Official UK procurement notice
1NextGen Electrolysis - Blending Equipment
Authority: Wales & West Utilities Limited
What is being bought2 lots · detail below
Published requirement descriptionWWU require a supplier to design and install a hydrogen blending unit and associated equipment to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process.
The customer process is non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer.
The blending infrastructure will need to be able to meet the requirements set out in the scope. These requirements are taken from the recently published FUNCTIONAL SPECIFICATION FOR HYDROGEN BLENDING INFRASTRUCTURE a copy of which can be found in Appendix 1 in the scope. WWU will own and operate the hydrogen blending unit and any associated equipment which will be located at the customers site in line with Model 2 in the functional blending spec.
CPV: For the gas industry · Gas network equipment · Gas pressure equipment · Gas regulation equipment installation work · Geological and geophysical instruments · Industrial process control equipment and remote-control equipment · Instrumentation and control equipment
Lots and requirements (2)Procurement structure
2 lots · no lot values published · a supplier may bid for at most 1 and win at most 1 of themLot #1Equipment Supply onlyCancelled
Blending equipment
Natural gas inlet: Pressure: 75 mbar inlet, Temp: -5 to 40 C, Max consumption: Daily - 25384.11 kWh, Max consumption: ½ Hourly - 1191.88 kWh, Mean consumption: Daily - 20175.21 kWh, Mean consumption: ½ Hourly - 435.96 kWh
Hydrogen: Max H2 production: 45scmh (4.5kgH2/hr), Pressure: 2 to 7 bar from electrolyser but will be reduced to match the NG inlet, Temp: 60C from electrolyser but short run of pipe to blending tee so -5 to 60C
Blended outlet: Injection into existing 3" steel pipework at 75 mbar
The blending unit will be required to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process. The customer process in non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer.
The blending infrastructure will need to be able to meet the requirements set out in the below Requirements section. These requirements are taken from the recently published FUNCTIONAL SPECIFICATION FOR HYDROGEN BLENDING INFRASTRUCTURE. WWU will own and operate the hydrogen blending unit and any associated equipment which will be located at the customers site in line with Model 2 in the functional blending spec.
FUNCTIONAL REQUIREMENTS
HYDROGEN PRESSURE REGULATION AND METERING Hydrogen pressure regulation and control is required to ensure there is sufficient pressure at the point of injection into the customers system. Pressure regulation and control shall be to IGEM/TD/13 and or IGEM/TD/23. Hydrogen volume and energy flowrate are required and the metering system shall be appropriate for hydrogen that is compliant with Table 5 of IGEM/H/1 and Table 2 of PAS 4444.
ACCURACY The hydrogen metering system should meet the accuracy requirements of Table 2 of the Functional Blending Specification in Appendix 1.
HYDROGEN/GCV CONTROL Hydrogen injection rate shall be controlled so as to achieve:
a minimum gross calorific value of gas at the comingled point
a hydrogen content of the blend that is no greater than a maximum of 20% by volume
a Wobbe index of the blend that is no less than the lower Wobbe limit permitted by Schedule 3 of the GSMR.GAS SAMPLING AND ANALYSIS
HYDROGEN SUPPLY Gas sampling and analysis shall continuously or continually monitor the hydrogen supplied to the hydrogen blending unit .
COMINGLED POINT Gas sampling and analysis shall continuously or continually monitor the blend at the comingled point and provide confirmation that it is compliant the minimum requirements agreed with WWU. A schedule of parameters that shall be monitored is given in Table 1 of the Functional Blending Specification.
Calorific value shall be determined using an instrument approved by Ofgem for determination of calorific values for the purposes of determining the reference point against which flow weighted average calorific value (FWACV) capping shall apply. The instrument shall comply with the requirements listed in an appropriate Letter of Approval from Ofgem.
ACCURACY The gas analysis system(s) shall meet the accuracy requirements of Table 3 of the Functional Blending Specification in Appendix 1.
REMOTELY OPERATED VALVE A Remotely Operated Valve (ROV) shall be supplied, which shall be capable of manual remote or automatic closure in the event of variation in blend outside of the agreed conditions or inability to provide sufficient blending where this is practiced. A more detailed description of trip and reset philosophy is given in the Gas Quality and Supervisory system functional block. The means of actuation of the ROV shall be the choice of WWU.
