Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 646–660

  1. Ends · in 291 daysFramework re-letExtension option · up to 31 Jul 2029Buyer plans to re-tender 2 Apr 2029Panel · 5 suppliers

    Provision of a Reactive Highways Framework

    Wrexham County Borough Council · Local authority · Wales (Cymru)

    Panel: A.Parry Construction Co. Ltd., Evans Construction, J&L Construction Ltd +2 more

    • Highway maintenance work
    Contract value
    £1.0mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Aug 2025 → 31 Jul 2027 · 1.9 yrs · up to 31 Jul 2029 with extensions
    Reference
    ocds-h6vhtk-0507b8
  2. Ends · in 291 daysFramework re-let

    Framework for Vertical Through-Floor Lifts

    Durham County Council · Local authority · North East England

    Incumbent: Sirius Demolition

    • Construction work
    • Lifts, skip hoists, hoists, escalators and moving walkways
    Contract value
    £800kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d3f1
  3. Ends · in 291 daysFramework re-let

    Framework for Vertical Through-Floor Lifts (001422)

    Durham County Council · Local authority · North East England

    Incumbent: GLC Projects Ltd

    • Construction work
    • Lifts, skip hoists, hoists, escalators and moving walkways
    Contract value
    £800kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d3f1
  4. Ends · in 291 daysPanel · 2 suppliers

    Proposed Car Park and Culvert Construction, George Street, Teignmouth

    Teignbridge District Council · Local authority · South West England

    Panel: PRIME BUILD SOUTH WEST LTD, Weaver Demolition Ltd

    • Construction work
    Contract value
    £369k
    Annual run-rate
    —panel, not one supplier
    Term
    23 Feb 2026 → 31 Jul 2027 · 1.4 yrs
    Reference
    ocds-h6vhtk-05a9b8
  5. Ends · in 291 daysFramework re-let

    survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: Sirius Demolition

    • Construction work
    Contract value
    £350kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d47b
  6. Ends · in 291 daysFramework re-let

    survey, design, supply, install, remove, recondition re-siting and/ or store of External Platform Lifts and associated works in the Community

    Durham County Council · Local authority · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England

    Incumbent: GLC Projects Ltd

    • Construction work
    Contract value
    £350kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04d47b
  7. Ends · in 291 days

    CALM PEACEPLUS River Restoration Works on Scotstown River – Phase 1

    Armagh, Banbridge & Craigavon Borough Council · Local authority

    Incumbent: CivCo Limited

    • Agricultural, forestry, horticultural, aquacultural and apicultural services
    • Construction work for water projects
    • Fences
    Contract value
    £298k
    Annual run-rate
    £298kvalue ÷ published term
    Term
    1 Aug 2026 → 31 Jul 2027 · 11 months
    Reference
    ocds-h6vhtk-06b6bb
  8. Ends · in 291 daysFramework re-letExtension option · up to 31 Jul 2029

    Framework for Traffic Calming Systems

    Durham County Council · Local authority · North East England

    Incumbent: Rosehill Polymers Ltd

    • Road traffic-control equipment
    • Traffic-calming works
    Contract value
    £170kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    12 Sept 2025 → 31 Jul 2027 · 1.8 yrs · up to 31 Jul 2029 with extensions
    Reference
    ocds-h6vhtk-055a58
  9. Ends · in 291 daysExtension option · up to 31 Jul 2028

    Diseworth Property Flood Resilience

    Leicestershire County Council · Local authority · East Midlands

    Incumbent: Whitehouse Construction Co. Limited

    • Construction work
    Contract value
    £123k
    Annual run-rate
    £119kvalue ÷ published term
    Term
    20 Jul 2026 → 31 Jul 2027 · 1 yrs · up to 31 Jul 2028 with extensions
    Reference
    ocds-h6vhtk-069fe0
  10. Ends · in 292 daysExtension option · up to 1 Aug 2033Buyer plans to re-tender 6 Apr 2033

    Fire Damper Maintenance Services

    University of Exeter · Central government · South West England

    Incumbent: Rock Compliance Limited

    • Fire suppression system
    • Fire-prevention installation works
    • Installation services of fire protection equipment
    Contract value
    £66kinc. VAT as published
    Annual run-rate
    £33kvalue ÷ published term
    Term
    1 Aug 2025 → 2 Aug 2027 · 2 yrs · up to 1 Aug 2033 with extensions
    Reference
    ocds-h6vhtk-04f9dd
  11. Ends · in 293 days

    Semington Main Contractor

    Greensquareaccord · South West England

    Incumbent: R J Leighfield & Sons Ltd

    • Construction work
    Contract value
    Not published
    Annual run-rate
    —value not published
    Term
    Ends 2 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-05a0be
  12. Ends · in 300 days

    Mine Shaft and Shallow Workings Treatment on Stowheath andLoxdale

    Wolverhampton City Council · Local authority · West Midlands

    Incumbent: Soil Engineering Geoservices Limited

    • Ground-stabilisation work
    Contract value
    £2.6minc. VAT as published
    Annual run-rate
    £1.9mvalue ÷ published term
    Term
    24 Mar 2026 → 9 Aug 2027 · 1.3 yrs
    Reference
    ocds-h6vhtk-055bb8
  13. Ends · in 301 daysExtension option · up to 10 Nov 2027

    Temple Marsh Landscape Works

    Medway Council · Local authority · South East England

    Incumbent: PVR Contracting Limited

    • Landscaping work
    • Landscaping work for green areas
    • Landscaping work for parks
    Contract value
    £291k
    Annual run-rate
    £291kvalue ÷ published term
    Term
    11 Aug 2026 → 10 Aug 2027 · 11 months · up to 10 Nov 2027 with extensions
    Reference
    ocds-h6vhtk-069bef
  14. Ends · in 301 daysExtension option · up to 10 Nov 2027

    Temple Marsh River Wall Works

    Medway Council · Local authority · South East England

    Incumbent: Suttle Projects Limited

    • River regulation and flood control works
    • River-wall construction
    • Riverbank protection works
    Contract value
    £239k
    Annual run-rate
    £239kvalue ÷ published term
    Term
    11 Aug 2026 → 10 Aug 2027 · 11 months · up to 10 Nov 2027 with extensions
    Reference
    ocds-h6vhtk-069bf5
  15. Ends · in 304 days

    Construction Works at Farnborough and Bessborough Sites, SW15 (Passivhaus)

    London Borough of Wandsworth · Local authority · Greater London

    Incumbent: Kind & Company (Builders ltd)

    • Building construction work
    • Construction work
    Contract value
    £24m
    Annual run-rate
    —start date not published
    Term
    Ends 13 Aug 2027 · start not published
    Reference
    ocds-h6vhtk-04c90e
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.