Find a TenderClosedTender notice
Published 23 May 2025, 11:35 BST

Official UK procurement notice

Service, Repairs and Installation of Communal Heating Systems and Heat Networks

Official notice

Authority: The Guinness Partnership (Public body)

7 lotsServicesCompetitive flexible procedureAbove thresholdSME suitableMax 5 lots per supplier
Published estimate£135,190,980total for 7 lots · £135,190,980 inc. VAT · 1 value update
Submissions closed 16 Feb 2026
Lots 7max 5 won per supplier
Contract term 5 yrsends 31 Aug 2031 · up to 1 Sept 2041 with extensions · starts 1 Sept 2026

What is being bought7 lots · detail below

Published requirement description

The Guinness Partnership Limited (TGPL) and all of its subsidiaries is seeking organisations to provide Service, Repair and Installation Services to communal heating systems and heat networks in properties owned and managed by Guinness. Services are to include the servicing, maintenance and responsive repairs of all gas boilers, heat pumps, communal plant rooms, commercial gas catering equipment and heat networks in accordance with the Contract Specification, current gas regulations, and upcoming heat network regulations.

Guinness currently have 133 heat networks that provide heating and hot water to our residents and leaseholders.

  • How the procedure runs: This Competitive Flexible Procedure will be conducted in three stages. Stage 1 - Procurement Specific Questionnaire: Assessment of the Conditions of Participation on a pass / fail basis and scored quality questions to shortlist Participants to be invited to tender. It is intended to shortlist a minimum of 5 and a maximum of 7 Participants per Lot. Should Participant's that are ranked 6th and 7th be more than 2 percentage points below that of the 5th ranked Participant, Guinness reserve the right not to shortlist the Participant's ranked 6th and 7th. Stage 2 - Invitation to Tender: Assessment of scored quality questions and pricing submission. Quality questions will be weighted at 55% and pricing weighted at 40%. Further details are provided in the Procurement Documents. Stage 3 - Operational Scenario: Assessment of the approach to a realistic scenario which will be weighted at 5%. Following the evaluation of Stage 2 (quality and price), only those suppliers that have a mathematical chance of being successful will be invited to Stage 3. Participants that have a score which is greater than 5% below the highest ranked bidder, may not be invited to take part in stage 3 and will be informed that they are unsuccessful in the tender process. Guinness reserves the right to refine the procurement documents prior to Stage 2. It is the intention to appoint one supplier per Lot.

CPV: Boiler installation work · Central-heating installation work · Repair and maintenance services of boilers · Repair and maintenance services of central heating

Lots and requirements (7)Procurement structure

7 lots · all with a published value (£131,671,564 together) · win at most 5 of them · same evaluation weights on every lot
Lot #1Communal - Greater ManchesterRenewal North East, North West +7 5 yrsSMEPublished value£17,597,079

The requirements comprise of a planned preventative maintenance service and reactive maintenance services of communal heating systems and heat networks in Greater Manchester. The requirements may include planned upgrade works and retrofit of systems.

Guinness currently has 26 communal plant rooms which provide heat and hot water to 930 properties in this Lot.

Further details can be found in the Procurement Documents.

Guinness gives no guarantee on the volume of services that may be required during the contract as property numbers may increase or decrease during the term of the contract.

Contract period: 1 Sept 2026 – 31 Aug 2031 (5 yrs) · up to 1 Sept 2041 with extensionsValue: £17,597,079 exc. VAT · £21,116,495 inc. VAT
Extensions: The contract will be managed through Key Performance Indicators. In the event of a supplier performance failure, a supplier in another Lot may have its contract scope extended to include the requirements for properties where the failure occurred until assurance can be given that the reasons for the original failure have been rectified and will not occur again. Any planned upgrades or retrofit works may be tendered for separately and are not guaranteed to be given to the successful Supplier(s). · The Contract will be for an initial term of five years extendable at Guinness' sole discretion and subject to performance, for two further periods of five years, giving a total of 15 years. The extensions may be taken as single years.Second stage: 5–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Participants are required to demonstrate sufficient economic and financial standing by meeting the minimum turnover requirements and financial risk assessment as described in the Procurement Documents.

    Participants are required to demonstrate commitment that they can secure insurances as described in the Procurement Documents.

