Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.7bn published GBP value, exc. VAT, in the next 24 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 24 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 24 months

Showing 781–795

  1. Ends · in 383 daysFramework re-letPanel · 13 suppliers

    River Restoration

    Natural Resources Wales · Wales (Cymru)

    Panel: A J BUTLER CONTRACTING LIMITED, D w jones fencing, ECOVIGOUR LIMITED +10 more

    • Botanical and zoological garden services and nature reserve services
    • Erection of fencing
    • Pebbles and gravel
    Contract value
    £16mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-0433ef
  2. Ends · in 383 daysFramework re-letPanel · 15 suppliers

    River Restoration

    Natural Resources Wales · Wales (Cymru)

    Panel: A J BUTLER CONTRACTING LIMITED, D w jones fencing, ECOVIGOUR LIMITED +12 more

    • Botanical and zoological garden services and nature reserve services
    • Erection of fencing
    • Pebbles and gravel
    Contract value
    £16mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Nov 2023 → 31 Oct 2027 · 3.9 yrs
    Reference
    ocds-h6vhtk-0433ef
  3. Ends · in 383 days

    WO2151 Replacement of Temporary Classrooms at Frogwell, Hullavington and Minety Primary Schools

    Wiltshire Council · Local authority · South West England

    Incumbent: Stepnell Limited c 3 5 6

    • Architectural, construction, engineering and inspection services
    • Construction work for buildings relating to education and research
    Contract value
    £6.1m
    Annual run-rate
    £3.1mvalue ÷ published term
    Term
    12 Nov 2025 → 31 Oct 2027 · 1.9 yrs
    Reference
    ocds-h6vhtk-04f8e8
  4. Ends · in 383 daysExtension option · up to 31 Oct 2029

    Scaffolding Services

    North West Leicestershire District Council · Local authority · East Midlands

    Incumbent: Another Level Scaffolding Midlands

    • Construction-related services
    • Scaffolding
    • Scaffolding work
    Contract value
    £2.0m
    Annual run-rate
    £1.0mvalue ÷ published term
    Term
    1 Nov 2025 → 31 Oct 2027 · 1.9 yrs · up to 31 Oct 2029 with extensions
    Reference
    ocds-h6vhtk-050388
  5. Ends · in 383 daysFramework re-letPanel · 10 suppliers

    Invasive Non-Native Species Control and Manual River Channel Restoration

    Natural Resources Wales · Wales (Cymru)

    Panel: Countyside Management, ECOVIGOUR LIMITED, Ecological Land Management +7 more

    • Botanical and zoological garden services and nature reserve services
    • Erection of fencing
    • Pebbles and gravel
    Contract value
    £1.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-0433ef
  6. Ends · in 383 daysFramework re-letPanel · 11 suppliers

    Invasive Non-Native Species Control and Manual River Channel Restoration

    Natural Resources Wales · Wales (Cymru)

    Panel: Countryside Management, Countyside Management, ECOVIGOUR LIMITED +8 more

    • Botanical and zoological garden services and nature reserve services
    • Erection of fencing
    • Pebbles and gravel
    Contract value
    £1.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Nov 2023 → 31 Oct 2027 · 3.9 yrs
    Reference
    ocds-h6vhtk-0433ef
  7. Ends · in 383 daysFramework re-letExtension option · up to 31 Oct 2029Panel · 5 suppliers

    Insulation Services Framework - Lot 2 Cavity Wall Insulation

    The Council of the Borough of Kirklees · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: ECO Providers Ltd., Efficient Energy Services Ltd, NORTHERN RETROFIT LIMITED +2 more

    • Insulation work
    • Roof insulation work
    Contract value
    £1.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Nov 2025 → 31 Oct 2027 · 1.9 yrs · up to 31 Oct 2029 with extensions
    Reference
    ocds-h6vhtk-05533c
  8. Ends · in 383 daysFramework re-let

    Tender for Asbestos Removal and Related Services

    Sandwell Metropolitan Borough Council · Local authority · West Midlands

    Incumbent: Insulation Contracting Services Ltd

    • Asbestos removal services
    • Asbestos-removal work
    Contract value
    £918kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-03dcdc
  9. Ends · in 383 daysFramework re-letExtension option · up to 31 Oct 2029Panel · 5 suppliers

