Retender radar: UK public contracts ending soon

Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.

in Retenders

Syntax:"exact phrase"cleaning OR cateringsoftware -consultancy(cleaning OR catering) AND hospitalgovern*admin+defence

Contracts ending in the all future end dates

Showing 56,866–56,880

60,736 contracts

  1. Estimated end · in 1,798 daysFramework recordPanel · 4 suppliers

    PRO004875 - Services-Framework-Repair and Maintenance of Actuators and Valves

    United Utilities Water Limited · North West England

    Panel: Glenfield Invicta Ltd, Ham Baker Engineering Ltd, Qualtec Controls (a Division of Score Europe) +1 more

    • Repair and maintenance services of pumps, valves, taps and metal containers
    Published value
    £10mpublished ceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Estimated end 29 Sept 2031 · start not published
    Reference
    ocds-h6vhtk-04e776
  2. Ends · in 1,798 days

    Glenderamackin

    National Highways Limited · Central government

    Incumbent: West Cumbria Rivers consutancy Limited

    This work is to enable National Highways to develop advice and guidance on the use of NBS as part of a decision-making framework when tackling incidents of poor water quality and flooding risks. This aligns with the commitments National Hig…

    Published value
    £19minc. VAT as published
    Annual run-rate
    £3.8mpublished value ÷ term, inc. VAT
    Term
    14 Oct 2026 → 29 Sept 2031 · 5 yrs
    Reference
    ocds-h6vhtk-078d37
  3. Ends · in 1,798 daysExtension option · up to 29 Sept 2036

    National Supply of Sandbags

    ENVIRONMENT AGENCY · Other public body · North East England, North West England, East Midlands, West Midlands, East of England, South East England

    Incumbent: Weir & Carmichael Ltd

    National Supply of Sandbags for the Environment Agency.

    Published value
    £500kinc. VAT as published
    Annual run-rate
    £100kpublished value ÷ term, inc. VAT
    Term
    30 Sept 2026 → 29 Sept 2031 · 5 yrs · up to 29 Sept 2036 with extensions
    Reference
    ocds-h6vhtk-066b5c
  4. Ends · in 1,798 days

    North Northamptonshire Council - Juniper Hardware

    North Northamptonshire Council · Local authority · East Midlands

    Incumbent: Softcat Plc

    North Northamptonshire Council require Juniper Hardware for the Council's Local Area Network estate including licencing and support. Hardware to include 3 x QFX5120-48Y-AFO2 with Redundant PSU (2 in total per switch) and with stacking leads…

    Published value
    £36kinc. VAT as published
    Annual run-rate
    £7kpublished value ÷ term, inc. VAT
    Term
    30 Sept 2026 → 29 Sept 2031 · 5 yrs
    Reference
    ocds-h6vhtk-07900d
  5. Estimated end · in 1,799 days

    Elm Grove Estate Regeneration

    London Borough of Sutton · Local authority · Greater London

    Incumbent: Lovell Partnerships Ltd · Last contest: 3 bids · awarded 58% under the estimate

    Appointment of a partner for the development and regeneration of the Elm Grove estate on land within its ownership The Scheme will provide in the region of 290 mixed-tenure homes, as well as commercial / community floor-space at the Market …

    • Houses construction work
    Published value
    £50m
    Annual run-rate
    —start date not published
    Term
    Estimated end 30 Sept 2031 · start not published
    Reference
    ocds-h6vhtk-040cc9
  6. Ends · in 1,799 daysFramework recordExtension option · up to 30 Sept 2033Buyer plans to re-tender 1 Oct 2033Panel · 52 suppliers

    Care & Support at Home - Long Term Conditions

    Bournemouth, Christchurch and Poole Council · Local authority · South West England

    Panel: ABACUS CARE SOLUTIONS LTD, ADADA LTD., ADONAI CARE SERVICES LTD +49 more

    Published value
    £213mlargest agreement; total ceiling not published
    Annual run-rate
    —panel, not one supplier
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs · up to 30 Sept 2033 with extensions
    Reference
    ocds-h6vhtk-051343
  7. Ends · in 1,799 daysExtension option · up to 30 Sept 2033

    Provision of Revenues & Benefits Service

    London Borough of Barnet · Local authority · Greater London

    Incumbent: Liberata UK Ltd

    Provision of a fully outsourced Revenues and Benefits Service, to include Revenues & Benefits Customer Services. This service has been procured through further competition under CCS framework RM6295 Outsource Services, Lot 2, Business Servi…

    Published value
    £44m
    Annual run-rate
    £8.8mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs · up to 30 Sept 2033 with extensions
    Reference
    ocds-h6vhtk-0695c9
  8. Ends · in 1,799 daysExtension option · up to 1 Oct 2041

    RBWM Grounds Maintenance Contract Terms and Conditions

    The Royal Borough of Windsor and Maidenhead · Local authority · South East England

    Incumbent: Glendale Countryside Limited · Last contest: awarded at the estimate

    RBWM is seeking a grounds maintenance service provider to provide a range of grounds maintenance services across the borough. This will include, but is not limited to: verge maintenance, grass cutting, parks and open spaces maintenance, cem…