FWACV FUNCTIONALITY The system shall deliver the functionality required for the FWACV regime, namely requirements set out in the Gas (COTE) Regulations. Conditions currently specified include the following:
Acquisition and storage of gross CV of the supplied hydrogen from the approved CV determination device, together with a flag indicating its quality/suitability for use. For non-continual CV determination devices, the System - CV determination device interface shall be such that only one value of each CV determination is acquired.
Acquisition and storage of instantaneous volumetric flowrate of hydrogen at the time of acquisition of gross CV.
Initiation of daily calibration of CV determination device.
Automated tests of apparatus and equipment at periods not exceeding 35 days in accordance with Regulation 6(e) of the Gas (COTE) Regulations. The facility to manually initiate tests of apparatus and equipment either by, or at the request of, the Gas Examiner. Provision of a report of results of automated or manual tests in accordance with Regulation 6(e) of the Gas (COTE) Regulations.
Calculation of the daily average CV of the hydrogen at the end of each Gas Day in the manner specified by the Letter of Direction or by WWU depending on site specific conditions. This will require confirmation of the quality of individual records (records are Good if the CV determination device is operating within agreed limits) and averaging of only those records that are Good and for which gas is flowing past the sample point. In addition, a flag shall be stored indicating whether the resulting daily average CV is Valid (i.e., the maximum time between Good records is less than 8 hours). Gross CV values during calibration or tests of apparatus and equipment shall not be included for averaging.
Acquisition and storage of integrated daily volume at the end of the Gas Day.
In addition to local storage of individual data acquired, appropriate means of secure transfer of data to WWU
Any software and hardware solutions are acceptable provided they deliver the required FWACV functionality, but WWU will require demonstration that the required func…
Lot #2Equipment Supply & Install CompleteAwarded
Connect electrolyser to inlet of blending equipment via designed pipework.
Connect existing natural gas pipework into blending equipment inlet.
Connect blending equipment outlet to the customers' existing gas service , downstream of the meter
Carry out all civils for the Hydrogen blending equipment and pipework.
Note : WWU reserve the right to carry out Work package 2 to inform future learnings of the gas networks activities.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Suitability
To be identified in the Invitation to Tender if required.
- Legal form for consortia
- In the event that Contractors form a joint venture, partnership or other form of consortia, joint and several liability of each participant will be required by the Contracting Entity.
- Staff
- Names and qualifications of delivery staff must be submitted
- Shortlisting
- To be identified in the Invitation to Tender if required.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
- Procurement category
- Goods
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- No (one-off requirement)
- First published
- 6 Nov 2024, 12:26 GMT
- Last source update
- 6 Feb 2026, 15:04 GMT
- FTS notice number
2026/S 000-011043- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04b447Find a Tender- Contract terms summary
To be identified in the Invitation to Tender if required.
Publisher note: Applicants must respond to this notice via e-mail and must be registered on WWU's BravoSolution platform to be invited to participate in future rounds of this sourcing event by the deadline of this notice. If you are not registered or are registered but have not advised us of your registration we cannot add you to the sourcing project and you cannot participate in this sourcing project. Please proceed to www.sourcing4wwu.bravosolution.co.uk and click on 'Register Now'. If you have previously registered on www.sourcing4wwu.bravosolution.co.uk please check all the details are correct (do not re-register if you have done so previously). Once you have registered/checked your details are correct please e-mail [email protected] confirming your registration and expressing your interest to participate.
How it was run
Official notice- Submission deadline
- 6 Dec 2024, 12:00 GMT
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Participation fee
- document
- Deposits and guarantees
- To be identified in the Invitation to Tender if required.
Timeline
6 Dec 2024 → 6 Feb 2026 · 2 dates- Submission deadline6 Dec 2024, 12:00 GMT
- Notice published257 days ago6 Feb 2026, 15:04 GMT
Notice history
1 event · 3 releases on Find a Tender- Status changed to complete14 Oct 2025, 15:24 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast2 further award records carry no date or value.
Contracts
Contract 011043-2026-WWU1440-1 · supplier not published
- Signed
- 2 Feb 2026
- Value
- —
- Status
- active
Contract 065271-2025-WWU1440-1 · supplier not published
- Signed
- 8 Oct 2025
- Value
- —
- Status
- active
Contracting authority & participating public bodies
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria