EEM0075 - Lift and Mobility LIft Solutions Framework

Official notice

Authority: EFFICIENCY EAST MIDLANDS LIMITED (Public body)

Framework agreement3 lotsServicesOpen procedureAbove thresholdSME suitableVCSE suitable
Framework ceiling (notional)£250,000,000envelope for 3 lots · framework ceiling, not attributable revenue · 1 value update
Submissions closed 9 Jan 2026awarded 30 Mar 2026
Awarded to LIFT AND ENGINEERING SERVICES LIMITED +11 more4 awards
Framework period 4 yrsends 19 Apr 2030 · starts 20 Apr 2026

What is being bought3 lots · detail below

Published requirement description

Efficiency East Midlands Limited (EEM) have conducted this tender exercise to procure a Lifts and Mobility Lift Solutions Framework to replace our existing Frameworks (EEM0075 Lift Installation, Refurbishment, Servicing and Maintenance Works Framework and EEM0050 Stairlifts, Hoists and Disabled Adaptations Framework) which will expire on 18th April 2026.

EEM have done this procurement exercise to establish a Framework of Contractors to undertake Lifts and Mobility Lift Solutions, the Framework will be split into the following Lots:

  • Lot 1 - Lift Installation and Refurbishment
  • Lot 2 - Lift Maintenance and Servicing
  • Lot 3 - Mobility Lift Solutions

Services delivered via this Framework will be to domestic and commercial properties.

Lot 1 has been created to support Members undertake the safe and compliant installation of new bespoke through floor lifts solutions or refurbishment and modernisation works to existing lifts.

Lot 2 has been created to support Members undertake the safe and compliant maintenance & servicing of all types of existing through floor lift solutions. The Framework servicing and maintenance programme will provide assurance to members with existing equipment life expectancy through regular preventative maintenance to enhancing lift reliability and performance whilst reducing running costs and maximising energy efficiency.

Lot 3 has been created to support Members undertake the safe and compliant Mobility Solutions such as supply and installation of stairlifts, hoists and disabled adaptations. Stairlift installations and servicing will cover a varied scope of stairlifts in different heights, seat widths and to suit curved and straight staircases and a range of budgets. This lot will be further divided into geographical sub-lots.

The call-off contract's to be awarded pursuant to the Framework Agreements to be entered at conclusion of the procurement exercise begun by publication of the Contract Notice may extend for a duration of up to five years beyond expiry of the four-year term of the Framework Agreement.

Please note that the total potential framework value stated within this notice is in relation to the full 4-year framework and takes into consideration the lot structure, length of call off contracts and that the EEM membership may grow over the framework lifetime.

Where the contract notice states a maximum of suppliers to be appointed to the Framework, EEM reserves the right to appoint less than the numbers stated.

The Framework is being procured by EEM on behalf of the organisations that have been accepted as authorised users. Authorised users are classed as any current company law

member, any future company law members and any user that has been authorised access to the frameworks and other public procurement tools provided by EEM.

EEM is incorporated as a company limited by guarantee and is owned and governed by a small number of organisations who make up our 'Company Law Members', all of which are Contracting Authorities in their own right. The Framework Agreements being procured by the procurement exercise begun by publication of the Contract Notice will be entered by EEM as the Contracting Authority which will have undertaken and completed that procurement exercise. Any reference in the Contract Notice or tender documents to Contracting Authority is deemed to be and include a reference to EEM.

The organisations entitled to access and use the Framework Agreements to be awarded at conclusion of the procurement exercise begun by publication of the Contract Notice can be found at eem.org.uk/members/ ↗ and as set out below:

Any current EEM Member - being an organisation which is a Company Law Member of EEM at the date of this Contract Notice and being one of the organisations who owns and governs EEM;

Any Future Member of EEM, from time to time Company Law Members and the EEM Board may appoint additional organisations to become Company Law Members.

All Future Members will also be Contracting Authorities in their own right; and

A Framework User - being an organisation who has signed and agreed to the terms of accessing EEM Frameworks and who is authorised to access the frameworks and other public procurement tools provided by EEM.