    Published value
    £38m
    Annual run-rate
    £7.5mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs · up to 1 Oct 2041 with extensions
    Reference
    ocds-h6vhtk-05dda8
  9. Ends · in 1,799 days

    6217 - Grounds Maintenance, Arboriculture and Burial Services - Boroughwide

    London Borough of Bexley · Local authority · Greater London

    Incumbent: Tivoli Group Ltd · Last contest: 3 bids (3 SME)

    Provision of Grounds Maintenance, Burials and Arboriculture Services, including Green Space assets including parks and open spaces, highway verges, corporate properties, horticulture feature maintenance, hard standing and weed management, h…

    • Horticultural services
    Published value
    £34m
    Annual run-rate
    —start date not published
    Term
    Ends 30 Sept 2031 · start not published
    Reference
    ocds-h6vhtk-04a83d
  10. Ends · in 1,799 daysExtension option · up to 30 Sept 2036Panel · 7 suppliers

    Warwickshire Care Home Pathway 2 Residential Short Stay Bed Block Contracts

    Warwickshire County Council · Local authority · West Midlands

    Panel: BUTTS CROFT LIMITED, Runwood Homes Limited, SERENE CARE LTD +4 more

    This was a retender of WCC Care Home Pathway 2 Residential Short Stay Bed Block Contracts (OCID ocds-h6vhtk-05496e/ Ref' WAR-0053) which has been terminated. Warwickshire County Council is seeking bids for care home block contracts for Path…

    Published value
    £29m
    Annual run-rate
    —panel, not one supplier
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs · up to 30 Sept 2036 with extensions
    Reference
    ocds-h6vhtk-069598
  11. Ends · in 1,799 daysExtension option · up to 30 Sept 2036

    Parking Enforcement & Operations 2025

    London Borough of Sutton · Local authority · Greater London

    Incumbent: Saba Park Services UK Limited · Last contest: awarded at the estimate

    The London Borough of Sutton (Sutton Council) is seeking expressions of interest from suitably qualified organisations for the provision of a Parking Enforcement & Operations service. The main objectives of this contract are to ensure: - Co…

    Published value
    £25m
    Annual run-rate
    £5.0mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs · up to 30 Sept 2036 with extensions
    Reference
    ocds-h6vhtk-052285
  12. Ends · in 1,799 daysExtension option · up to 30 Sept 2036

    RRV and CM

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: Mears Limited · Last contest: awarded at the estimate

    To undertake responsive repairs, voids, Cyclical service & Maintenance work in West Leeds Metropolitan area

    Published value
    £19m
    Annual run-rate
    £3.7mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs · up to 30 Sept 2036 with extensions
    Reference
    ocds-h6vhtk-04ed7d
  13. Ends · in 1,799 days

    Procurement of Alternative Provider of Medical Services (APMS) GP services for the villages of Creswell and Langwith on behalf of NHS England (North Midlands) and Hardwick Clinical Commissioning Group.

    NHS Derby & Derbyshire Integrated Care Board · NHS & health · East Midlands

    Incumbent: Derbyshire Community Health Services NHS Foundation Trust

    • General-practitioner services
    Published value
    £17m
    Annual run-rate
    £3.3mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs
    Reference
    ocds-h6vhtk-060238
  14. Ends · in 1,799 daysBuyer plans to re-tender 30 Jan 2031

    1

    Northern Ireland Prison Service · Central government

    Incumbent not published · Last contest: awarded at the estimate

    The Northern Ireland Prison Service (NIPS) (the Buyer) is an Executive agency of the Department of Justice NI (DOJ NI) and is responsible for the management of His Majesty’s Prisons in Northern Ireland. The Prison Service operates under the…

    Published value
    £16m
    Annual run-rate
    —not computed
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs
    Reference
    ocds-h6vhtk-068844
  15. Ends · in 1,799 daysExtension option · up to 30 Sept 2033Buyer plans to re-tender 1 Sept 2032

    CPG/12895/2025 - Provision of Hard Facilities Management and Associated Services for the British Embassy in Washington DC

    Foreign, Commonwealth and Development Office · Central government

    Incumbent: CBRE Managed Services Inc.

    The scope of Services covered in this Service Specification comprises: a) Management Services ("Management Services") b) Hard FM Services - Staff Residential Properties (“Hard FM Services - Staff Residential Property”) c) Hard FM Services -…

    Published value
    £16m
    Annual run-rate
    £3.2mpublished value ÷ term, exc. VAT
    Term
    1 Oct 2026 → 30 Sept 2031 · 5 yrs · up to 30 Sept 2033 with extensions
    Reference
    ocds-h6vhtk-05dec7

When contracts end
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

38,194 contracts and agreements end within 24 months, 60,736 in total · £224bn published GBP values end in the all future end dates, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.

  1. Next 3 months5,737
  2. 3–6 months8,084
  3. 6–12 months10,139
  4. 12–24 months14,234

Top sectors, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

An end date does not confirm a new procurement.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown; 59,532 of 60,736 contracts ending in this window carry a sector classification.

How to read the radar
  • End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
  • List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
  • Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.