Find a TenderClosedTender notice
Published 19 Aug 2025, 11:51 BST

Official UK procurement notice

Supply of Pumps, Pump Services, Supply and Repair Motors & Gearboxes

Official notice

Authority: SEVERN TRENT WATER LIMITED (Public body)·Consortium: 2 public authorities

Framework agreement10 lotsGoodsCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Framework ceiling (notional)£55,000,000total for 10 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 29 May 2026
Lots 10see the lot list below
Framework period 5 yrsends 1 Jan 2032 · up to 1 Jan 2037 with extensions · starts 1 Jan 2027

What is being bought10 lots · detail below

Published requirement description

Frameworks for the provision of:

  1. End to End Management of Borehole Pumps
  2. Supply of Split Case, End Suction & Vertical Turbine Pumps and Spares
  3. Supply of Multistage & Booster Sets and Spares
  4. Supply of Progressive Cavity Pumps and Spares
  5. Supply of Ram Pumps and Spares
  6. Supply of Motors
  7. Repair of Motors
  8. Supply of Gearboxes
  9. Repair of Gearboxes
  10. Pump Refurbishment & Repair
  • How the procedure runs: Stage 1 - Pre-Qualification & Shortlist Stage 2 - Request for Proposal & Shortlist Stage 3 - Site Visits & Presentations & Shortlist Stage 4 - Negotiations & Shortlist Stage 5 - Best and Final Offer All shortlisting is carried out as per the Procurement Briefing document.

CPV: Centrifugal pumps · Centrifugal pumps and liquid elevators · Electric motors · Gearboxes · Hydraulic power packs · Parts for electrical motors and generators · Parts of centrifugal pumps · Parts of gearing and driving elements · Parts of hydraulic power packs · Parts of pumps or liquid elevators · Parts of reciprocating positive-displacement pumps · Plain gears, gearing and driving elements · +5 more

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Framework period
5 yrs · up to 10 yrs from 1 Jan 2027
Published description of the framework

With or Without Competition

Competitive quotation pricing and lead time

Lots and requirements (10)Procurement structure

10 lots · all with a published value · same evaluation weights on every lot

Every one of these 3 lots carries the same published figure, £1,500,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1End to End Management of Borehole PumpsRenewal 5 yrsPublished value£20,000,000

End to End Management of Borehole Pumps including supply, installation and repair

Contract period: 1 Jan 2027 – 1 Jan 2032 (5 yrs) · up to 1 Jan 2037 with extensionsValue: £20,000,000 exc. VAT · £24,000,000 inc. VAT
Extensions: 5x 1 year option
Lot #2Supply of Split Case, End Suction & Vertical Turbine Pumps and SparesRenewal 5 yrsPublished value£1,000,000

Supply of Split Case, End Suction & Vertical Turbine Pumps and Spares framework

Contract period: 1 Jan 2027 – 1 Jan 2032 (5 yrs) · up to 1 Jan 2037 with extensionsValue: £1,000,000 exc. VAT · £1,200,000 inc. VAT
Extensions: 5x 1 year option
Lot #3Supply of Multistage Pumps & Booster Sets and SparesRenewal 5 yrsceiling above

Supply of Multistage Pumps & Booster Sets and Spares Framework

Contract period: 1 Jan 2027 – 1 Jan 2032 (5 yrs) · up to 1 Jan 2037 with extensions
Extensions: 5x 1 year options
Lot #4Supply of Progressive Cavity Pumps and SparesRenewal 5 yrsPublished value£18,000,000

Supply of Progressive Cavity Pumps and Spares framework

Contract period: 1 Jan 2027 – 1 Jan 2032 (5 yrs) · up to 1 Jan 2037 with extensionsValue: £18,000,000 exc. VAT · £21,600,000 inc. VAT
Extensions: 5x 1 year option
Lot #5Supply of Ram Pumps & SparesRenewal 5 yrsPublished value£2,000,000

Supply of Ram Pumps & Spares Framework

Contract period: 1 Jan 2027 – 1 Jan 2032 (5 yrs) · up to 1 Jan 2037 with extensionsValue: £2,000,000 exc. VAT · £2,400,000 inc. VAT
Extensions: 5x 1 year extension
Lot #6Supply of MotorsRenewal 3 yrsPublished value£3,500,000

Supply of Motors framework

Contract period: 1 Jan 2027 – 1 Jan 2030 (3 yrs) · up to 1 Jan 2037 with extensionsValue: £3,500,000 exc. VAT · £4,200,000 inc. VAT
Extensions: 7x 1 year options
Lot #7Repair of MotorsRenewal 3 yrsSMEPublished value£3,500,000

Repair of Motors Framework

Contract period: 1 Jan 2027 – 1 Jan 2030 (3 yrs) · up to 1 Jan 2037 with extensionsValue: £3,500,000 exc. VAT · £4,200,000 inc. VAT
Extensions: 7x 1 year options
Lot #8Supply of GearboxesRenewal 3 yrsceiling above

Supply of Industrial Gearboxes Framework

Contract period: 1 Jan 2027 – 1 Jan 2030 (3 yrs) · up to 1 Jan 2037 with extensions
Extensions: 7x 1 year options
Lot #9Repair of GearboxesRenewal 3 yrsSMEceiling above

Repair of Industrial Gearboxes framework

Contract period: 1 Jan 2027 – 1 Jan 2030 (3 yrs) · up to 1 Jan 2037 with extensions
Extensions: 7x 1 year options
Lot #10Pump Refurbishment & RepairRenewal 3 yrsSMEPublished value£7,500,000

Pump Refurbishment & Repair Framework

Contract period: 1 Jan 2027 – 1 Jan 2030 (3 yrs) · up to 1 Jan 2037 with extensionsValue: £7,500,000 exc. VAT · £9,000,000 inc. VAT
Extensions: 7x 1 year option

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 10 lots
Quality: 40%Price: 40%Environmental: 20%
Published sub-criteria (3)
  • Quality/Technical: 40%
  • Commercial: 40%
  • Sustainability: 20%
Published award criteria (3)
  • Sustainability
  • Quality/Technical
  • Commercial
What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
  • “Supply of Pumps, Pump Services, Supply and Repair Motors & Gearboxes” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
19 Aug 2025, 11:51 BST
Last source update
14 Apr 2026, 15:31 BST
Award evaluation window
Submission end – 1 Nov 2026
FTS notice number
2026/S 000-033864
Latest notice
Tender notice (UK4)
Classification (CPV)
Centrifugal pumpsCentrifugal pumps and liquid elevatorsElectric motorsGearboxesHydraulic power packsParts for electrical motors and generatorsParts of centrifugal pumpsParts of gearing and driving elementsParts of hydraulic power packsParts of pumps or liquid elevators
+7 moreParts of reciprocating positive-displacement pumpsPlain gears, gearing and driving elements
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+2 moreSouth West (UKK)Wales (UKL)
Official registry OCID
ocds-h6vhtk-058a69 Find a Tender
How it runs

Stage 1 - Pre-Qualification & Shortlist

Stage 2 - Request for Proposal & Shortlist

Stage 3 - Site Visits & Presentations & Shortlist

Stage 4 - Negotiations & Shortlist

Stage 5 - Best and Final Offer

All shortlisting is carried out as per the Procurement Briefing document.

How it was run

Official notice
Run through: SAP Ariba · Who buys & how to bid on SAP Ariba
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free buyer-specific invitations
Requests to participate (first stage)
29 May 2026, 15:00 BST
Appointment period ends
29 May 2026, 15:00 BST
Clarification deadline
8 May 2026, 17:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

19 Aug 2025 → 1 Jan 2027 · 7 dates
  1. Planning notice published
    19 Aug 2025, 11:51 BST
  2. Next notice expected265 days ago
    1 Feb 2026, 23:59 GMT
  3. Tender notice published194 days ago
    14 Apr 2026, 15:31 BST
  4. Clarification questions by170 days ago
    8 May 2026, 17:00 BST
  5. Admission / appointment period ends149 days ago · period end, not a bid countdown
    29 May 2026, 15:00 BST
  6. Today
    25 Oct 2026
  7. Award decision expected byin 8 days
    1 Nov 2026, 23:59 GMT
  8. Contract startsin 68 days
    1 Jan 2027

Notice history

5 events · 3 releases on Find a Tender · since 19 Aug 2025
  1. Planned procurement notice published
    19 Aug 2025, 11:51 BST
    UK3
  2. Planned procurement notice published
    2 Jan 2026, 09:58 GMT
    UK3
  3. Tender notice published
    14 Apr 2026, 15:31 BST
    UK4
  4. Published value updated
    14 Apr 2026, 15:31 BST
  5. Status changed to active
    14 Apr 2026, 15:31 BST
Published amendments (1)

Updated timeline

Contracting authority & participating public bodies

2 public bodies on the notice

SEVERN TRENT WATER LIMITED

Contracting authorityPrivate utility GB-COH: 02366686 · GB-PPON: PQQN-5222-QDXR Severn Trent Centre, Coventry, West Midlands, CV1 2LZContact name, email

Consortium members and other public bodies

  • HAFREN DYFRDWY CYFYNGEDIGContracting authorityPrivate utilityWelsh devolved regulations applyGB-COH: 03527628GB-PPON: PWGQ-2543-XWCR Wrexham, WalesContact name, email

Official documents & specifications (3)

Official links; attachments are not copied

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Planned procurement notice planningPlanned procurement noticeUK3Planned procurement notice on Find a Tender
  • Planned procurement notice planningPlanned procurement noticeUK3Planned procurement notice on Find a Tender