EEM frameworks may accessed by all publicly funded organisations. Frameworks can be used by any organisation that falls in to one or more of the categories listed below and can be identified through the links provided as users in accordance with the Public Contracts Regulations 2015 or the Procurement Act 2023.

The list of potential framework users below is not exhaustive of all organisations who can utilise EEM services, access will be granted to any publicly funded organisation.

Registered Social Landlords in England and Wales, including but not limited to:

  1. Registered Social Landlords in England and Wales, including but not limited to www.gov.uk/government/publicati… ↗
  2. Local Authorities, including but not limited to England and List of councils in Wales.
  3. National Health Service (NHS) bodies including NHS Trusts, foundation trusts, Integrated Care Boards or Partnerships, GP federations and other health and social care providers within England and Wales.
  4. All emergency services including Police Forces, fire and rescue departments and emergency medical services.
  5. All education establishments including but not limited to, schools maintained by local authorities, academy trusts, colleges, universities and other further education establishments
  6. Registered Charities with a relevant link to the core purpose and services provided by EEM.
  7. Central government departments and their agencies.
  8. All other contracting authorities as defined in the Procurement Act 2023.
  • No preliminary market engagement: n/a

CPV: Bath lifts · Goods lifts · Hoists · Lift-maintenance services · Lifts · Mechanical lifts · Stairlifts

How this framework works

From the published notice
Type
Open framework
Call-offs
call-offs may be awarded directly or by further competition
Places
up to 32 suppliers · 12 bids on the busiest of 3 lots (0.4 per place) · 12 appointed
Framework period
4 yrs from 20 Apr 2026
Buyer regions
UKC, UKD, UKE, UKF, UKG, UKH, UKI, UKJ, UKK, UKL
Supplier levy on call-offs (max %)
1.50% of call-off value
Who may buy through it

Efficiency East Midlands (EEM Ltd) is a not-for-profit procurement consortium set up to drive cost and efficiency savings in the public sector.

Our membership includes organisations providing services to the whole public sector including organisations such as Housing Associations and ALMO's, Local Authorities, NHS Trusts, Education Providers, Emergency Services, Government Agencies and Charities.

EEM also work in collaboration with 3 like-minded procurement consortia - Westworks, South East Consortium and Advantage South West. This means that on behalf of our Members, the Consortiums can utilise each other's Frameworks.

This Framework will be available to all members from other consortia but managed by the EEM Team.

All current and future members of EEM are able to access this Framework. For a full list of current Members please refer to eem.org.uk/membership/members ↗

Published description of the framework

The completed price schedules (Part C) will be used to evaluate and appoint Contractors on to the Framework and will form the basis of the EEM pricing for the commencement of the Framework (Framework Base Rates). All pricing submitted in Part C is deemed to be a ceiling rate, Contractors will be able to discount these rates based on volume and requirements of an individual Call Off Agreement but will not be able to increase rates. The only exception to this is where additional services or requirements are requested that are over above the original Framework specification.

Members do not require separate prelims and Contractors will be asked to provide a cost inclusive of prelims. If separate prelims are required, this will be agreed and priced at the time of call off.

EEM will require a commission fee for the works. This shall be added to the Part C - Price Schedule of Rates post-tender and should NOT be included within the submitted Part C Price Schedule. The Contractors cost for the management and payment of the fee shall be included.

The Framework Base Rates within the Price Framework (Part C) document will be fixed until for the first 12 months following the commencement date for the Framework. The rates shall be negotiated for each additional 12-month period. Negotiations will be based on evidence provided to support increased labour, material and overhead costs. A minimum of 30 days' notice must be provided to EEM before any increases can be applied to the Framework rates.

Contractors will be required to submit a Price Change Request Form, one calendar month before the end of the current fixed priced period. Any proposed price change will apply to all schedules within your pricing schedule. Individual rates cannot but increased disproportionally, particularly where the intention is to correct deliberate low pricing within the original tender.

Any price change requests agreed by EEM will be applied to your pricing schedules andwill form the basis of any award without further competition (direct award) call off and set the ceiling rate for mini competitions for the next 12 months.

Each Call Off Agreement will be awarded on the basis of fixed pricing for an initial agreed period. Thereafter, where the rates are in line with the EEM pricing schedule any changes accepted will be applied to the Call Off Agreement.

