Retender radar: UK public contracts ending soon
Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).
By sector, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services1,17133Medical equipments, pharmaceuticals59179Business services: law, marketing, consulting48172IT services: consulting, software, internet18580Education and training services17860Transport services (except waste transport)17550Repair and maintenance services16715Food, drink, tobacco164
Contracts ending in the next 12 months
Showing 501–525
- Ends · in 206 daysExtension option · up to 7 Nov 2027
Kingswood Park Restoration and Enhancement Project 2025
South Gloucestershire Council · Local authority · South West England
Incumbent: K.P.Wilton & Son Limited
- Contract value
- £1.6m
- Annual run-rate
- £1.8mvalue ÷ published term
- Term
- 22 Jun 2026 → 7 May 2027 · 10 months · up to 7 Nov 2027 with extensions
- Reference
ocds-h6vhtk-05d10a
- Ends · in 206 days
Bridgwater Town Hall Refurbishment & Extension 2026
Bridgwater Town Council · Local authority · South West England
Incumbent: Qube Construct Ltd
- Contract value
- Not published
- Annual run-rate
- —value not published
- Term
- Ends 7 May 2027 · start not published
- Reference
ocds-h6vhtk-064e6f
- Ends · in 207 days
Museum of Two Halves Project, Wrexham - Enabling and Shell & Core Works Package
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: SWG Construction (Build and Renovate) Ltd
- Contract value
- £5.5m
- Annual run-rate
- £1.9mvalue ÷ published term
- Term
- 20 May 2024 → 8 May 2027 · 2.9 yrs
- Reference
ocds-h6vhtk-040c90
- Ends · in 207 days
Museum of Two Halves – Base Build Construction Works (Shell & Core)
Wrexham County Borough Council · Local authority · Wales (Cymru)
Incumbent: SWG Construction (Build and Renovate) Ltd
- Contract value
- £5.4m
- Annual run-rate
- £1.8mvalue ÷ published term
- Term
- 20 May 2024 → 8 May 2027 · 2.9 yrs
- Reference
ocds-h6vhtk-040c90
- Ends · in 209 days
Lot 1 - Upper Rhymney Valley
Caerphilly County Borough Council · Local authority · Wales (Cymru)
Incumbent: Deco Glass & Glazing Ltd
- Contract value
- £450k
- Annual run-rate
- £450kvalue ÷ published term
- Term
- 11 May 2026 → 10 May 2027 · 11 months
- Reference
ocds-h6vhtk-05e8bd
- Ends · in 209 days
Lot 2 - Eastern Valleys
Caerphilly County Borough Council · Local authority · Wales (Cymru)
Incumbent: Gary Carpenter Building Contractors
- Contract value
- £450k
- Annual run-rate
- £450kvalue ÷ published term
- Term
- 11 May 2026 → 10 May 2027 · 11 months
- Reference
ocds-h6vhtk-05e8bd
- Ends · in 209 days
Lot 3 - Lower Rhymney Valley
Caerphilly County Borough Council · Local authority · Wales (Cymru)
Incumbent: Cardo Group (Wales and West) Limited
- Contract value
- £450k
- Annual run-rate
- £450kvalue ÷ published term
- Term
- 11 May 2026 → 10 May 2027 · 11 months
- Reference
ocds-h6vhtk-05e8bd
- Ends · in 209 daysPanel · 2 suppliers
Lot 4 - Reserve
Caerphilly County Borough Council · Local authority · Wales (Cymru)
Panel: ALPHA BUILDING GROUP LTD, Fusion Electrical & Building Services Engineering Ltd
- Contract value
- £450k
- Annual run-rate
- —panel, not one supplier
- Term
- 7 Aug 2026 → 10 May 2027 · 9 months
- Reference
ocds-h6vhtk-05e8bd
- Ends · in 210 daysFramework re-let
IA2882 The Provision and Installation of Windows and Doors
Staffordshire County Council · Local authority · West Midlands
Incumbent: Strata Double Glazing & Joinery Centre Ltd
- Contract value
- Not published
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 11 May 2027 · start not published
- Reference
ocds-h6vhtk-038ca1
- Ends · in 210 daysFramework re-let
IA2882 The Provision and Installation of Windows and Doors
Staffordshire County Council · Local authority · West Midlands
Incumbent: Goliath Home World Ltd
- Contract value
- Not published
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 11 May 2027 · start not published
- Reference
ocds-h6vhtk-038ca1
- Ends · in 210 daysFramework re-let
IA2882 The Provision and Installation of Windows and Doors
Staffordshire County Council · Local authority · West Midlands
Incumbent: Carson Powell Construction Ltd
- Contract value
- Not published
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 11 May 2027 · start not published
- Reference
ocds-h6vhtk-038ca1
- Ends · in 213 daysFramework re-let
De Grey Street Frontage Improvement Scheme
Hull City Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Geo Houlton & Sons Ltd (Appointed to Lots 1, 2 & 3)
- Contract value