    Insulation Services Framework - Lot 1 Loft Insulation

    The Council of the Borough of Kirklees · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Panel: Efficient Energy Services Ltd, IAN WILLIAMS, RE:GEN SOLUTIONS LIMITED +2 more

    • Insulation work
    • Roof insulation work
    Contract value
    £500kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Nov 2025 → 31 Oct 2027 · 1.9 yrs · up to 31 Oct 2029 with extensions
    Reference
    ocds-h6vhtk-05533c
  10. Ends · in 383 daysExtension option · up to 31 Oct 2030Buyer plans to re-tender 1 Jul 2027

    Pool Water Treatment, Service and Support

    UNIVERSITY OF LANCASTER · Education · North West England

    Incumbent: Sterling Hydrotech ltd

    • Cleaning and sanitation services
    • Construction work for swimming pool
    • Equipment for swimming pools
    Contract value
    £291k
    Annual run-rate
    £145kvalue ÷ published term
    Term
    1 Nov 2025 → 31 Oct 2027 · 1.9 yrs · up to 31 Oct 2030 with extensions
    Reference
    ocds-h6vhtk-055799
  11. Ends · in 383 daysFramework re-letExtension option · up to 31 Oct 2028Panel · 4 suppliers

    Provision of Drainage Maintenance Services

    North Lincolnshire Council · Local authority · Yorkshire and the Humber

    Panel: CLEARWAY ENVIRONMENTAL SERVICES (U.K) LIMITED, Clearway Environmental Services Ltd, DALROD (UK) Ltd +1 more

    • Drainage and surface works
    • Drainage works
    • Surface water pollution drainage services
    Contract value
    £159kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    24 Nov 2025 → 31 Oct 2027 · 1.9 yrs · up to 31 Oct 2028 with extensions
    Reference
    ocds-h6vhtk-059435
  12. Ends · in 383 daysExtension option · up to 31 Oct 2028

    B974 – Provision of Servicing & Maintenance of Passenger, Platform, Goods and Stair Lifts

    Bridgend County Borough Council · Local authority · Wales (Cymru)

    Incumbent: Pickerings Lifts

    • Construction work
    • Repair and maintenance services of building installations
    Contract value
    £158k
    Annual run-rate
    £79kvalue ÷ published term
    Term
    1 Nov 2025 → 31 Oct 2027 · 1.9 yrs · up to 31 Oct 2028 with extensions
    Reference
    ocds-h6vhtk-05818b
  13. Ends · in 383 daysExtension option · up to 31 Oct 2028

    Temporary Dam works for M5 Crossing

    Stroud District Council · Local authority · South West England

    Incumbent: Robert Nicholas Limited

    • Construction work for water projects
    Contract value
    £47k
    Annual run-rate
    £37kvalue ÷ published term
    Term
    17 Jul 2026 → 31 Oct 2027 · 1.3 yrs · up to 31 Oct 2028 with extensions
    Reference
    ocds-h6vhtk-067447
  14. Ends · in 383 days

    Project Management Services for GYBC Cremator Plant Replacement & Site Expansion

    Great Yarmouth Borough Council · Local authority

    Incumbent: Gentoo Project Management Limited

    • Cemetery services and cremation services
    • Construction project management services
    • Construction work for crematoriums
    Contract value
    £2
    Annual run-rate
    £1value ÷ published term
    Term
    19 Feb 2026 → 31 Oct 2027 · 1.7 yrs
    Reference
    ocds-h6vhtk-060c53
  15. Ends · in 383 daysFramework re-letPanel · 2 suppliers

    Heating Installations & Associated Works

    South Tyneside Borough Council · Local authority · North East England

    Panel: Expert Fire Solutions Ltd, Rothwell Plumbing Services Limited

    • Heating, ventilation and air-conditioning installation work
    Contract value
    Not published
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Oct 2027 · start not published
    Reference
    ocds-h6vhtk-050fc8
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.