Where the Call Off Agreement has been awarded following a mini competition, any requests for a price change must be in line with the terms agreed within the contract.

Call-offs published through it4

Notices that name this framework as their framework in the official record. Many call-offs are never published, so this is a floor, not utilisation.

Lots and requirements (3)Procurement structure

3 lots · all with a published value · same evaluation weights on every lot

Every one of these 2 lots carries the same published figure, £30,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.

Lot #1Lift Installation and RefurbishmentAwarded 4 yrsSMEVCSEPublished value£40,000,000

The source published no individual description for this lot.

Contract period: 20 Apr 2026 – 19 Apr 2030 (4 yrs)Value: £40,000,000 exc. VAT · £40,000,000 inc. VAT
Lot #2Lift Servicing and MaintenanceAwarded 4 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 20 Apr 2026 – 19 Apr 2030 (4 yrs)
Lot #3Mobility Lift SolutionsAwarded 4 yrsSMEVCSEceiling above

The source published no individual description for this lot.

Contract period: 20 Apr 2026 – 19 Apr 2030 (4 yrs)

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 3 lots
Quality: 45%Price: 40%Social value: 15%
Published sub-criteria (3)
  • Presentation: 45%
  • Price: 40%
  • Social Value and Sustainability Assessment: 15%
Published award criteria (3)
  • Presentation: As part of the tender assessment for this Framework, EEM will be inviting bidders to attend a presentation session. The Presentation session will include presenting on a scenario and additional questions. All off the presentation questions and evaluation criteria has been disclosed to bidders within the Part D Tender Assessment document .
  • Social Value and Sustainability Assessment: As part of the tender assessment for all three lots of this Framework, 15% has been allocated to Social Value and Sustainability and bidders will need to pass the Pass/Fail questions and answer the weighted questions in this section.
  • Price: As part of the tender evaluation process, 40% of the overall assessment for each lot will be based on pricing. This will be determined through the completion of Part C - Pricing Schedule. Each lot has its own pricing document . Lot 1 Pricing has 40% allocated to pricing split as follows: Lot 1 Call Out Rates - 19% Lot 1 Scenario a) - 7% Lot 1 Scenario b) - 7% Lot 1 Scenario c) - 7% Lot 2 Pricing has 40% allocated to pricing split as follows: Lot 2 Call Out Rates - 5% Lot 2 Schedule of Rates - 15% Lot 2 Maintenance & Servicing - 15% Lot 2 Supplementary Test - 5% Lot 3 Pricing has 40% allocated to pricing split as follows: Installation - 8% Service and Maintenance - 8% Repairs - 8% Scenario - 12% Labour Rates and Call Out - 4%
What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
  • “EEM0075 - Lift and Mobility LIft Solutions Framework” is a framework: the contest is a place on its panel, up to 32 suppliers, not a single contract: call-offs may be direct or by further competition.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use the vehicle
Efficiency East Midlands (EEM Ltd) is a not-for-profit procurement consortium set up to drive cost and efficiency savings in the public sector. Our membership includes organisations providing services to the whole public sector including organisations such as Housing Associations and ALMO's, Local Authorities, NHS Trusts, Education Providers, Emergency Services, Government Agencies and Charities. EEM also work in collaboration with 3 like-minded procurement consortia - Westworks, South East Consortium and Advantage South West. This means that on behalf of our Members, the Consortiums can utilise each other's Frameworks. This Framework will be available to all members from other consortia but managed by the EEM Team. All current and future members of EEM are able to access this Framework. For a full list of current Members please refer to https://eem.org.uk/membership/members
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
23 May 2025, 07:50 BST
Last source update
20 May 2026, 11:51 BST
Award evaluation window
Submission end – 23 Mar 2026
Authority reference
EEM0075
FTS notice number
2025/S 000-064841
Latest notice
Contract details notice (UK7)
Classification (CPV)
Bath liftsGoods liftsHoistsLift-maintenance servicesLiftsMechanical liftsStairlifts
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+2 moreSouth West (UKK)Wales (UKL)
Official registry OCID
ocds-h6vhtk-051fb9 Find a Tender

