Find a TenderOpen admission Tender notice
Published 16 Sept 2026, 15:54 BST

Official UK procurement notice

Rail Replacement Service - Bus and Coach Operators- Release 2

Authority: Transport for Wales Rail Limited (Utility Buyer) (Public body)·Consortium: 2 public authorities

Open framework scheme3 lotsServicesCompetitive flexible procedureAbove thresholdUtilitiesSME suitableVCSE suitable
Framework ceiling (notional)£81,008,616envelope for 3 lots · framework ceiling, not attributable revenue · 1 value update
Open framework scheme until 27 Oct 202612:00 GMT · period end, not a bid countdown
Clarification cut-off 22 Oct 202623:59 BST · questions to the authority
Framework period 7 yrs 8 moends 23 Jul 2034 · starts 7 Dec 2026

What is being bought3 lots · detail below

Published requirement description

Transport for Wales Rail (TfWRL) are in-housing the co-ordination and management of Rail Replacement Service (RRS) across Wales and Border routes operated by TfWRL within Wales and between Wales and England. Or any such route operated by TfW as may arise in future.

This means that all pre-planned and emergency rail replacement services currently provided by coach and bus operators through an aggregator agreement, will be contracted for as services, directly by TfWRL.

This procurement also includes the requirement for adhoc travel services to be commissioned via this framework as they arise.

Based upon 25/26 Financial year data, approximately 6,000 emergency duties and 21,000 planned duties were delivered by circa 110 different operators.

It is currently intended the Open Framework will run for the maximum 8 year term.

This procurement relates to the second opening of the Rail Replacement Services Open Framework and provides an opportunity for additional operators to apply for the framework and current operators to update their submissions. Full information of how to do so is included in the ITT pack.

  • The authority expects to re-tender this requirement around 5 Jul 2027, 23:59 BST.
  • How the procedure runs: Refer to ITT Volume 1 for full details. Single Stage Procurement. Step 1 - Participation Stage - not used for down selection. All Tenderers must pass this stage to be appointed to the Framework. Step 2 - Technical responses will be evaluated and the Commercial responses will be checked for accuracy/errors or omissions. Step 3 - Dialogue - the Authority reserves the right to hold a dialogue stage with some or all operators if needed to clarify any complex queries arising. Any changes to the specification or Terms and Conditions would be communicated to all bidders. This is to ensure any unforeseen issues arising can be dealt with effectively and supports the assurance process that the Authority requirement is understood and the Tenderer offer and ability to provide the service is consistent with the requirement. Step 4 - Notify Bidders if they are successful in being appointed to the framework and provide assessment summaries. Step 5 - Calling off under the framework - the quality scores and commercial rate card will be imported into a separate 'end to end' system within which duties are calculated and the ranked order of bidders determined in accordance with the award methodology (price/quality weighting) described in the ITT). Each duty/blockade is effectively an individual competition. As this is the second release of the Open Framework, operators already assigned to the framework are still required to respond. Full details of how to do so are included in the ITT pack.

CPV: Hire of passenger transport vehicles with driver · Non-scheduled passenger transport · Public road transport services · Special-purpose road passenger-transport services

How this framework works

From the published notice
Type
Closed framework · open framework scheme (admission reopens)
Call-offs
call-offs may be awarded directly or by further competition
Framework period
7 yrs 8 mo from 7 Dec 2026
Scheme runs until
31 Oct 2034
Supplier levy on call-offs (max %)
All associated tender documents are available free of charge by registering on the named e-procurement portal.
Published description of the framework

Operators will be required to pass all of the first stage selection questions to be appointed to the framework.

The operators technical and commercial submissions for Lot 1 and Lot 2 shall be imported into the end to end system on a weighted basis and used to determine the ranked order for calling off under the Framework taking into account relevant information regarding the location and delivery of the services where appropriate.

Lot 1 - Emergency - For each duty or group of duties, Operators will be contacted by telephone, email or text message to offer the duty. The nature of the emergency will determine how much time Operators have to respond e.g. If a higher ranked operator is contacted and fails to accept the duty within the prescribed timescale, the duty will be offered to the next highest ranked operator. Operators may also be contacted simultaneously and the duty offered to the first to respond regardless of ranked position.

