Bath Spa University: Contract Register & Procurement Profile
DfE school register: Higher education institutions·Education·South West England·Bath
Official UK PPONPBMW-5596-NRJW
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
44 awarded tenders, 31 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
92 Recreational, cultural and sporting6 procedures · 13%48 Software package and information systems4 procedures · 9%72 IT services: consulting, software, internet3 procedures · 7%79 Business services: law, marketing, consulting3 procedures · 7%71 Architectural, construction, engineering2 procedures · 4%51 Installation services (except software)1 procedures · 2%85 Health and social work services1 procedures · 2%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 46 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
- Contract 98% (45 notices)
- Framework 2% (1 notices)
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
- Limited / restricted 43% (20 notices)
- Direct award 35% (16 notices)
- Route not published 13% (6 notices)
- Open 7% (3 notices)
- Selective 2% (1 notices)
i
How many companies usually bid when this buyer runs a tender.
Middle value of the bid counts on its award notices, one per lot. Only real competitions count: direct awards and framework places are left out.
Based on 3 lots from this buyer’s competitions, last 24 months. Small sample.
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 46 notices across all categories, last 24 months.
i
Do this buyer’s awards land above or below its own estimates.
Each lot’s published estimate against its award, on this buyer’s competitions, like for like.
Based on 3 lots with both an estimate and an award, last 24 months. Small sample.
A past pattern, not a price to bid.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Herd Property | 5 | 11.4% | 5 | 5 | 15 Jul 2026 |
| Jisc | 4 | 9.1% | 4 | 4 | 11 Jun 2026 |
| EBSCO INTERNATIONAL INC | 4 | 9.1% | 4 | 4 | 5 Jun 2026 |
| Jisc Services Ltd | 2 | 4.5% | 2 | 2 | 29 Jul 2025 |
| TimeEdit AB | 2 | 4.5% | 2 | 2 | 25 Feb 2026 |
| THE COPYRIGHT LICENSING AGENCY LTD | 2 | 4.5% | 2 | 2 | 10 Sept 2026 |
| CBRE Limited | 2 | 4.5% | 2 | 2 | 12 Mar 2026 |
| Terminalfour Solutions Ltd | 2 | 4.5% | 2 | 2 | 10 Sept 2026 |
The three most frequent suppliers are named on 30% of 44 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 31 distinct suppliers hold at least one. Descriptive concentration of published awards — not a statement of preference.
i
How much this buyer has awarded recently, by published values.
Sum of award values to single suppliers, VAT excluded, on notices from the last 24 months. Framework ceilings and repeated totals are left out.
Published values, not actual spend. The biggest rows are listed so you can check.
i
What one of this buyer’s contracts is usually worth.
Middle value of the same awards as the total above.
Largest published awards iThe biggest published awards. Awards to a single supplier with a published value, largest first, so you can check the totals against the notice. A repeated framework total can appear here. Open the notice to check. | Supplier | Awarded | Term | Published value |
|---|---|---|---|---|
| TV Studio Refurbishment - Systems Integrator | Timeline Television Limited | 18 May 2026 | 5 mo · up to 10.3 yrs | £2,157,702 |
| Virtual Learning Environment (VLE) | Blackboard International B.V. | 30 Jun 2026 | 5 yrs | £1,098,004 ≈ £220k/yr |
| Timetabling and Resource Booking System | TimeEdit AB | — | — | £760,000 † |
| Curriculum Management System | TimeEdit AB | 25 Feb 2026 | 4 yrs · up to 10.1 yrs | £498,694 ≈ £125k/yr |
| Euromonitor Passport + Partner access | Jisc Services Ltd | — | — | £104,389 † |
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
A likely retender, not a certain one.