How it was run

Official notice
Run through: Delta eSourcing · Who buys & how to bid on Delta
Public notice page · account needed to bidElectronic submission allowedLanguage: EN
Access & registration note: Free Select account; no DUNS asked at signup
Appointment period ends
9 Jan 2026, 14:00 GMT
Clarification deadline
22 Dec 2025, 14:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Supplier levy on call-offs (max %)
call-off levy · 1.50% of call-off value
Detailed submission instructions & authority contactsFrom official release

Tenders must be completed and submitted electronically via www.delta-esourcing.com ↗ access code: B5GM2MUG3Z. Any submissions received via email (or other means) will be rejected.

Completed tenders must be uploaded by 14.00 hours on Friday 9th January 2026 to be considered for evaluation.

The Tenderbox will automatically close at 14.00 hours on Friday 9th January 2026 at which point no documents will be accepted into the system.

We will not accept any submissions after the closing date and time so please ensure that you allow yourself plenty of time when completing and uploading your submission to the portal. This includes any submissions started but not completed prior to the deadline.

If you are experiencing problems, then please contact the Delta eSourcing helpdesk on 0800 923 9236 or email [email protected] alternatively you can use the live chat function for further assistance.

We will treat all submissions as confidential. All costs associated with the preparation of the responses to this invitation to tender shall be borne in full by the tenderers.

Timeline

23 May 2025 → 20 May 2026 · 10 dates
  1. Planning notice published
    23 May 2025, 07:50 BST
  2. Tender notice published368 days ago
    13 Oct 2025, 15:03 BST
  3. Next notice expected368 days ago
    13 Oct 2025, 23:59 BST
  4. Clarification questions by298 days ago
    22 Dec 2025, 14:00 GMT
  5. Admission / appointment period ends280 days ago · period end, not a bid countdown
    9 Jan 2026, 14:00 GMT
  6. Award decision expected by207 days ago
    23 Mar 2026, 23:59 GMT
  7. Assessment summaries sent201 days ago
    30 Mar 2026, 00:00 BST
  8. Standstill ends189 days ago
    10 Apr 2026, 23:59 BST
  9. Contract starts180 days ago
    20 Apr 2026, 00:00 BST
  10. Latest notice published149 days ago
    20 May 2026, 11:51 BST

Notice history

10 events · 5 releases on Find a Tender · since 23 May 2025
  1. Pipeline notice published
    23 May 2025, 07:50 BST
    UK1
  2. Planned procurement notice published
    31 Jul 2025, 14:17 BST
    UK3
  3. Deadline published: 9 Jan 2026, 13:00 GMT
    31 Jul 2025, 14:17 BST
  4. Tender notice published
    13 Oct 2025, 15:03 BST
    UK4
  5. Status changed to active
    13 Oct 2025, 15:03 BST
  6. Deadline moved to 9 Jan 2026, 14:00 GMT
    13 Oct 2025, 15:03 BST
    +0 days · was 9 Jan 2026, 13:00 GMT
  7. Contract award notice published
    30 Mar 2026, 14:07 BST
    UK6
  8. Status changed to complete
    30 Mar 2026, 14:07 BST
  9. Contract signature expected
    16 Apr 2026, 23:59 BST
    scheduled
  10. Contract details notice published
    20 May 2026, 11:51 BST
    UK7
Routine re-releases (5)
  • 2025-07: 1 release · 31 Jul 2025
  • 2025-05: 1 release · 23 May 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 124 awards · see the list ↓
Bids received 129 from SMEs · busiest of 3 lots
Named bidders 15published on the award notice
Contracts signed 4latest 13 Apr 2026

Contracts

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Lift Installation and Refurbishment4final-stage tenders30—
2 · Lift Servicing and Maintenance6final-stage tenders30—
3 · Mobility Lift Solutions12final-stage tenders · 19 at stage one90—

Who bid

Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.

