Expiring UK Public Contracts: Retender Radar

Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 616–630

  1. Ends · in 827 daysFramework recordPanel · 7 suppliers

    YPO - 001240 Garage And Workshop Equipment Including Spare Parts, Ancillary And Associated Services

    YPO · Nationwide (UK)

    Panel: Cooper Mobile Services Limited, GEMCO UK Ltd, GSF Car Parts Limited +4 more

    • Parts and accessories for vehicles and their engines
    Published value
    £20mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 2 Feb 2029 · start not published
    Reference
    ocds-h6vhtk-0469bd
  2. Estimated end · in 839 daysFramework record

    P-3023 Supply of Double Deck Zero Emission Buses

    Translink · Northern Ireland

    Incumbent: Bamford Bus Company Ltd Trading as Wrightbus

    • Buses and coaches
    Published value
    £460mpublished ceiling for the whole framework
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 14 Feb 2029 · start not published
    Reference
    ocds-h6vhtk-0472c7
  3. Estimated end · in 839 daysCall-off

    Supply of Mobile Judgement Range

    Metropolitan Police Service · Police & fire · Greater London, South East England

    Incumbent: Inveris Training Solutions Ltd · Last contest: 5 bids

    Contract for the award of a mobile judgement range

    • Training simulators
    Published value
    £499kvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Estimated end 14 Feb 2029 · start not published
    Reference
    ocds-h6vhtk-045491
  4. Estimated end · in 840 days

    Replacement DVOR Electronics at Kirkwall Airport

    Highlands and Islands Airports Limited · Scotland

    Incumbent: Systems Interface Limited

    Replacement of the DVOR and associated Remote Control and Monitoring System is required. HIAL intends to re-use some, or all, of the existing infrastructure including the counterpoise, cabin, electrical systems and intersite connectivity.

    • Doppler VHF Omni direction Range (DVOR)
    Published value
    Not published
    Annual run-rate
    —value not published
    Term
    Estimated end 15 Feb 2029 · start not published
    Reference
    ocds-h6vhtk-037ff2
  5. Ends · in 842 daysExtension option · up to 17 Feb 2031

    Recycling Boxes

    Braintree District Council · Central government · East of England

    Incumbent: IPL PLASTICS (UK) LIMITED

    The supply of 55 litre black plastic recycling boxes and removable black lids for routine/business as usual requirements (BAU), the replacement through damage or wear and tear, as well as one-off bulk orders, including design/printing on on…

    Published value
    £279k
    Annual run-rate
    £93kpublished value ÷ term, exc. VAT
    Term
    18 Feb 2026 → 17 Feb 2029 · 3 yrs · up to 17 Feb 2031 with extensions
    Reference
    ocds-h6vhtk-05a576
  6. Estimated end · in 846 days

    AGREEMENT FOR THE SIGNAGE SERVICES

    LONDON METROPOLITAN UNIVERSITY · Education · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Display Signs Limited · Last contest: 8 bids

    Contract for the Wayfinding and Signage Services for LMU as part of Estates Strategy.

    • Signage
    Published value
    £500k
    Annual run-rate
    —start date not published
    Term
    Estimated end 21 Feb 2029 · start not published
    Reference
    ocds-h6vhtk-04be8e
  7. Ends · in 847 daysExtension option · up to 22 Feb 2031

    P-3346 Supply of B7R Camshaft Kits

    Translink · Central government · Northern Ireland

    Incumbent: BALLYMENA ENGINES SPARES LIMITED · Last contest: awarded 19% under the estimate

    Translink is undertaking an asset renewal programme of Volvo B7R engines to support bus reliability. To aid this programme, Translink seeks a competent contractor to provide Volvo B7R Camshaft Kits. This will be an initial 3 year contract w…

    Published value
    £200k
    Annual run-rate
    £67kpublished value ÷ term, exc. VAT
    Term
    23 Feb 2026 → 22 Feb 2029 · 3 yrs · up to 22 Feb 2031 with extensions
    Reference
    ocds-h6vhtk-05e118
  8. Estimated end · in 852 daysFramework recordPanel · 3 suppliers

    Framework 118 Supply of Rail

    Ulsterbus · Northern Ireland

    Panel: British Steel Limited, SAARSTAHL RAIL, Voestalpine Rail Technology GMBH

    • Railway materials
    Published value
    £0published ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 27 Feb 2029 · start not published
    Reference
    ocds-h6vhtk-047e7c
  9. Ends · in 852 days

    Replacement Vehicles - Panel Vans, Tippers, Pickups

    Bournemouth, Christchurch and Poole Council · Local authority · South West England

    Incumbent: Hendy Group Limited · Last contest: awarded 31% under the estimate

    Purchase 26 vehicles to replace existing vehicles. The vehicles will consist of 22 vans, 2 tippers and 2 x 4x4 pickups. Awarded supplier required to liaise with existing racking contractor, arranging delivery to them for fitout then onward …

    Published value
    £666k
    Annual run-rate
    £222kpublished value ÷ term, exc. VAT
    Term
    28 Feb 2026 → 27 Feb 2029 · 3 yrs
    Reference
    ocds-h6vhtk-05acde
  10. Estimated end · in 860 days

    Shipyard Detailed Design and Build Contract Vehicle and Passenger Carrying Ferries

    Caledonian Maritime Assets Ltd (Utility) · Scotland

    Incumbent: Remontowa Shipbuilding S.A. · Last contest: 5 bids (0 SME)

    CMAL has appointed a supplier in respect of Shipyard Detailed Design and Build Contract for seven Vehicle and Passenger Carrying Ferries

    • Ships and boats
    Published value
    £148m
    Annual run-rate
    —start date not published
    Term
    Estimated end 7 Mar 2029 · start not published
    Reference
    ocds-h6vhtk-047db9
  11. Estimated end · in 870 daysFramework recordPanel · 2 suppliers

    Total Fleet Solution Framework

    Watford Community Housing · Nationwide (UK)

    Panel: Enterprise Rent-A-Car UK Limited, Northgate Vehicle Hire Limited

    • Motor vehicles
    Published value
    £400mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 17 Mar 2029 · start not published
    Reference
    ocds-h6vhtk-04d717
  12. Ends · in 872 daysExtension option · up to 31 May 2029

    Manufacture and Supply of 92TS Body End Panels for CLIP Fleet

    Docklands Light Railway Limited · Other public body · Nationwide (UK)

    Incumbent: CRMi LTD

    92TS Manufacture and Supply of Body End Panels for Central Line Fleet

    Published value
    £3.1m
    Annual run-rate
    £931kpublished value ÷ term, exc. VAT
    Term
    3 Nov 2025 → 19 Mar 2029 · 3.4 yrs · up to 31 May 2029 with extensions
    Reference
    ocds-h6vhtk-0523a8
  13. Estimated end · in 876 daysFramework recordPanel · 6 suppliers

    FMM-24-003 - Thermoplastic Playground and Line Markings

    the Education Authority · Education · Northern Ireland

    Panel: ALLPLAY IRELAND LIMITED, LARS PLAY LTD, PODIUM 4 SPORT LTD +3 more

    • Road markings
    Published value
    £610kpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 23 Mar 2029 · start not published
    Reference
    ocds-h6vhtk-049bdc
  14. Ends · in 878 days

    5 VivaCity Sensors

    City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber

    Incumbent: Vivacity Labs Limited

    Vivacity is also one of the leading providers in the market for real‑time, long‑duration transport monitoring. Their AI‑powered sensors offer high‑quality multimodal counts, with the ability to distinguish between pedestrians, cyclists, and…

    Published value
    £33k
    Annual run-rate
    £11kpublished value ÷ term, exc. VAT
    Term
    25 Mar 2026 → 25 Mar 2029 · 3 yrs
    Reference
    ocds-h6vhtk-066bcd
  15. Ends · in 884 daysLinked to a framework or DPS

    701712461 - CSAT Phase 1 MCN

    Ministry of Defence · Central government · Greater London

    Incumbent: Centreline AV Limited · Last contest: 4 bids

    The UK Ministry of Defence (MOD) replaced its fleet of BAe146 transport aircraft stationed at RAF Northolt in June 2022, with 2 x New Dassault Falcon 900LX business jets, by adopting a procurement strategy featuring two phases: Phase 1: Com…

    • Fixed-wing aircrafts
    Published value
    £106mvalue of a framework or DPS agreement; may be a ceiling
    Annual run-rate
    —framework or DPS value, not a run-rate
    Term
    Ends 31 Mar 2029 · start not published
    Reference
    ocds-h6vhtk-02f16e

When contracts end · Transport equipment and products
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

578 contracts and agreements end within 24 months, 947 in total · £6.8bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months71
  2. 3–6 months121
  3. 6–12 months198
  4. 12–24 months188

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.