Lot 2 - Pre-Planned - For each duty or group of duties, Operators will be requested to submit an Expression of Interest (EOI) within a prescribed timeframe. Upon receipt of the EOI, the duty will be offered in line with the ranked order.

Lot 3 - Mini Competition - All Operators appointed to Lot 2, will automatically be invited to mini competitions under Lot 3. The quality scores for the technical questions at the time the framework was established will be carried forward and added to the price score on a weighted basis to create the combined ranking. The duty/blockade will be offered to the highest ranked operator.

In all cases, duties/blockades will only be offered to operators with the vehicle and disc capacity.

Full details of the process are explained in the ITT pack.

Lots and requirements (3)Procurement structure

3 lots · all with a published value · same conditions of participation on every lot
Lot #1Part 1 Lot 1: Emergency (up to 48 hours) 7 yrs 8 moSMEVCSEPublished value£28,353,016

Duties to be offered with up to 48 Hours Notice.

Contract period: 7 Dec 2026 – 23 Jul 2034 (7 yrs 8 mo)Value: £28,353,016 exc. VAT · £34,023,619 inc. VAT
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As described in the ITT pack.

  • Technical & professional ability

    As described in the ITT pack.

Who is likely to bid for this lot ↓

Lot #2Parts 2 & 3 Lot 2: Pre-Planned 7 yrs 8 moSMEVCSEPublished value£40,504,308

Part 2 Lot 2: Pre-Planned (48 hours to 14 days)

Part 3 Lot 2: Pre-Planned (over 14 days)

Contract period: 7 Dec 2026 – 23 Jul 2034 (7 yrs 8 mo)Value: £40,504,308 exc. VAT · £48,605,170 inc. VAT
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As described in the ITT pack.

  • Technical & professional ability

    As described in the ITT pack.

Who is likely to bid for this lot ↓

Lot #3Part 4 Lot 3: Mini-Competition (over 14 days) 7 yrs 8 moSMEVCSEPublished value£12,151,292

Larger groups of duties/blockades over a longer period of time. Each variable, dependant upon the specific need for rail replacement services at the time.

Contract period: 7 Dec 2026 – 23 Jul 2034 (7 yrs 8 mo)Value: £12,151,292 exc. VAT · £14,581,551 inc. VAT
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    As described in the ITT pack.

  • Technical & professional ability

    As described in the ITT pack.

Who is likely to bid for this lot ↓

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids are scored
Lot distribution rule: Operators may apply to be entered into each of the three lots within the framework. Each lot will include an unlimited number of suppliers who meet the criteria for entry into that lot, as set out in the procurement documentation.
Conditions of participation · identical on every lot2
  • Economic & financial standing

    As described in the ITT pack.

  • Technical & professional ability

    As described in the ITT pack.

What this means for your bid
  • “Rail Replacement Service - Bus and Coach Operators- Release 2” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Competition analysis · published record, not a forecast of who will bid

How Transport for Wales Rail Limited (Utility Buyer) buys Public road transport services (CPV 6011), and who usually turns up

Transport for Wales Rail Limited (Utility Buyer)’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Public road transport services (CPV 6011) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bidWhat to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: no supplier sizes published · market: CPV 6011 · UK-wide, n=11
—91%

No supplier sizes published for this authority.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means the winner is registered in the region where that contract was delivered.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: no winner locations published · market: CPV 6011 · UK-wide, n=13
—85%

No winner locations published for this authority. Local means a registered address in North East England.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 19 decided notices · market: division 60 · North East England, n=6
62 days52 days

Half of these awards were announced within 62 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: no awards on record · market: division 60 · North East England, n=16
—13%

No awards recorded for this authority in this market.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer4 lots with bid counts · all categories · too few to chart
The market10 lots with bid counts · CPV 6011 · UK-wide
10% had one bid
Market · select a colour for counts
1 bid10%
Market: 1 of 10 lots with published bid counts.
2–360%
Market: 6 of 10 lots with published bid counts.
4–620%
Market: 2 of 10 lots with published bid counts.
7+10%
Market: 1 of 10 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1Part 1 Lot 1: Emergency (up to 48 hours)CPV 6011200092 monthsSME suitablePublished estimate£28m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.

A forecast, not a list of bidders.

12expected bids0% single-bid risk
forecast from 1 past contest
Forecast chances for this lot
1 bid0%
Chance this lot gets 1 bid: 0%. This is a forecast.
2–33%
Chance this lot gets 2–3: 3%. This is a forecast.
4–66%
Chance this lot gets 4–6: 6%. This is a forecast.
7+90%
Chance this lot gets 7+: 90%. This is a forecast.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

SupplierThis buyer’s earlier contractLotAward valueMatch
lloyds coachesEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
Stagecoach Service LtdEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
PEYTON TRAVEL LIMITEDEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
Edwards Coaches LtdEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
CYMRU COACHES LIMITEDEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

SupplierWon in this categoryLive contractsAward vs estimate
16 wins in North East England1 panel places
£8.3m103 awards in 36m · last 2 months ago34 live · £4.0m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

18% above n=17
5 wins in North East England3 panel places
£13m38 awards in 36m · last 2 months ago2 live · £13m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
10 wins in North East England
£14m33 awards in 36m · last 4 months ago13 live · £11m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=24
12 wins in North East England3 panel places
£11m43 awards in 36m · last 5 months ago8 live · £1.5m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=4
11 wins in North East England1 panel places
£5.4m23 awards in 36m · last 4 months ago6 live · £4.1m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=9
Lot #2Parts 2 & 3 Lot 2: Pre-PlannedCPV 6011200092 monthsSME suitablePublished estimate£41m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.

A forecast, not a list of bidders.

12expected bids0% single-bid risk
forecast from 1 past contest
Forecast chances for this lot
1 bid0%
Chance this lot gets 1 bid: 0%. This is a forecast.
2–34%
Chance this lot gets 2–3: 4%. This is a forecast.
4–66%
Chance this lot gets 4–6: 6%. This is a forecast.
7+90%
Chance this lot gets 7+: 90%. This is a forecast.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

SupplierThis buyer’s earlier contractLotAward valueMatch
lloyds coachesEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
Stagecoach Service LtdEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
PEYTON TRAVEL LIMITEDEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
Edwards Coaches LtdEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
CYMRU COACHES LIMITEDEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

SupplierWon in this categoryLive contractsAward vs estimate
16 wins in North East England1 panel places
£8.3m103 awards in 36m · last 2 months ago34 live · £4.0m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

18% above n=17
5 wins in North East England3 panel places
£13m38 awards in 36m · last 2 months ago2 live · £13m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
10 wins in North East England
£14m33 awards in 36m · last 4 months ago13 live · £11m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=24
12 wins in North East England3 panel places
£11m43 awards in 36m · last 5 months ago8 live · £1.5m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=4
11 wins in North East England1 panel places
£5.4m23 awards in 36m · last 4 months ago6 live · £4.1m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=9
Lot #3Part 4 Lot 3: Mini-Competition (over 14 days)CPV 6011200092 monthsSME suitablePublished estimate£12m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.

A forecast, not a list of bidders.

12expected bids0% single-bid risk
forecast from 1 past contest
Forecast chances for this lot
1 bid0%
Chance this lot gets 1 bid: 0%. This is a forecast.
2–34%
Chance this lot gets 2–3: 4%. This is a forecast.
4–67%
Chance this lot gets 4–6: 7%. This is a forecast.
7+88%
Chance this lot gets 7+: 88%. This is a forecast.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

SupplierThis buyer’s earlier contractLotAward valueMatch
lloyds coachesEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
Stagecoach Service LtdEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
PEYTON TRAVEL LIMITEDEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
Edwards Coaches LtdEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match
CYMRU COACHES LIMITEDEarlier contractRail Replacement Service - Bus and Coach Operatorsstarted Aug 2026Rail Replacement Service - Bus and Coach Operators (Lot 2)—79% match

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

SupplierWon in this categoryLive contractsAward vs estimate
16 wins in North East England1 panel places
£8.3m103 awards in 36m · last 2 months ago34 live · £4.0m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

18% above n=17
5 wins in North East England3 panel places
£13m38 awards in 36m · last 2 months ago2 live · £13m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

no comparable pairs
10 wins in North East England
£14m33 awards in 36m · last 4 months ago13 live · £11m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=24
4 wins in North East England
£8.7m20 awards in 36m · last 4 months ago15 live · £8.3m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

8% above n=1
11 wins in North East England1 panel places
£5.4m23 awards in 36m · last 4 months ago6 live · £4.1m
i

Public contracts this supplier still holds.

Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book.

Unexpired says nothing about spare capacity.

at estimate n=9
About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the match score are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

What this replaces
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

86% title match.

A past supplier may not bid again.

The prior contract this notice most likely re-tenders · matched by title and category (86% title match), the holder is not guaranteed to re-bid

Rail Replacement Service - Bus and Coach Operators, winner not published; no contract end date published.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Open admission
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Open framework scheme
Who may use the vehicle
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA, CPTPP)
Recurring procurement
Yes · next expected 5 Jul 2027
First published
16 Sept 2026, 15:54 BST
Last source update
2 Oct 2026, 15:14 BST
Award evaluation window
Submission end – 7 Dec 2026
Authority reference
TfW0993.02
FTS notice number
2026/S 000-093451
Latest notice
Tender notice (UK4)
Classification (CPV)
Hire of passenger transport vehicles with driverNon-scheduled passenger transportPublic road transport servicesSpecial-purpose road passenger-transport services
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+2 moreSouth West (UKK)Wales (UKL)
Official registry OCID
ocds-h6vhtk-0773c0 Find a Tender
Contract terms summary

30 Days for traditional PO invoice payment and 14 days if automated billing processes are adopted.

How it runs

Refer to ITT Volume 1 for full details.

Single Stage Procurement.

Step 1 - Participation Stage - not used for down selection. All Tenderers must pass this stage to be appointed to the Framework.

Step 2 - Technical responses will be evaluated and the Commercial responses will be checked for accuracy/errors or omissions.

Step 3 - Dialogue - the Authority reserves the right to hold a dialogue stage with some or all operators if needed to clarify any complex queries arising. Any changes to the specification or Terms and Conditions would be communicated to all bidders. This is to ensure any unforeseen issues arising can be dealt with effectively and supports the assurance process that the Authority requirement is understood and the Tenderer offer and ability to provide the service is consistent with the requirement.

Step 4 - Notify Bidders if they are successful in being appointed to the framework and provide assessment summaries.

Step 5 - Calling off under the framework - the quality scores and commercial rate card will be imported into a separate 'end to end' system within which duties are calculated and the ranked order of bidders determined in accordance with the award methodology (price/quality weighting) described in the ITT). Each duty/blockade is effectively an individual competition.

As this is the second release of the Open Framework, operators already assigned to the framework are still required to respond. Full details of how to do so are included in the ITT pack.

Related procedures1
Review and risk notes
Risks

Examples of known risks at the framework level include:

Refinements of specification for service or vehicle provision e.g., Electric Vehicles.

Changes in legislation which may increase operator costs due to additional investment in technology or other requirements for the delivery of the services.

Changes in fuel rates, NI, minimum or living wage or other material costs of provision of the services.

Examples of known/unknown risks at the call off level include:

Amendment to call off contracts (duties awarded) including extension and curtailment of duties or full termination of duties due to the nature of the industry and respective need to deliver a resilient rail replacement service when trains are unable to operate.

Late cancellation of duties

How to participate & submission route

Official notice Apply via portal
Submission portal named on this notice: portal not identified
Electronic submission allowedLanguage: EN, CY
Requests to participate (first stage)
—
Appointment period ends
27 Oct 2026, 12:00 GMT
Clarification deadline
22 Oct 2026, 23:59 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en, cy
Supplier levy on call-offs (max %)

call-off levy · All associated tender documents are available free of charge by registering on the named e-procurement portal.

Detailed submission instructions & authority contactsFrom official release

Timeline

16 Sept 2026 → 7 Dec 2026 · 8 dates
  1. Planning notice published29 days ago
    16 Sept 2026, 15:54 BST
  2. Market engagement16 days ago
    28 Sept 2026, 23:59 BST

    Following the successful launch of the initial open framework earlier in 2026, TfWRL is seeking to engage with potential new suppliers ahead of the second opening of the framework.

    TfWRL invites bus, coach and minibus operators to attend a market engagement webinar to learn more about:

    *The Rail Replacement Services framework and upcoming Release 2 opportunity.

    *How the Open Framework operates and the benefits of participation.

    *Opportunities for new operators to join the framework.

    *The anticipated procurement timetable.

    *Tender support available to suppliers.

    *Questions and answers with the TfWRL project team.

    The indicative timetable is:

    *Market Engagement Webinar for operators already appointed to the framework: 25/09/26.

    *Market Engagement Webinar for new operators interested in learning more about this opportunity: 28/09/26.

    *Tender Publication: Late September 2026

    *Tender Closing Date: Late October 2026

    *Evaluation and Award: Early December 2026

    The dates provided are indicative and may be amended at the Authority's discretion.

    In order to register your interest for the Market Engagement Webinar for new operators on 28th September, please contact [email protected] with Rail Replacement Webinar in the subject of your email.

    The previous UK2 unique identifying reference for the initial establishment of the open framework was: ocds-h6vhtk-060348

  3. Next notice expected15 days ago
    29 Sept 2026, 23:59 BST
  4. Tender notice published13 days ago
    2 Oct 2026, 15:14 BST
  5. Today
    15 Oct 2026
  6. Clarification questions byin 8 days
    22 Oct 2026, 23:59 BST
  7. Admission / appointment period endsin 12 days · period end, not a bid countdown
    27 Oct 2026, 12:00 GMT
  8. Contract startsin 53 days
    7 Dec 2026
  9. Award decision expected byin 54 days
    7 Dec 2026, 23:59 GMT

Notice history

8 events · 5 releases on Find a Tender · since 16 Sept 2026
  1. Preliminary market engagement notice published
    16 Sept 2026, 15:54 BST
    UK2
  2. Preliminary market engagement notice published
    21 Sept 2026, 11:54 BST
    UK2
  3. Preliminary market engagement notice published
    23 Sept 2026, 08:59 BST
    UK2
  4. Tender notice published
    2 Oct 2026, 15:14 BST
    UK4
  5. Published value updated to £81,008,616
    2 Oct 2026, 15:14 BST
    was £71,576,858
  6. Status changed to active
    2 Oct 2026, 15:14 BST
  7. Procurement method changed
    2 Oct 2026, 15:14 BST
  8. Deadline published: 27 Oct 2026, 12:00 GMT
    2 Oct 2026, 15:14 BST
Routine re-releases (5)
  • 2026-09: 2 releases · 16 Sept 2026, 21 Sept 2026

Commercial outcome & contract awards

Nothing awarded yet
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

2 public bodies on the notice

Transport for Wales Rail Limited (Utility Buyer)

Contracting authorityPublic undertakingWelsh devolved regulations apply GB-PPON: PVJP-5451-JYWQ 3 Llys Cadwyn, Pontypridd, Wales, CF37 4THContact name, email, phone

Consortium members and other public bodies

  • Transport for WalesContracting authorityPublic undertakingWelsh devolved regulations applyGB-PPON: PPHD-4211-XYXJ Pontypridd, WalesContact name, email, phone

Official documents & specifications (7)

Official links; attachments are not copied

Tender pack and attachments

  • Technical specifications tenderTechnical specificationsAs described in the ITT pack.
  • Bidding documents and specifications tenderBidding documents and specificationsAll documents will be released at the same time the tender notice is published. If additional documents are identified as being needed, these will be made available via the nominated e-procurement portal - Atamis.

Notices published for this procedure