:

Selection Questionnaire (SQ):

Assessment of bidder capability.

Invitation to Tender (ITT):

Evaluation of:

Quality submissions

Commercial proposals

Yorkshire Water Services reserves the right to seek clarification of submissions to ensure accurate evaluation.

Award Decision:

Contracts will be awarded on the basis of the Most Advantageous Tender (MAT).

How it was run

Official notice
Run through: SAP Ariba · Who buys & how to bid on SAP Ariba
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free buyer-specific invitations
Requests to participate (first stage)
12 Jun 2026, 23:59 BST
Appointment period ends
12 Jun 2026, 23:59 BST
Clarification deadline
8 Jun 2026, 23:59 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Tenders must be submitted electronically via SAP Ariba. service.ariba.com/Sourcing.aw ↗

Suppliers will not be able to view or access the tender in SAP Ariba unless they have been invited by Yorkshire Water through the portal.

If you wish to participate but are not yet registered as a Yorkshire Water supplier, please email: [email protected] and include the full legal company name, and the email address you wish to register. You will then be issued with a registration request link.

If you are already registered as a Yorkshire Water supplier on Ariba, please email [email protected] and include your ANID number, your full company name, and your registered Ariba email address, so that you can receive the Conditions of Participation documents.

Timeline

5 Feb 2026 → 29 Oct 2026 · 10 dates
  1. Planning notice published260 days ago
    5 Feb 2026, 15:57 GMT
  2. Market engagement231 days ago
    6 Mar 2026, 23:59 GMT

    If your company meet the required services listed please reach out to [email protected] with and expression of interest and we will respond.

    At this time we are looking to scope the market and the viability of SMEs to delivery the required services self sufficiently without requirements to subcontract where possible. This will help form the final piece of the strategy for the framework prior to the launch of the tender.

  3. Tender notice published154 days ago
    22 May 2026, 15:28 BST
  4. Clarification questions by137 days ago
    8 Jun 2026, 23:59 BST
  5. Admission / appointment period ends133 days ago · period end, not a bid countdown
    12 Jun 2026, 23:59 BST
  6. Award decision expected by79 days ago
    5 Aug 2026, 23:59 BST
  7. Contract starts68 days ago
    17 Aug 2026, 00:00 BST
  8. Assessment summaries sent4 days ago
    20 Oct 2026, 00:00 BST
  9. Latest notice published3 days ago
    20 Oct 2026, 17:01 BST
  10. Today
    23 Oct 2026
  11. Standstill endsin 6 days
    29 Oct 2026, 23:59 GMT

Notice history

8 events · 3 releases on Find a Tender · since 5 Feb 2026
  1. Preliminary market engagement notice published
    5 Feb 2026, 15:57 GMT
    UK2
  2. Tender notice published
    22 May 2026, 15:28 BST
    UK4
  3. Published value updated to £18,000,000
    22 May 2026, 15:28 BST
    was £4,000,000
  4. Status changed to active
    22 May 2026, 15:28 BST
  5. Procurement method changed
    22 May 2026, 15:28 BST
  6. Contract award notice published
    20 Oct 2026, 17:01 BST
    UK6
  7. Status changed to complete
    20 Oct 2026, 17:01 BST
  8. Contract signature expected
    2 Nov 2026, 23:59 GMT
    scheduled

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast

£2,571,428 is the framework's published maximum, restated by the publisher on 7 award rows. It is one ceiling, not 7 separate sums, and no share per lot is published; those rows read “ceiling above”.