Published end dates only · 31 of 46 contracts carry one · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| Decarb Consultation Work Jan-Sep 2026 | CBRE Limited | 30 Sept 2026 | £49,200 |
| LR 2 Cost Management | EMESEN PROJECTS LIMITED | 1 Oct 2026 | £80,100 |
| NP Demo Contract Administration | Herd Property | 15 Oct 2026 | £49,245 |
| NP Re-provision of Lab Spaces | Herd Property | 16 Oct 2026 | £61,200 |
| TV Studio Refurbishment - Systems Integrator | Timeline Television Limited | 31 Oct 2026 | £2,157,702 |
| LR Planning Application | CBRE Limited | 30 Nov 2026 | £73,200 |
| MULTILITE LIGHTING HOIST MAINTANCE | Multi Lite Limited | 9 Dec 2026 | £70,000 |
| Arthur Gallagher additional PI Insurance | Arthur J. Gallagher (UK) Limited | 19 Feb 2027 | £126,000 |
| INPULSE SURVEY SOFTWARE | QUEST AGENCY LTD | 30 Apr 2027 | £43,614 |
| Jisc core subscription charges 2026-27 | Jisc | 31 Jul 2027 | £47,296 |
Soonest 10 of 12 contracts ending within 18 months.
Recent procedures
Latest 50 of 52 procedures on this authority cluster, incl. beneficiary and procuring-entity roles
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Web Contents Management System 26/27 | Awarded / complete | 10 Sept 2026 | — |
| Web Contents Management System | Awarded / complete | 10 Sept 2026 | — |
| CLA institutional licence 25/26 | Awarded / complete | 10 Sept 2026 | — |
| BSU Demolition Access Road Works | Awarded / complete | 12 Aug 2026 | — |
| Virtual Learning Environment (VLE) Licence Renewal | Awarded / complete | 21 Jul 2026 | — |
| LR 2 Cost Management | Awarded / complete | 15 Jul 2026 | — |
| NP Re-provision of Lab Spaces | Awarded / complete | 15 Jul 2026 | — |
| Avon Armour Planned Maintenance Contract - 2026-2028 | Awarded / complete | 15 Jul 2026 | — |
| Wyn Service Agreement | Awarded / complete | 15 Jul 2026 | — |
| TV Studio Refurbishment - Systems IntegratorInstallation services of radio | Awarded / complete | 23 Jun 2026 | £2,100,000 |
| INPULSE SURVEY SOFTWARE | Awarded / complete | 12 Jun 2026 | — |
| Construction Information Service (CIS) 26-29 | Awarded / complete | 11 Jun 2026 | — |
| non-fully funded Janet connections 26-27 | Awarded / complete | 11 Jun 2026 | — |
| Jisc core subscription charges 2026-27 | Awarded / complete | 11 Jun 2026 | — |
| Building Condition Survey | Awarded / complete | 5 Jun 2026 | — |
| Epigeum Subscription | Awarded / complete | 5 Jun 2026 | — |
| Academic Search Complete 26/29 | Awarded / complete | 5 Jun 2026 | — |
| Business Source Ultimate Subscription 26-29 | Awarded / complete | 5 Jun 2026 | — |
| Curriculum Management SystemEducational software development services | Awarded / complete | 28 Apr 2026 | £600,000 |
| Palo Alto Firewall Security Subscriptions | Awarded / complete | 16 Apr 2026 | — |
Data coverage & method
- Source: Find a Tender OCDS releases; mixed PCR 2015 / Procurement Act 2023 history — no legal-regime label is applied.
- Counts are procedures (one notice family), not lots. Authority cluster = canonical buyer plus beneficiary and procuring-entity roles.
- Published procedure values exist on a minority of notices; their lifetime sum (£4.3m, ceilings stripped) is a catalogue fact, not spend, and is not shown as a headline.
- Awards on procedures published in the last 24 months: 46 award records on 44 procedures (46 to a single canonical supplier, 0 multi-supplier). 11 values come from the contract record when the award carried none; 28 awards published only a VAT-inclusive amount and are counted but not valued.
- Bid counts, deadline-to-award, amendments and award-vs-estimate come from the nightly buyer analytics row; each figure’s own method and sample is behind its , the long form on Methodology.
- Contract end dates: 31 of 46 published contracts carry a period end; 12 end within 18 months, 8 within 6.
- Never shown: contact details, predicted winners, payment behaviour, or “who to invite”.
Identifiers consolidated into this page (6 historical Find a Tender publication identifiers)
Official notices referenced this authority under these publication identifiers. Alias URLs are not separate pages.
Canonical page id: GB-PPON-PBMW-5596-NRJW