- £1.8mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- 12 Oct 2026 → 14 May 2027 · 7 months
- Reference
ocds-h6vhtk-0687e7
- Ends · in 213 days
Marine Lake Project, Weston-super-Mare
North Somerset Council · Local authority · South West England
Incumbent: EJ McGrath Construction Limited
- Contract value
- £856k
- Annual run-rate
- £531kvalue ÷ published term
- Term
- 3 Oct 2025 → 14 May 2027 · 1.6 yrs
- Reference
ocds-h6vhtk-052c09
- Ends · in 216 days
Network Cabling Replacements
Gateshead College · Education · North East England
Incumbent: GreySpace Advisory
- Contract value
- £100kinc. VAT as published
- Annual run-rate
- £100kvalue ÷ published term
- Term
- 18 May 2026 → 17 May 2027 · 11 months
- Reference
ocds-h6vhtk-0663f8
- Ends · in 217 days
West Way Sports Hub: Proposed Active Track & Ancillary Developments
Chorley Council · Local authority · North West England
Incumbent: Landscape Engineering Ltd
- Contract value
- £402k
- Annual run-rate
- £401kvalue ÷ published term
- Term
- 18 May 2026 → 18 May 2027 · 1 yrs
- Reference
ocds-h6vhtk-0595a6
- Ends · in 218 days
Refurbishment of The Civic Centre
Runnymede Borough Council · Local authority
Incumbent: M & J GROUP (CONSTRUCTION & ROOFING) LTD
- Contract value
- £2.1m
- Annual run-rate
- £2.9mvalue ÷ published term
- Term
- 26 Aug 2026 → 19 May 2027 · 8 months
- Reference
ocds-h6vhtk-058432
- Ends · in 219 days
DISABLED ADAPTATION WORKS at 29 Manse Road Burley in Wharfedale LS29 7LB
City of Bradford Metropolitan District Council · Local authority · Yorkshire and the Humber
Incumbent: Harrison Property Solutions Ltd
- Contract value
- £53k
- Annual run-rate
- £53kvalue ÷ published term
- Term
- 21 May 2026 → 20 May 2027 · 11 months
- Reference
ocds-h6vhtk-0600b7
- Ends · in 220 days
Goldthorpe Housing Project Phase 2a New Build and Phase 2b Public Realm
Barnsley Metropolitan Borough Council · Local authority · Nationwide (UK), Yorkshire and the Humber
Incumbent: Keystone Yorkshire Ltd
- Contract value
- £3.0m
- Annual run-rate
- £2.9mvalue ÷ published term
- Term
- 11 May 2026 → 21 May 2027 · 1 yrs
- Reference
ocds-h6vhtk-05026b
- Ends · in 223 days
TD2288 - Rosehill Children's Centre Replacement of Existing Passenger Lift
Derby City Council · Local authority · East Midlands
Incumbent: Concept Elevators (UK) Ltd
- Contract value
- £110k
- Annual run-rate
- £69kvalue ÷ published term
- Term
- 20 Oct 2025 → 24 May 2027 · 1.6 yrs
- Reference
ocds-h6vhtk-055d6d
- Ends · in 226 daysExtension option · up to 27 May 2029Buyer plans to re-tender 1 Sept 2028
Window and Rear Door Replacement Programme
Reading Borough Council · Local authority · South East England
Incumbent: C W G GROUP LTD
- Contract value
- £4.2m
- Annual run-rate
- £4.2mvalue ÷ published term
- Term
- 28 May 2026 → 27 May 2027 · 11 months · up to 27 May 2029 with extensions
- Reference
ocds-h6vhtk-059cde
- Ends · in 227 days
Becoming America- Exhibition Fit-out
Science Museum Group · Central government
Incumbent: Lucidblack Ltd
- Contract value
- £196k
- Annual run-rate
- £225kvalue ÷ published term
- Term
- 15 Jul 2026 → 28 May 2027 · 10 months
- Reference
ocds-h6vhtk-067dbe
- Ends · in 228 days
Construction works for the Advanced Manufacturing and Innovation District Scotland South (AMIDS South)
Renfrewshire Council · Local authority · Scotland
Incumbent: Farrans Construction trading as a division of Northstone (NI) Ltd.
- Contract value
- £35m
- Annual run-rate
- —start date not published
- Term
- Ends 29 May 2027 · start not published
- Reference
ocds-h6vhtk-03b4a6
- Ends · in 230 daysFramework re-letPanel · 16 suppliers
Lot 1 - Playground Equipment
ESPO · Nationwide (UK)
Panel: Dragon Play and Sports, EIBEPLAY LIMITED, Fawns Recreational Services Ltd +13 more
- Contract value
- £140mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-04b234
- Ends · in 230 daysFramework re-letPanel · 9 suppliers
Lot 7 - Wet pour Rubber Surfacing
ESPO · Nationwide (UK)
Panel: Abacus Playgrounds Ltd, Ace Play Limited, CREATIVE PLAY (UK) LIMITED +6 more
- Contract value
- £140mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-04b234
- Ends · in 230 daysFramework re-letPanel · 12 suppliers
Lot 8.1 - Sport and Play Surface - Synthetic Artificial Grass
ESPO · Nationwide (UK)
Panel: Abacus Playgrounds Ltd, Ace Play Limited, Axo Leisure Ltd +9 more
- Contract value
- £140mceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 May 2027 · start not published
- Reference
ocds-h6vhtk-04b234
How to read the radar
- End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.