Awarded toValueDateStatus
Lot 1 · Estate infrastructure1 award
CHG Electrical Ltd, CRAFTSMAN RESTORATION LTD TA UK RESTORATION SERVICES, Construction Marine Limited, INDEPTH CIVIL ENGINEERING SERVICES LIMITED, John Rowan & Partners LLPSME, R.S. CHURCH (PLANT HIRE) LIMITED +4 more2 Nov 2026 – 1 Nov 2030 · up to 1 Nov 2034Extensions: The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement.ceiling above20 Oct 2026standstill to 29 Oct 2026Standstill
Lot 2 · Interior & Exterior Renovation1 award
Assix LtdSME, C. A. M. BUILDING LIMITED, CRAFTSMAN RESTORATION LTD TA UK RESTORATION SERVICES, Dobson Construction LtdSME, Graham Asset Management LtdVCSE, INGENI PROPERTY SERVICES LIMITED +4 more2 Nov 2026 – 1 Nov 2030 · up to 1 Nov 2034Extensions: "The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement."ceiling above20 Oct 2026standstill to 29 Oct 2026Standstill
Lot 3 · Heritage Buildings1 award
Assix LtdSME, Claywood Construction Ltd, GALLAWAY CONSTRUCTION LIMITED, Graham Asset Management LtdVCSE, William Birch & Sons LtdSME2 Nov 2026 – 1 Nov 2030 · up to 1 Nov 2034Extensions: "The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement."ceiling above20 Oct 2026standstill to 29 Oct 2026Standstill
Lot 4 · Complex Estate infrastructure (PD & PC Required)1 award
Barhale Ltd, Graham Asset Management LtdVCSE, John Rowan & Partners LLPSME, Meldrum Construction Services LtdSME, THE FREEDOM GROUP OF COMPANIES LTD.2 Nov 2026 – 1 Nov 2030 · up to 1 Nov 2034Extensions: "The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement."ceiling above20 Oct 2026standstill to 29 Oct 2026Standstill
Lot 5 · Barns, Slurry Tanks & Septic Tanks1 award
Barhale Ltd, GALLAWAY CONSTRUCTION LIMITED, INDEPTH CIVIL ENGINEERING SERVICES LIMITED, R.S. CHURCH (PLANT HIRE) LIMITED2 Nov 2026 – 1 Nov 2030 · up to 1 Nov 2034Extensions: "The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement."ceiling above20 Oct 2026standstill to 29 Oct 2026Standstill
Lot 6 · Structural Engineering & Reporting1 award
GCA (UK) LIMITED, Gateley Smithers PurslowSME, JNP Group Consulting Engineers LtdSME, PAUL WAITE ASSOCIATES LIMITED, Wilde Consultants LtdSME2 Nov 2026 – 1 Nov 2030 · up to 1 Nov 2034Extensions: "The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement."ceiling above20 Oct 2026standstill to 29 Oct 2026Standstill
Lot 7 · Consultant Building Surveying Services1 award
Bowman Riley Architects LimitedSME, Fisher German LLP, Gateley Smithers PurslowSME, John Rowan & Partners LLPSME, SYCAMORE SQUARE GROUP LTD2 Nov 2026 – 1 Nov 2030 · up to 1 Nov 2034Extensions: "The Framework will have an initial duration of four (4) years, with the option for the Client to extend the Framework by up to an additional four (4) years, resulting in a maximum total duration of eight (8) years. The extension may be exercised in increments determined by the Client, which may include, but are not limited to: A single extension of up to four (4) years; or Multiple shorter extensions (e.g. annual extensions), provided that the total framework duration does not exceed eight (8) years. The decision to extend the Framework will be at the sole discretion of the Yorkshire Water, and will be subject to considerations including (but not limited to): Continued business need and value for money Ongoing compliance with legal and regulatory requirements Satisfactory market conditions and competitiveness of the Framework The effectiveness of the Framework in delivering its intended outcomes The Client reserves the right not to exercise the extension option, or to extend the Framework for a reduced period, based on the above factors. Any extension will be communicated to all Framework suppliers in accordance with the terms of the Framework Agreement."ceiling above20 Oct 2026standstill to 29 Oct 2026Standstill

Contracting authority & participating public bodies

YORKSHIRE WATER SERVICES LIMITED

Contracting authorityPrivate utility GB-COH: 02366682 · GB-PPON: PXGT-3622-WXBQ Ellington House, Leeds, Yorkshire & Humber, LS10 1ABContact email

Framework contractors & participating bidders

28 commercial parties on the notice
  • ASSIX LIMITEDFramework contractorGB-COH: 10512350GB-PPON: PXDD-8342-VLMR F6 & F7 Epic House F6 & F7 Epic House, Sheffield, Yorkshire & Humber, S9 5AAContact email
  • BARHALE LIMITEDFramework contractorGB-COH: 01268005GB-PPON: PBDB-2823-WDLQ Barhale House, Walsall, West Midlands, WS1 4NNContact email
  • BOWMAN RILEY ARCHITECTS LIMITEDFramework contractorGB-COH: 04902632GB-PPON: PJMN-3849-XZHR Wellington House, Skipton, Yorkshire & Humber, BD23 1ELContact email
  • Bellrock Advisory LLPFramework contractorGB-COH: OC302030GB-PPON: PRMC-4659-PWGN 6-8 Greencoat Place, London, London, SW1P 1PLContact email
  • C. A. M. BUILDING LIMITEDFramework contractorGB-COH: 07852842GB-PPON: PWXD-5819-HDWV Unit 1 Drapers Industrial Estate, Hull, Yorkshire & Humber, HU8 8BBContact email
  • CHG ELECTRICAL LIMITEDFramework contractorGB-COH: 05032219GB-PPON: PTMD-1432-XJXN 2 Wortley Road, Sheffield, Yorkshire & Humber, S36 2UZContact email
  • CLAYWOOD CONSTRUCTION LIMITEDFramework contractorGB-COH: 11897181GB-PPON: PPHT-7645-MHBZ Unit 4 Clayton Wood Court, Leeds, Yorkshire & Humber, LS16 6QWContact email
  • CONSTRUCTION MARINE LIMITEDFramework contractorGB-COH: 02034695GB-PPON: PXBC-5687-LMYN The Coach House, Mansion Gate Drive, Leeds, Yorkshire & Humber, LS7 4FEContact email
  • CRAFTSMAN RESTORATION LTD TA UK RESTORATION SERVICESFramework contractorGB-COH: 07339652GB-PPON: PVZD-5223-WHBJ Simpson Street Works, Simpson Street, Hapton, Burnley, North West, BB12 7LJContact email
  • DOBSON CONSTRUCTION LIMITEDFramework contractorGB-COH: 05081767GB-PPON: PGLV-3358-CNHD Unit 9, Drill Hall Business, Ilkley, Yorkshire & Humber, LS29 8EZContact email
Show 18 more suppliers
  • FISHER GERMAN LLPFramework contractorGB-COH: OC317554GB-PPON: PJXQ-5555-CMYR The Head Office Ivanhoe Office Park, Ashby-De-La-Zouch, East Midlands, LE65 2ABContact email
  • GALLAWAY CONSTRUCTION LIMITEDFramework contractorGB-COH: 04405100GB-PPON: PJVM-7393-WBVP The Old School House Manchester Road, Manchester, North West, M31 4UGContact email
  • GALLAWAY CONSTRUCTION LIMITEDFramework contractorGB-PPON: PJVM-7393-WBVP The Old School House Manchester Road, Manchester, North West, M31 4UGContact email
  • GATELEY SMITHERS PURSLOW LIMITEDFramework contractorGB-COH: 01402539GB-PPON: PPTJ-2696-DXJL One Eleven Edmund Street, Birmingham, West Midlands, B3 2HJContact email
  • GCA (UK) LIMITEDFramework contractorGB-COH: 03895205GB-PPON: PVHP-7129-LWGL St Helens House, Derby, East Midlands, DE1 3EEContact email
  • GRAHAM ASSET MANAGEMENT LIMITEDFramework contractorGB-COH: NI071100GB-PPON: PPYB-6457-CJZM 5 Ballygowan Road, Hillsborough, Northern Ireland, BT26 6HXContact email
  • INDEPTH CIVIL ENGINEERING SERVICES LIMITEDFramework contractorGB-COH: 04500728GB-PPON: PNLQ-6598-VRVD Northways Court Great North Road, Leeds, Yorkshire & Humber, LS25 3AUContact email
  • INGENI PROPERTY SERVICES LIMITEDFramework contractorGB-COH: 09955353GB-PPON: PQWW-2948-MLMZ Steel Box Works Unit 8, Rotherham, Yorkshire & Humber, S60 2XLContact email
  • JNP GROUP CONSULTING ENGINEERS LIMITEDFramework contractorGB-COH: 10234789GB-PPON: PBRM-7741-TXHJ Second Floor Kennel Club House, Aylesbury, South East, HP19 8DBContact email
  • MELDRUM CONSTRUCTION SERVICES LIMITEDFramework contractorGB-COH: 04250084GB-PPON: PZNM-3423-YXRT Pantheon Building Lancaster Road, Gateshead, North East, NE11 9JWContact email
  • PAUL WAITE ASSOCIATES LIMITEDFramework contractorGB-COH: 04217530GB-PPON: PJLT-8724-VWVH Summit House, Riparian Way, Cross Hills, Keighley, Yorkshire & Humber, BD20 7BWContact email
  • R.N. WOOLER & COMPANY LIMITEDFramework contractorGB-COH: 01933071GB-PPON: PZPV-2365-LVRZ Florence House, Lawkholme Lane, Yorkshire & Humber, BD21 3LAContact email
  • R.S. CHURCH (PLANT HIRE) LIMITEDFramework contractorGB-COH: 08353172GB-PPON: PYTJ-9491-HJPW Corn Close Farm Low Wath Road, Harrogate, Yorkshire & Humber, HG3 5HLContact email
  • SYCAMORE SQUARE GROUP LTDFramework contractorGB-COH: 11427690GB-PPON: PQZT-5716-HRXN 46 Park Place, Leeds, Yorkshire & Humber, LS1 2RYContact email
  • THE FREEDOM GROUP OF COMPANIES LTD.Framework contractorGB-COH: 02867838GB-PPON: PLYL-4751-YNZX Ground Floor (Suite T), Arlington Business Centre White Rose Park, Leeds, Yorkshire & Humber, LS11 0DLContact email
  • Total Ground Solutions (Lincs) LimitedFramework contractorGB-COH: 16772665GB-PPON: PYQG-4978-GNZR 15 Low Street, Doncaster, Yorkshire & Humber, DN9 2LAContact email
  • WILDE CONSULTANTS LIMITEDFramework contractorGB-COH: 02603960GB-PPON: PMPC-2652-PPXD Brindley Lodge, Adcroft Street, Stockport, North West, SK1 3HSContact email
  • WILLIAM BIRCH & SONS LIMITEDFramework contractorGB-COH: 00129834GB-PPON: PRGP-6331-RLDT 1 Link Road Court, York, Yorkshire & Humber, YO10 3JQContact email

Official documents & specifications (9)

Official links; attachments are not copied

Notices published for this procedure