Find a TenderAwarded
Published 7 Oct 2022, 17:18 BST

Official UK procurement notice

NHMF Frameworx Planned Maintenance, Net Zero Carbon and Passive Fire Safety Works Framework Agreements 2022

Official notice

Authority: National Heritage Memorial Fund

Framework agreement12 lotsWorksOpen procedure
Framework ceiling (notional)£850,000,000total for 12 lots · framework ceiling, not attributable revenue
Submissions closed 9 Nov 2022awarded 7 Feb 2023
Lots 12see the lot list below

Re-procurement plannedPlanned Maintenance Framework - NI · tender expected

What is being bought12 lots · detail below

Published requirement description

Each of the Frameworks is broken down into 6 workstreams which are:

Planned Maintenance - External and Communal Works

Planned Maintenance - Internal Works

Planned Maintenance - External, Communal and Internal Works

Cyclical Redecoration and Pre-Decoration Repairs

Net Zero Carbon Works

Passive Fire Safety Works

The Frameworks are national covering England, Wales, Scotland and Northern Ireland with the ability to operate in specific geographical regions.

CPV: Building completion work · Building installation work · Miscellaneous repair and maintenance services · Repair and maintenance services of building installations

How this framework works

From the published notice
Places
up to 30 suppliers · 27 bids received (0.9 per place) · 29 appointed

Lots and requirements (12)Procurement structure

12 lots · all with a published value · same evaluation weights on every lot

Every one of these 6 lots carries the same published figure, £75,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Planned Maintenance External and Communal Works - Direct Award FrameworkCancelledceiling above

All trades Planned Maintenance - External and Communal Works to the structures, fenestration, environmental infrastructure and common parts and facilities which may include cyclical redecoration and pre-decoration repairs to their various dwellings, estates and schemes.

Lot #2Planned Maintenance External and Communal Works - Mini Competition FrameworkCancelledceiling above

All trades Planned Maintenance - External and Communal Works to the structures, fenestration, environmental infrastructure and common parts and facilities, which may include cyclical redecoration and pre-decoration repairs to their various dwellings, estates

Lot #3Planned Maintenance - Internal Works - Direct Award FrameworkCancelledceiling above

All trades Planned Maintenance Works which may include major component renewals (Kitchens, bathrooms, rewires, boilers, central heating etc) to the Internals of dwellings on their estates and schemes.

Lot #4Planned Maintenance - Internal Works - Mini Competition FrameworkCancelledceiling above

All trades Planned Maintenance Works which may include major component renewals (Kitchens, bathrooms, rewires, boilers, central heating etc) to the Internals of dwellings on their estates and schemes.

Lot #5Planned Maintenance - External, Communal and Internal Works - Direct Award FrameworkCancelledceiling above

All trades Planned Maintenance - External and Communal Works to the structures, fenestration, environmental infrastructure and common parts and facilities which may include cyclical redecoration and pre-decoration repairs and Internal Works which may include major component renewals (Kitchens, bathrooms, rewires, boilers, central heating etc) to their various dwellings, estates and schemes.

Lot #6Planned Maintenance - External, Communal and Internal Works - Mini Competition FrameworkCancelledceiling above

All trades Planned Maintenance - External and Communal Works to the structures, fenestration, environmental infrastructure and common parts and facilities which may include cyclical redecoration and pre-decoration repairs and Internal Works which may include major component renewals (Kitchens, bathrooms, rewires, boilers, central heating etc) to their various dwellings, estates and schemes.

Lot #7Cyclical Redecoration and Pre-Decoration Repair Works - Direct Award FrameworkCancelledPublished value£50,000,000

All trades Cyclical Redecoration and Pre-Decoration Repairs Works to their various dwellings, estates and schemes.

Cyclical Redecoration and Pre-decoration Repairs will include:

redecoration of existing decorated surfaces to windows, doors, fascias, rainwater and sanitary pipework, walls, soffits, to external fenestration and common parts including communal rooms, together with redecoration to bin stores, garages, cycle sheds, fencing, railings, screens, gates and the like to boundaries, paths, drives and communal areas, staircases, access decks/balconies ordered in accordance with the provisions of the Contract which have been 'packaged' into a pre-planned programme of works. Cyclical Redecoration shall also include the cleaning as specified of the external surfaces of any PVCu components or products e.g. windows, doors, soffits, fascias, cladding and the like that may be encountered.