Contracting authority & participating public bodies

EFFICIENCY EAST MIDLANDS LIMITED

Contracting authorityPublic authority - sub-central government GB-COH: 07762614 · GB-PPON: PRXX-3953-HVQM 3 Maisies Way, Alfreton, East Midlands, DE55 2DSContact name, email

Framework contractors & participating bidders

15 commercial parties on the notice · 12 awarded
  • AMMCASS CONSTRUCTION ENGINEERING GROUP LIMITEDFramework contractorGB-COH: 10452894GB-PPON: PTDX-2661-MBCM Adams & Moore House, Dartford, South East, DA1 2AGContact email
  • Caretech UK LtdBidder / tendererGB-COH: 36389580GB-PPON: PXDJ-5886-QDYG Francis James & Partners LLP, 1386 London Road, Essex,, Leigh on Sea,, East of England, SS9 2UJ
  • Caretech UK LtdBidder / tendererGB-PPON: PXDJ-5886-QDYG Francis James & Partners LLP, 1386 London Road, Essex,, Leigh on Sea,, East of England, SS9 2UJ
  • LIFT AND ENGINEERING SERVICES LIMITEDFramework contractorGB-COH: 01913516GB-PPON: PYBH-8876-BMRZ 16 Portersfield Road, Warley, West Midlands, B64 7BNContact email
  • MIDLAND LIFT SERVICES LIMITEDFramework contractorGB-COH: 04411093GB-PPON: PQQJ-3428-QLPQ Unit 2, Property Court, Telford Way, Stephenson's Industrial Estate,, Coalville, East Midlands, LE67 3HEContact email
  • MILLBROOK HEALTHCARE LTDFramework contractorGB-COH: 00833987GB-PPON: PXMQ-4279-NRYQ Nutsey Lane Calmore Ind Estate, Southampton, South East, SO40 3XJContact email
  • MORRIS VERMAPORT LIMITEDFramework contractorGB-COH: 03681149GB-PPON: PBTN-9626-JGDH Mv House, 14 Vickery Way, Chilwell, Nottingham, East Midlands, NG9 6RYContact email
  • NORSE COMMERCIAL SERVICES LIMITEDFramework contractorGB-COH: 02888808GB-PPON: PRLT-2616-PGPY 280 Fifers Lane, Norwich, East of England, NR6 6EQContact email
  • OBAM DOMESTIC LIFTS SERVICES LIMITEDFramework contractorGB-COH: 04062743GB-PPON: PNCT-9785-ZRHM Tillbridge Road, Lincoln, East Midlands, LN1 2BPContact email
  • ORONA LIMITEDFramework contractorGB-COH: 01317466GB-PPON: PHWP-4751-NLVT 9 Europa View, Sheffield, Yorkshire & Humber, S9 1XHContact email
Show 5 more suppliers
  • PICKERINGS EUROPE LIMITEDFramework contractorGB-COH: 03217853GB-PPON: PTBJ-9769-JRHQ Cleveland House, Norton Road, Stockton-On-Tees, North East, TS20 2AQContact email
  • PREMIER MOBILITY (UK) LIMITEDFramework contractorGB-COH: 04744412GB-PPON: PZYB-6386-VTDG 136 Ashby Road, Hinckley, East Midlands, LE10 1SNContact email
  • SAADIA LTDFramework contractorGB-COH: 05549717GB-PPON: PTYG-2752-GVWY 19 Victoria Terrace, East Sussex, South East, BN3 2WBContact email
  • SAADIA LTDBidder / tendererGB-PPON: PTYG-2752-GVWY 19 Victoria Terrace, East Sussex, South East, BN3 2WB
  • Stannah Lift Services LimitedFramework contractorGB-COH: 1189799GB-PPON: PLRW-8315-JYBW Watt Close, East Portway Industrial Estate, Andover, South East, SP103SDContact email

Official documents & specifications (12)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specificationstenderBidding documents and specificationsClick the link www.delta-esourcing.com Click the Supplier Registration link at the top right of the page Complete and submit the registration form Click the link and sign in with your username and password: login.bipsolutions.com/cas/login Click 'Response Manager' to view open in…

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
  • Contract award notice awardContract award noticeUK6Contract award notice on Find a Tender
Show 3 more notices
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Planned procurement notice planningPlanned procurement noticeUK3Planned procurement notice on Find a Tender
  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender