Solar PV at Grange Leisure and Community Centre
Authority: Stratton St Margaret Parish Council (Local council)
What is being bought
Published requirement descriptionWe are delighted to extend this invitation to tender for the design and installation of a roof mounted Solar PV system at Grange Leisure and Community Centre in Swindon. The proposed project seeks to optimise the existing roof space, providing opportunity for electricity generation as part of our continued efforts to reduce our carbon footprint.
We invite experienced firms with a proven track record in Solar PV design and installation to participate in this tender process. Your expertise and knowledge will play a fundamental role in the success of this major investment.
We look forward to receiving your proposals and collaborating on this project.
Who are we?
The Parkwood Group of companies are leading providers of support services to public and private sector clients. The Group employs over 4,500 people throughout the UK providing services which include leisure management, green space management, healthcare, consultancy, and management of PFI projects.
Timescales
Milestone Date
Tender issue 13/10/2025
Tender deadline 14/11/2025
Tender review 17/11/2025 - 28/11/2025
Tender clarifications 28/11/2025 - 12/12/2025
Tender award 08/01/2026
Detailed design phase TBC
Proposed construction start TBC
Contact information
If you have any questions with regards to this tender, or would like to arrange a site visit, please contact Lee Wiseman, the site manager via email - [email protected] and Joel Kirby, Parkwood Leisure Energy and Sustainability Manager - [email protected]
1.0 - Scope of works
1.1 - Existing site Information
The solar PV system shall generate electricity from sunlight using photovoltaic panels. The system shall consist of solar panels, mounting structures, inverters, electrical wiring, and associated components.
Address: Grange Leisure and Community Centre, Grange Dr, Swindon SN3 4JY
The roof shown in red should be considered as part of this tender return. Structural assessment should be carried out to assess additional loads and should be considered as part of the tender return.
Category Consideration Requirement
Statutory consents Permitted development Required. Subject to prior approval. This will be submitted by the successful tenderer.
Planning permission Subject to prior approval. This will be submitted by the successful tenderer.
Listed building consent Not required.
Conservation area No.
DNO G99 application must be submitted by the successful tenderer. Any follow-up permissions, such as G100 and continued liaison with the DNO is the responsibility of the successful tenderer. This includes witness testing which is to be performed at no impact to the operation of the facility.
Building regulations Contractor must conform to all relevant building regulations.
Environment Solar shading analysis Required.
Glare analysis Not required.
*subject to prior approval conditions.
Roof compatibility Orientation Options available.
Structural assessment Required.
Roof defects / condition Not to our knowledge.
Materials Mix, to be confirmed on the site visit.
Age
Warranty No.
Access Scaffold
Budget Budget Constraints The project budget is £50,000+VAT. This should be considered within tender returns.
Electrical infrastructure
The contractor must ensure that the mains distribution has sufficient capacity to handle the additional load and that the wiring and components are in good condition. It may be necessary to upgrade or make adjustments to the electrical infrastructure during the installation process.
Comments: To be reviewed during site visits.
Document checklist
Provided by the client
Document Appendix
Building plans - showing plant / switch room location Site visit required.
Roof plan Appendix 1
Roof surface O&M Site visit required.
Electricity consumption data Appendix 4
Electrical schematics incl. metering strategy N
Photographs of roof areas and switch rooms Appendix 3
Asbestos report Appendix 2
Compartmentation plans To be confirmed
Fire Safety RC62 Checklist Appendix 5
Project outcomes
Provided by the client
Energy goals Comments (Y/N)
Offset a certain percentage of energy consumption The scheme should be suited to the roof size, building load as designed by the contractor and budget highlighted above.
Completely energy independent No
Contribute to environmental sustainability -
Employer's requirements
Solar panels The manufacturer, type and model of solar panel modules can be selected by the tenderer, subject to approval by PL.
The panels shall meet international standards for performance, durability, and safety.
Mounting structures The mounting structures shall securely support the solar panels on the desired installation location (e.g., ballasted - rooftop).
The structures shall be made of corrosion-resistant materials suitable for outdoor installation.
The design shall take into account wind loads, snow loads, and other environmental considerations specific to the installation location - in accordance with the structural information provided.
Inverters The solar PV system shall include grid-tied inverters capable of converting the DC power generated by the solar panels into AC power for use or export to the grid. The required manufacturer for this scheme is Solis.
The inverters shall have a minimum efficiency of 93 - 96%.
The inverters shall meet relevant international safety standards and have built-in protection mechanisms against overvoltage, overcurrent, and other electrical faults.
Inverters should be located in well-ventilated spaces that do not exceed the optimum / recommended operating temperatures.
Inverters should always be mounted on fire-rated surfaces.
Inverters should be installed as close to the solar array as possible to reduce power losses.
Inverters should be protected from the elements, positioned away from direct sunlight, rain, snow, etc.
Electrical wiring and protection The system shall include appropriate electrical wiring to interconnect the solar panels, inverters, and other components.
The wiring shall be sized correctly to minimise losses and comply with local electrical codes and regulations.
Protection devices, such as surge protectors, circuit breakers, and disconnect switches, shall be installed as per applicable safety standards.
All cabling will be fully supported and secured in cable trays.
All cabling will be labelled accordingly, and be weather-proof when external.
Wiring diagram, providing the routes of cabling (including external cable runs) will be provided as part of the system O&Ms.
Batteries It is not anticipated that there will be a requirement for batteries for this project.
Monitoring and control The solar PV system shall incorporate a monitoring and control system to track system performance, energy production, and potential issues.
The monitoring system shall provide real-time data on energy generation, consumption, and system health through the Solis interface.
Installation and commissioning The solar PV system shall be installed by qualified personnel following industry best practices and local regulations.
A comprehensive commissioning process shall be conducted to ensure the system operates as intended and meets performance specifications.
All necessary permits and approvals shall be obtained before installation and commissioning.
Warranty and maintenance The solar panels, inverters, and other system components shall have a warranty period of:
- Solar PV panels - 20 years
- Solar PV - inverters - 10 years
○ Option for extended warranty required.
- Mounting system - 20 years
The warranty shall cover defects in materials and workmanship and guarantee a minimum performance output over the warranty period.
A recommended maintenance plan shall be provided to ensure optimal performance and longevity of the system.
The contractor shall ensure that there's a nearby water connection to enable cleaning of the solar PV panels.
The contractor shall ensure that there's a nearby electrical connection to enable cleaning the solar PV panels.
Solar panel placement: panels should be accessible to clean and inspect without excessive leaning or specialist equipment.
Inverter placement: technicians should be able to reach the inverters without difficulty for routine inspections, repairs, or replacements if needed. Always follow manufacturers instructions for specified distances between individual inverter units.
The design shall not restrict rainwater run-off from the existing roof structure. Gulleys must be left exposed to enable roof cleaning / maintenance.
The contractor shall provide the employer a collateral warranty of 5 years.
The contractor will provide a comprehensive operational and maintenance manual, detailed drawings, schematics, handover training with the site team and 12-months of soft landing / servicing support (in the event of issues arising in accordance with the collateral warranty) and electrical compliance checks.
Access The contractor will provide all necessary access equipment to safely complete the installation, in accordance with relevant health and safety regulations.
H&S The contractor will comply with the Construction Design Management (CDM) Regulations 2015, adopting the role of Principal Contractor, and where also responsible for design, Principal Designer.
The scheme will be compliant with RC62 and a full RC62 checklist will be completed and submitted as part of the design and handover process. This includes the installation of a fireman's switch and full integration at the fire panel.
A pre and post fire-risk assessment must be completed at design and handover of the scheme.
Contracts The contractor will enter into a JCT Minor Works Contract, or with Contractor's Design elements depending on the package.
Finances Contractor to carry out a detailed financial assessment including upfront cost, available incentives or rebates, potential energy savings, and return on investment.
CPV: Electricity · Power or solar diodes · Solar energy · Solar panel roof-covering work
The lotProcurement structure
single lot · value publishedLot #1RenewalPublished value£50,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Stratton St Margaret Parish Council: All tenders are reviewed and discussed by the Full Council, which comprises 19 Councillors. To ensure a fair and transparent process, all identifying details such as company names and logos are removed before consideration. Councillors assess each tender based on a range of factors, including: Public spend and overall value for money Design and build quality Technical capability and relevant experience Delivery timescales and ability to meet project requirements Compliance with the specification Sustainability and environmental impact Health and safety standards Social value and community benefit Aftercare, maintenance, and long-term support
Procedure terms & legal framework
From the official record- Procedure method
- Below threshold - open competition
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Closed
- Procurement threshold
- Below threshold
- Regulatory regime
- Concession
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 13 Oct 2025, 12:16 BST
- Last source update
- 13 Oct 2025, 12:16 BST
- FTS notice number
2025/S 000-064703- Latest notice
- Tender notice (UK4)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-05ae27Find a Tender
- Reserved participation area
- K02000001
How it was run
Official notice- Submission deadline
- 14 Nov 2025, 23:59 GMT
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
www.strattonstmargaret.gov.uk/tenders/ ↗
Submission by email to [email protected] / [email protected]
Timeline
13 Oct 2025 → 1 Feb 2026 · 3 dates- Tender notice published374 days ago13 Oct 2025, 12:16 BST
- Submission deadline342 days ago14 Nov 2025, 23:59 GMT
- Contract starts264 days ago1 Feb 2026
Notice history
1 event · 1 release on Find a Tender- Tender notice published13 Oct 2025, 12:16 BSTUK4
Contracting authority & participating public bodies
Official documents & specifications (8)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specifications A link to all tender documents
- Bidding documents and specifications Grange - Solar PV Specification
- Bidding documents and specifications Grange Site Plan
- Bidding documents and specifications Site HDD
- Bidding documents and specifications Site Photos
- Bidding documents and specifications Appendix 5- RC62 Checklist - Fire Safety Standard For Solar Panels
- Bidding documents and specifications Asbestos Survey
Notices published for this procedure
- Tender notice Tender notice on Find a Tender