Pre-decoration Repairs includes for any installation, construction, repairs, maintenance, renewals, reinstatement or replacement Works or Works of improvement (other than that defined as Cyclical Redecoration) that is ordered in conjunction with Cyclical Redecoration and is required to be undertaken in conjunction with or before the Cyclical Redecoration can be undertaken. The work includes but is not limited to;

  • Overhaul of rainwater goods including renewals;
  • Overhaul of external doors and windows including associated joinery repairs and renewals prior the decoration of external and internal communal area shared hall and stairways etc;
  • Decorations to external elevations including associated joinery and carpentry repairs/renewals;
  • Decoration to internal communal shared areas;
  • Works of renewal, improvement or repair not associated directly with Cyclical Redecoration of the component renewed or repaired; and
  • The provision of appropriate access to external elevations where necessary, to comply with current Health and Safety regulations.
Lot #8Cyclical Redecoration and Pre-Decoration Repair Works - Mini-Competition FrameworkCancelledPublished value£50,000,000

all trades Cyclical Redecoration and Pre-Decoration Repairs Works to their various dwellings, estates and schemes.

Cyclical Redecoration and Pre-decoration Repairs will include:

redecoration of existing decorated surfaces to windows, doors, fascias, rainwater and sanitary pipework, walls, soffits, to external fenestration and common parts including communal rooms, together with redecoration to bin stores, garages, cycle sheds, fencing, railings, screens, gates and the like to boundaries, paths, drives and communal areas, staircases, access decks/balconies ordered in accordance with the provisions of the Contract which have been 'packaged' into a pre-planned programme of works. Cyclical Redecoration shall also include the cleaning as specified of the external surfaces of any PVCu components or products e.g. windows, doors, soffits, fascias, cladding and the like that may be encountered.

Pre-decoration Repairs includes for any installation, construction, repairs, maintenance, renewals, reinstatement or replacement Works or Works of improvement (other than that defined as Cyclical Redecoration) that is ordered in conjunction with Cyclical Redecoration and is required to be undertaken in conjunction with or before the Cyclical Redecoration can be undertaken.

The work includes but is not limited to;

  • Overhaul of rainwater goods including renewals;
  • Overhaul of external doors and windows including associated joinery repairs and renewals prior the decoration of external and internal communal area shared hall and stairways etc;
  • Decorations to external elevations including associated joinery and carpentry repairs/renewals;
  • Decoration to internal communal shared areas;
  • Works of renewal, improvement or repair not associated directly with Cyclical Redecoration of the component renewed or repaired; and
  • The provision of appropriate access to external elevations where necessary, to comply with current Health and Safety regulations.
Lot #9Net Zero Carbon Works - Direct Award FrameworkCancelledPublished value£100,000,000

All trades Net Zero Carbon Works to undertake the installation of Works including associated builders works, any design, installation, construction, repairs, maintenance, renewals, reinstatement or replacement Works or Works of improvement in respect of energy efficiency and sustainability works ordered in accordance with the provisions of the Call-Off Contracts which have been 'packaged' into a pre-planned programme of works.

Net Zero Carbon Works include but are not limited to:

  • Installation of Green Roofs
  • Installation of External Wall Treatments
  • Installation of Internal Wall, Ceiling and Floor Treatments
  • Renewal with Triple Glazed Windows
  • Renewal with Triple Glazed External Doors
  • Upgrading of Draughtproofing
  • Reglazing of Windows with energy saving components
  • Installation of "Sedbuk A" rated gas fired boilers
  • Installation of Biomass boilers
  • Installation of Hydronic underfloor heating
  • Installation of Air source heat pumps
  • Installation of Solar hot water panels and cylinders
  • Installation of electrical power generation systems - Wind turbines and PV panels
  • Installation of energy and sustainability saving plumbing devices
  • Installation of energy and sustainability saving electrical devices
  • Works in association with Net Zero Carbon Works
Lot #10Net Zero Carbon Works - Mini Competition FrameworkCancelledPublished value£100,000,000

All trades Net Zero Carbon Works to undertake the installation of Works including associated builders works, any design, installation, construction, repairs, maintenance, renewals, reinstatement or replacement Works or Works of improvement in respect of energy efficiency and sustainability works ordered in accordance with the provisions of the Call-Off Contracts which have been 'packaged' into a pre-planned programme of works.

Net Zero Carbon Works include but are not limited to:

  • Installation of Green Roofs
  • Installation of External Wall Treatments
  • Installation of Internal Wall, Ceiling and Floor Treatments
  • Renewal with Triple Glazed Windows
  • Renewal with Triple Glazed External Doors
  • Upgrading of Draughtproofing
  • Reglazing of Windows with energy saving components
  • Installation of "Sedbuk A" rated gas fired boilers
  • Installation of Biomass boilers
  • Installation of Hydronic underfloor heating
  • Installation of Air source heat pumps
  • Installation of Solar hot water panels and cylinders
  • Installation of electrical power generation systems - Wind turbines and PV panels
  • Installation of energy and sustainability saving plumbing devices
  • Installation of energy and sustainability saving electrical devices
  • Works in association with Net Zero Carbon Works
Lot #11Passive Fire Safety Works - Direct Award FrameworkCancelledPublished value£50,000,000

All trades Passive Fire Safety Works ordered in accordance with the provisions of the Call-Off Contracts which have been 'packaged' into a pre-planned programme of works.

Passive Fire Safety Works include but are not limited to:

  • Installation of Internal Wall Treatments;
  • Installation of Fire Resistant Partitions;
  • Installation of Ceiling Fire Protection Treatments;
  • Installation of Fire Barriers, Pipe, Duct and Conduit Sleeves;
  • Installation of Firestopping;
  • Renewal with fire check doors;
  • Renewal with fire escape windows;
  • Application of fire upgrading coatings to surfaces;
  • Application of fire retardant coatings to surfaces;
  • Works in association with Fire Safety Works
Lot #12Passive Fire Safety Works - Mini Competition FrameworkCancelledPublished value£50,000,000

All trades Passive Fire Safety Works ordered in accordance with the provisions of the Call-Off Contracts which have been 'packaged' into a pre-planned programme of works.

Passive Fire Safety Works include but are not limited to:

  • Installation of Internal Wall Treatments;
  • Installation of Fire Resistant Partitions;
  • Installation of Ceiling Fire Protection Treatments;
  • Installation of Fire Barriers, Pipe, Duct and Conduit Sleeves;
  • Installation of Firestopping;
  • Renewal with fire check doors;
  • Renewal with fire escape windows;
  • Application of fire upgrading coatings to surfaces;
  • Application of fire retardant coatings to surfaces;
  • Works in association with Fire Safety Works

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 12 lots
Quality: 560Price: 400Social value: 40
Published sub-criteria (3)
  • Method Statement: 560
  • price: 400
  • Social Value: 40
Published award criteria (3)
  • Method Statement: 560
  • Social Value: 40
  • Price: 400
What this means for your bid
  • Price carries 400 of 1000 points: a 10% discount moves about 40 points. The method statement decides this lot, not the discount.
  • “NHMF Frameworx Planned Maintenance, Net Zero Carbon and Passive Fire…” is a framework: the contest is a place on its panel, up to 30 suppliers, not a single contract.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Open procedure
Legal basis
CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
7 Oct 2022, 17:18 BST
Last source update
31 Mar 2023, 14:32 BST
Award evaluation window
9 Nov 2022 – …
FTS notice number
2023/S 000-009497
Classification (CPV)
Building completion workBuilding installation workMiscellaneous repair and maintenance servicesRepair and maintenance services of building installations
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+4 moreSouth West (UKK)Wales (UKL)Scotland (UKM)Northern Ireland (UKN)
Official registry OCID
ocds-h6vhtk-03741f Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment
Review and risk notes
Review procedure

The Contracting Authority will incorporate a minimum 10 calendar day standstill period at the point information on the award of the Contracts is communicated to all Economic Operators.

The standstill period provides time for unsuccessful Economic Operators to challenge the award decision before Framework Agreements are entered into. The Public Contract Regulations 2015 (as amended) provide for aggrieved parties who have been harmed or who are at risk of harm by a breach of the Regulations to take action in the High Court of England and Wales.

After the expiry of the 10 day standstill period, the Contracting Authority will unless prevented by order of the High Court, conclude and enter into the Framework Agreements.

Publisher note: NHMF Frameworx is the trading name of NHMF (NPC) Ltd ("NPC") which has been established by the National Housing Maintenance Forum Ltd to undertake the development of frameworks for its 600 plus social housing provider members (the "Contracting Authority") operating across England, Wales, Scotland and Northern Ireland, who are the subscribers and users of the M3NHF Schedule of Rates for Responsive and Void Property Works, the M3NHF Schedule of Rates for Planned Maintenance and Property Reinvestment and the M3NHF Repairs Ordering Schedule. The members of the NHMF represent more than 80% of the UK's housing stock. NHMF (NPC) Ltd is Contracting Authority under regulation 2 of the Public Contract Regulations 2015 and a central purchasing body under regulation 37 of those Regulations. Other contracting authorities through an Authorising Agreement with NPC may also enter into Call-Off Contracts with framework providers. The Contracting Authority considers that these contracts may be suitable for economic operators that are small or medium enterprises (SMEs), any selection of tenderers will however be based solely on the criteria set out in the procurement documents. NPC is administering this procurement on behalf of its Members (Contracting Authority) The Contracting Authority reserves the right not to award any membership to any framework pursuant to this procurement exercise and/or to abandon this procurement exercise at any time and/or to award membership of a framework for only part of the Works at it's sole discretion The Contracting Authority shall have no liability whatsoever to any applicant or tenderer as a result of its exercise of that discretion. For the avoidance of doubt, all costs incurred by any applicant and/or tenderer before signature of any Call-off Contract shall be incurred entirely ay that applicant/tenderer's risk. No guarantee can be given that any business is generated under any awarded framework agreement or call off contract, nor can any guarantee be given that any framework agreement or call-off contract may be put in place in relation to this procurement. Economic Operators are to note that Call-off Contracts will take into account the priorities of the Contracting Authority and its members relating to economic. Social and environmental well being. All documentation can be downloaded from https://etenders.nhmfframeworx.org.uk This portal is for the downloading of the draft procurement documentation, submission of tenders and communicating requests for and responses to clarifications. All requests for procurement documentation, communications and submission of tenders must be made via the Portal, which can be accessed at https://etenders.nhmfframeworx.org.uk After creating an account on eTenders@NHMF-Frameworx, users will receive an email with a link to activate their account. Once activated and logged in , users will need the following code to register for the procurement documentation: NPC2001 Economic operators may seek clarification where they consider any part of the procurement documentation is unclear. All queries and any clarifications must be communicated using the secure email messaging function within the Portal, but to be received no later than 16:00 on 02.11.2022, this will provide an audit trail of all clarification requests and responses issued. It will not be possible to respond to any queries received after that stipulated date and time. It is the Economic Operators responsibility to regularly monitor communications raised and issued through the Portal. Response to requests for clarification will be communicated by NPC to all Economic Operators through the portal secure email messaging system. When uploading Tender Documentation , Economic Operators must be aware of any speed limitations of their internet connection, system configuration and general web traffic etc., as these may impact on the time taken to complete the transaction. Uploading of submissions must be completed by the deadline closing date and time. DO NOT WAIT until too near the closing time on the return date. The closing deadline for uploading completed tender documentation is the 09.11.2022 at 15.00. Please note that the Portal will not permit tender submissions to be uploaded after the closing deadline. Tenders and supporting documentation must be visible to NPC and their advisers only after the closing deadline. Should Economic Operators have any queries or experience difficulties with the registration or download/upload system they should contact the eTenders@NHMF-Frameworx help desk by email [email protected]

How it was run

Official notice
Run through: portal not identified
Language: EN
Appointment period ends
9 Nov 2022, 15:00 GMT
Submission channel
{"electronicSubmission"}
Accepted languages
en
Bid validity
180 days from the deadline
Bids opened
9 Nov 2022, 15:30 GMT
Detailed submission instructions & authority contactsFrom official release

Timeline

9 Nov 2022 → 31 Mar 2023 · 3 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    9 Nov 2022, 15:00 GMT
  2. Bids opened
    9 Nov 2022, 15:30 GMT
  3. Notice published
    31 Mar 2023, 14:32 BST

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    31 Mar 2023, 14:32 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 29admitted to the panel · see the list ↓
Bids received 27
Contracts signed 20latest 7 Feb 2023

216 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 20 of these contracts carry the same published figure, £100,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5A Net Zero Carbon Works - Direct Award Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active
  • LOT 5B Net Zero Carbon Works - Mini Competition Framework

    Signed
    7 Feb 2023
    Value
    ceiling above
    Status
    active

Bid statistics published by the authority

BidsSMEVCSEValid bid range
27bids———

Contracting authority & participating public bodies

NHMF (NPC) LIMITED

Contracting authorityBody governed by public lawPublic Sector Framework Provider GB-COH: 13915301 23 Commonside East, MITCHAM, London, CR42QAContact name, email Published organisation website ↗

Dispute resolution & review bodies

  • Cabinet OfficeReview contact point London
  • High Court of England and WalesReview body London

Framework contractors & participating bidders

29 commercial parties on the notice
Show 19 more suppliers

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria