Caledonian Maritime Assets Ltd (Utility): Contract Register & Procurement Profile
Scotland·Port Glasgow·Central purchasing body on 14 of 30 notices
Find a Tender organisation id909Websitecmassets.co.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 11 lots from this buyer’s competitions, last 24 months.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
35 awarded tenders, 30 different suppliers.
Describes the record. It is not a sign of favouritism.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
Open notices
1 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| Shorepower Civils Works | 4 Nov 2026 | 14d | — |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
45 Construction work13 procedures · 43% · 1 open71 Architectural, construction, engineering11 procedures · 37%44 Construction structures and materials6 procedures · 20%43 Mining, quarrying and construction machinery5 procedures · 17%34 Transport equipment and products3 procedures · 10%63 Supporting and auxiliary transport; travel3 procedures · 10%66 Financial and insurance services3 procedures · 10%90 Sewage, refuse, cleaning and environmental3 procedures · 10%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 30 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract93%(28 notices)
28 of 30 notices are Contract (93%).Framework7%(2 notices)
2 of 30 notices are Framework (7%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Open53%(16 notices)
16 of 30 notices are Open (53%).Limited / restricted23%(7 notices)
7 of 30 notices are Limited / restricted (23%).Route not published17%(5 notices)
5 of 30 notices are Route not published (17%).Selective7%(2 notices)
2 of 30 notices are Selective (7%).
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 11 lots from this buyer’s competitions, last 24 months.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 30 notices across all categories, last 24 months.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| navalue GmbH | 4 | 11.4% | 1 | 5 | — |
| George Leslie Ltd | 3 | 8.6% | 2 | 7 | — |
| BDO LLP | 2 | 5.7% | 2 | 4 | — |
| Wallace Stone LLP | 2 | 5.7% | 2 | 2 | — |
| Causeway Geotech Ltd | 1 | 2.9% | 1 | 2 | — |
| Turner & Townsend | 1 | 2.9% | 1 | 2 | — |
| CalMac Ferries Ltd | 1 | 2.9% | 1 | 2 | — |
| ABPmer | 1 | 2.9% | 1 | 1 | — |
The three most frequent suppliers are named on 26% of 35 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 30 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of published VAT-exclusive awards to single suppliers, last 24 months. Left out: concession revenue, framework ceilings, repeated notices, equal-value duplicates.
Published values, not actual spend. The biggest rows are listed so you can check.
i
The middle published award value for this buyer.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| Shipyard Detailed Design and Build Contract “Freight Flex” Ro-Pax Vessels | Guangzhou Shipyard International Co., Ltd. | — | — | £175,000,000 † |
| HOA3 - Harbour Operating Agreement | CalMac Ferries Ltd | — | — | £70,000,000 † |
| HOA3 - Harbour Operating Agreement | CalMac Ferries Ltd | — | — | £67,440,000 † |
| Cumbrae Slipway Reconstruction | George Leslie Ltd | — | — | £9,558,088 † |
| Tiree Terminal New Building, Marshalling Area & Traffic Management Works | Mackenzie Construction Ltd | — | — | £3,925,525 † |
Recent procedures
Latest 50 of 53 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| SVRP Civils & Marine Works FrameworkArchitectural and related services | Awarded / complete | 20 Oct 2026 | — |
| IT Managed ServicesComputer configurations | Awarded / complete | 20 Oct 2026 | — |
| Port Infrastructure Principal InspectionsArchitectural and building-surveying services | Awarded / complete | 13 Oct 2026 | — |
| Ship Brokerage ServiceShip brokerage services | Awarded / complete | 28 Sept 2026 | — |
| Marine Consultancy and Designated PersonMaritime safety inspection services | Awarded / complete | 28 Sept 2026 | — |
| Ardrossan Redevelopment Civils DesignCivil engineering consultancy services | Cancelled | 11 Sept 2026 | — |
| Ardrossan Redevelopment Civils DesignCivil engineering consultancy services | Awarded / complete | 11 Sept 2026 | — |
| Ardrossan Redevelopment Cost AdvisorCalculation of costs | Awarded / complete | 9 Sept 2026 | — |
| Gourock Warehouse Building DemolitionBuilding demolition and wrecking work and earthmoving work | Open | 19 Aug 2026 | — |
| Mull Vessel Concept DesignDesign consultancy services | Awarded / complete | 4 Aug 2026 | £250,000 |
| Insurance Brokerage ServicesInsurance brokerage and agency services | Cancelled | 27 Jul 2026 | — |
| Supplier Engagement Strategy Update - Contractor & Technical Services FrameworksArchitectural design services | Planned | 1 Jul 2026 | — |
| Tiree Terminal New Building, Marshalling Area & Traffic Management WorksBuilding construction work | Awarded / complete | 29 Jun 2026 | — |
| Shipyard Detailed Design and Build Contract “Freight Flex” Ro-Pax VesselsFerry boats | Awarded / complete | 8 Jun 2026 | — |
| Shipyard Supervision Framework call offMarine services | Awarded / complete | 7 May 2026 | — |
| Financial AnalysisFinancial consultancy services | Awarded / complete | 21 Apr 2026 | — |
| Colintraive Terminal Building ExtensionConstruction work | Awarded / complete | 10 Apr 2026 | — |
| Shipyard Detailed Design and Build Contract RoPax VesselFerry boats | Open | 1 Apr 2026 | — |
| Cumbrae Slipway ReconstructionConstruction work | Awarded / complete | 30 Jan 2026 | — |
| Tiree Terminal New Building, Marshalling Area & Traffic Management WorksBuilding construction work | Cancelled | 10 Dec 2025 | — |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 0 of 48 published contracts state an end date; those feed “Contracts ending”.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.