  • Technical & professional ability

    Participants must evidence that they have in place or commit to having in place before the contract start date, the following qualifications and standards or equivalent:

    • Gas Safe Registration (both the organisation and the employees)
    • COCN1 Core Commercial Gas Safety (employees only)
    • CCCN1 Core Commercial Catering Gas Safety (employees only)
Lot #2Communal - North WestRenewal North West 5 yrsSMEPublished value£12,896,956

The requirements comprise of a planned preventative maintenance service and reactive maintenance services of communal heating systems and heat networks in the North West (excluding Greater Manchester). The requirements may include planned upgrade works and retrofit of systems.

Guinness currently has 15 communal plant rooms which provide heat and hot water to 568 properties in this Lot.

Further details can be found in the Procurement Documents.

Guinness gives no guarantee on the volume of services that may be required during the contract as property numbers may increase or decrease during the term of the contract.

Contract period: 1 Sept 2026 – 31 Aug 2031 (5 yrs) · up to 1 Sept 2041 with extensionsValue: £12,896,956 exc. VAT · £12,896,956 inc. VAT
Delivery: North WestEligibility: SME eligible
Extensions: The contract will be managed through Key Performance Indicators. In the event of a supplier performance failure, a supplier in another Lot may have its contract scope extended to include the requirements for properties where the failure occurred until assurance can be given that the reasons for the original failure have been rectified and will not occur again. Any planned upgrades or retrofit works may be tendered for separately and are not guaranteed to be given to the successful Supplier(s). · The Contract will be for an initial term of five years extendable at Guinness' sole discretion and subject to performance, for two further periods of five years, giving a total of 15 years. The extensions may be taken as single years.Second stage: 5–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Participants are required to demonstrate sufficient economic and financial standing by meeting the minimum turnover requirements and financial risk assessment as described in the Procurement Documents.

    Participants are required to demonstrate commitment that they can secure insurances as described in the Procurement Documents.

  • Technical & professional ability

    Participants must evidence that they have in place or commit to having in place before the contract start date, the following qualifications and standards or equivalent:

    • Gas Safe Registration (both the organisation and the employees)
    • COCN1 Core Commercial Gas Safety (employees only)
    • CCCN1 Core Commercial Catering Gas Safety (employees only)
Lot #3Communal - Yorkshire, Lincolnshire, Nottinghamshire and DerbyshireRenewal Yorkshire & Humber, East Midlands 5 yrsSMEPublished value£15,689,783

The requirements comprise of a planned preventative maintenance service and reactive maintenance services of communal heating systems and heat networks in Yorkshire, Lincolnshire, Nottinghamshire and Derbyshire. The requirements may include planned upgrade works and retrofit of systems.

Guinness currently has 26 communal plant rooms which provide heat and hot water to 691 properties in this Lot.

Further details can be found in the Procurement Documents.

Guinness gives no guarantee on the volume of services that may be required during the contract as property numbers may increase or decrease during the term of the contract.

Contract period: 1 Sept 2026 – 31 Aug 2031 (5 yrs) · up to 1 Sept 2041 with extensionsValue: £15,689,783 exc. VAT · £15,689,783 inc. VAT
Delivery: Yorkshire & Humber, East MidlandsEligibility: SME eligible
Extensions: The contract will be managed through Key Performance Indicators. In the event of a supplier performance failure, a supplier in another Lot may have its contract scope extended to include the requirements for properties where the failure occurred until assurance can be given that the reasons for the original failure have been rectified and will not occur again. Any planned upgrades or retrofit works may be tendered for separately and are not guaranteed to be given to the successful Supplier(s). · The Contract will be for an initial term of five years extendable at Guinness' sole discretion and subject to performance, for two further periods of five years, giving a total of 15 years. The extensions may be taken as single years.Second stage: 5–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Participants are required to demonstrate sufficient economic and financial standing by meeting the minimum turnover requirements and financial risk assessment as described in the Procurement Documents.

    Participants are required to demonstrate commitment that they can secure insurances as described in the Procurement Documents.

  • Technical & professional ability

    Participants must evidence that they have in place or commit to having in place before the contract start date, the following qualifications and standards or equivalent:

    • Gas Safe Registration (both the organisation and the employees)
    • COCN1 Core Commercial Gas Safety (employees only)
    • CCCN1 Core Commercial Catering Gas Safety (employees only)
Lot #4Communal - London EastRenewal London 5 yrsSMEPublished value£39,508,281

The requirements comprise of a planned preventative maintenance service and reactive maintenance services of communal heating systems and heat networks in London East. The requirements may include planned upgrade works and retrofit of systems.

Guinness currently has 7 communal plant rooms which provide heat and hot water to 1,740 properties in this Lot.

Further details can be found in the Procurement Documents.

Guinness gives no guarantee on the volume of services that may be required during the contract as property numbers may increase or decrease during the term of the contract.

Contract period: 1 Sept 2026 – 31 Aug 2031 (5 yrs) · up to 1 Sept 2041 with extensionsValue: £39,508,281 exc. VAT · £39,508,281 inc. VAT
Delivery: LondonEligibility: SME eligible
Extensions: The contract will be managed through Key Performance Indicators. In the event of a supplier performance failure, a supplier in another Lot may have its contract scope extended to include the requirements for properties where the failure occurred until assurance can be given that the reasons for the original failure have been rectified and will not occur again. Any planned upgrades or retrofit works may be tendered for separately and are not guaranteed to be given to the successful Supplier(s). · The Contract will be for an initial term of five years extendable at Guinness' sole discretion and subject to performance, for two further periods of five years, giving a total of 15 years. The extensions may be taken as single years.Second stage: 5–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Participants are required to demonstrate sufficient economic and financial standing by meeting the minimum turnover requirements and financial risk assessment as described in the Procurement Documents.

    Participants are required to demonstrate commitment that they can secure insurances as described in the Procurement Documents.

  • Technical & professional ability

    Participants must evidence that they have in place or commit to having in place before the contract start date, the following qualifications and standards or equivalent:

    • Gas Safe Registration (both the organisation and the employees)
    • COCN1 Core Commercial Gas Safety (employees only)
    • CCCN1 Core Commercial Catering Gas Safety (employees only)
Lot #5Communal - London West & Home CountiesRenewal East of England, London +1 5 yrsSMEPublished value£13,964,134

The requirements comprise of a planned preventative maintenance service and reactive maintenance services of communal heating systems and heat networks in London West and Home Counties. The requirements may include planned upgrade works and retrofit of systems.

Guinness currently has 17 communal plant rooms which provide heat and hot water to 615 properties in this Lot.

Further details can be found in the Procurement Documents.

Guinness gives no guarantee on the volume of services that may be required during the contract as property numbers may increase or decrease during the term of the contract.

Contract period: 1 Sept 2026 – 31 Aug 2031 (5 yrs) · up to 1 Sept 2041 with extensionsValue: £13,964,134 exc. VAT · £13,964,134 inc. VAT
Delivery: East of England, London, South EastEligibility: SME eligible
Extensions: The contract will be managed through Key Performance Indicators. In the event of a supplier performance failure, a supplier in another Lot may have its contract scope extended to include the requirements for properties where the failure occurred until assurance can be given that the reasons for the original failure have been rectified and will not occur again. Any planned upgrades or retrofit works may be tendered for separately and are not guaranteed to be given to the successful Supplier(s). · The Contract will be for an initial term of five years extendable at Guinness' sole discretion and subject to performance, for two further periods of five years, giving a total of 15 years. The extensions may be taken as single years.Second stage: 5–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Participants are required to demonstrate sufficient economic and financial standing by meeting the minimum turnover requirements and financial risk assessment as described in the Procurement Documents.

    Participants are required to demonstrate commitment that they can secure insurances as described in the Procurement Documents.

  • Technical & professional ability

    Participants must evidence that they have in place or commit to having in place before the contract start date, the following qualifications and standards or equivalent:

    • Gas Safe Registration (both the organisation and the employees)
    • COCN1 Core Commercial Gas Safety (employees only)
    • CCCN1 Core Commercial Catering Gas Safety (employees only)
Lot #6Communal - Southeast & South CoastRenewal South East 5 yrsSMEPublished value£9,422,952

The requirements comprise of a planned preventative maintenance service and reactive maintenance services of communal heating systems and heat networks in the Southeast and South Coast. The requirements may include planned upgrade works and retrofit of systems.

Guinness currently has 16 communal plant rooms which provide heat and hot water to 415 properties in this Lot.

Further details can be found in the Procurement Documents.

Guinness gives no guarantee on the volume of services that may be required during the contract as property numbers may increase or decrease during the term of the contract.

Contract period: 1 Sept 2026 – 31 Aug 2031 (5 yrs) · up to 1 Sept 2041 with extensionsValue: £9,422,952 exc. VAT · £9,422,952 inc. VAT
Delivery: South EastEligibility: SME eligible
Extensions: The contract will be managed through Key Performance Indicators. In the event of a supplier performance failure, a supplier in another Lot may have its contract scope extended to include the requirements for properties where the failure occurred until assurance can be given that the reasons for the original failure have been rectified and will not occur again. Any planned upgrades or retrofit works may be tendered for separately and are not guaranteed to be given to the successful Supplier(s). · The Contract will be for an initial term of five years extendable at Guinness' sole discretion and subject to performance, for two further periods of five years, giving a total of 15 years. The extensions may be taken as single years.Second stage: 5–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Participants are required to demonstrate sufficient economic and financial standing by meeting the minimum turnover requirements and financial risk assessment as described in the Procurement Documents.

    Participants are required to demonstrate commitment that they can secure insurances as described in the Procurement Documents.

  • Technical & professional ability

    Participants must evidence that they have in place or commit to having in place before the contract start date, the following qualifications and standards or equivalent:

    • Gas Safe Registration (both the organisation and the employees)
    • COCN1 Core Commercial Gas Safety (employees only)
    • CCCN1 Core Commercial Catering Gas Safety (employees only)
Lot #7Communal - SouthwestRenewal South West 5 yrsSMEPublished value£22,592,379

The requirements comprise of a planned preventative maintenance service and reactive maintenance services of communal heating systems and heat networks in the Southwest. The requirements may include planned upgrade works and retrofit of systems.

Guinness currently has 34 communal plant rooms which provide heat and hot water to 995 properties in this Lot.

Further details can be found in the Procurement Documents.

Guinness gives no guarantee on the volume of services that may be required during the contract as property numbers may increase or decrease during the term of the contract.

Contract period: 1 Sept 2026 – 31 Aug 2031 (5 yrs) · up to 1 Sept 2041 with extensionsValue: £22,592,379 exc. VAT · £22,592,379 inc. VAT
Delivery: South WestEligibility: SME eligible
Extensions: The contract will be managed through Key Performance Indicators. In the event of a supplier performance failure, a supplier in another Lot may have its contract scope extended to include the requirements for properties where the failure occurred until assurance can be given that the reasons for the original failure have been rectified and will not occur again. Any planned upgrades or retrofit works may be tendered for separately and are not guaranteed to be given to the successful Supplier(s). · The Contract will be for an initial term of five years extendable at Guinness' sole discretion and subject to performance, for two further periods of five years, giving a total of 15 years. The extensions may be taken as single years.Second stage: 5–null candidates invited to tender
Pre-qualification & selection criteria (PQQ)2
  • Economic & financial standing

    Participants are required to demonstrate sufficient economic and financial standing by meeting the minimum turnover requirements and financial risk assessment as described in the Procurement Documents.

    Participants are required to demonstrate commitment that they can secure insurances as described in the Procurement Documents.

  • Technical & professional ability

    Participants must evidence that they have in place or commit to having in place before the contract start date, the following qualifications and standards or equivalent:

    • Gas Safe Registration (both the organisation and the employees)
    • COCN1 Core Commercial Gas Safety (employees only)
    • CCCN1 Core Commercial Catering Gas Safety (employees only)

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 7 lots
Quality: 60%Price: 40%
Published sub-criteria (3)
  • Quality: 55%
  • Operational Scenario: 5%
  • Cost: 40%
Published award criteria (3)
  • Cost
  • Quality
  • Operational Scenario
Lot distribution rule: It will not be permissible to be awarded more than five Lots Supplier's must meet the minimum turnover requirements for each lot and the combined requirements where bidding for multiple lots.
What this means for your bid
  • Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Closed
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
Unspecified in notice
First published
23 May 2025, 11:35 BST
Last source update
23 Jan 2026, 09:26 GMT
Award evaluation window
Submission end – 22 May 2026
Authority reference
TGP491
FTS notice number
2026/S 000-005512
Latest notice
Tender notice (UK4)
Classification (CPV)
Boiler installation workCentral-heating installation workRepair and maintenance services of boilersRepair and maintenance services of central heating
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)
Official registry OCID
ocds-h6vhtk-052193 Find a Tender
Contract terms summary

As described in the Procurement Documents

How it runs

This Competitive Flexible Procedure will be conducted in three stages.

Stage 1 - Procurement Specific Questionnaire: Assessment of the Conditions of Participation on a pass / fail basis and scored quality questions to shortlist Participants to be invited to tender. It is intended to shortlist a minimum of 5 and a maximum of 7 Participants per Lot. Should Participant's that are ranked 6th and 7th be more than 2 percentage points below that of the 5th ranked Participant, Guinness reserve the right not to shortlist the Participant's ranked 6th and 7th.

Stage 2 - Invitation to Tender: Assessment of scored quality questions and pricing submission. Quality questions will be weighted at 55% and pricing weighted at 40%. Further details are provided in the Procurement Documents.

Stage 3 - Operational Scenario: Assessment of the approach to a realistic scenario which will be weighted at 5%. Following the evaluation of Stage 2 (quality and price), only those suppliers that have a mathematical chance of being successful will be invited to Stage 3. Participants that have a score which is greater than 5% below the highest ranked bidder, may not be invited to take part in stage 3 and will be informed that they are unsuccessful in the tender process.

Guinness reserves the right to refine the procurement documents prior to Stage 2.

It is the intention to appoint one supplier per Lot.

Review and risk notes
Risks

The Contract may be modified on the materialisation of a known risk within the meaning of section 74 and paragraph 5 of Schedule 8 to the Act. The following risks have been identified for this Contract:

  1. Awaab's Law came into effect in October 2025 with the law being extended in 2026 and 2027 to address further Housing Health and Safety Rating System hazards.
  2. There is the ever-present possibility of mergers between Guinness and other housing organisations, which could substantially alter the current property numbers. Whilst there are not currently any such major projects known to the Procurement Team, this is extremely common within our sector and is not outside of the realms of possibility during the Contract Term.
  3. Property numbers will fluctuate due to property disposal, acquisition, or the development build programme. It is not possible to know how this will impact the property numbers anticipated under this Contract and in turn the impact on the Contract value.
  4. External factors could also impact upon the scope and associate cost of requirements, due to the introduction of new legislation or regulation. For example changes in law relating to National Insurance and Minimum National Wage which will impact the Supplier's ability to deliver the Contract at the tendered sum and in line with CPI provisions in the Contract. It is not possible to predict any increases in labour costs and the impact on the Contract value.
  5. Significant shifts in the economy impacting the cost of materials.
  6. Increase in contract value due to higher than expected replacement heating systems or retrofit requirements.
  7. Increase in contract value due to higher than expected CPI increases.
  8. Decrease in contract value due to lower than expected budget allocation.
  9. Quality of heating systems in properties that are acquired or through merger is unknown could result in a higher than expected requirement to replace the equipment or to retrofit to bring up to a compliant standard.
  10. The works required to bring the heating systems up to the standards of the Heat Network Regulations is unknown and may be greater than expected.
  11. Amendments to the Heat Network Regulations could impact on the requirements of the Contract. For example, impact to reportable KPIs to Ofgem, and Guinness KPIs, and implementation of Heat Network Zoning.
  12. In the instance of contract termination due to continued poor performance, one of the suppliers operating in the other lots will be awarded the contract without re-opening competition.
  13. The contract has provision to extend the contract for up to a further 10 years. The extensions may be exercised as single years or as two periods of five years.
  14. The frequency of servicing may change each year based on budget allocation and business performance and may be reduced in year with limited notice.
  15. The KPIs outlined in Appendix B are subject to change in response to updates in heat network regulations and evolving expectations on Guinness regarding the management of its heat networks.
  16. Guinness reserves the right to remove water sampling and dosing activities from the contract if Guinness chooses to engage other parties for this work or tender for a dedicated water quality contractor.
  17. Guinness will review its policies annually. As a result, policies may change during the Contract Term, and new policies may be introduced that will form part of the Contract. This may impact the scope and Total Contract Value.
  18. Demarcation of responsibility during defect liability period may change during the Contract Term and may include a different approach for each new development. Such as the Contractor only being responsible for in-property servicing and repairs and gas compliance, to all service outlined in the Contract.

How it was run

Official notice
Run through: ProContract (Due North) · Who buys & how to bid on ProContract
Supplier login requiredElectronic submission allowedLanguage: EN
Access & registration note: Free · short registration with manual review; public opportunity list
Requests to participate (first stage)
16 Feb 2026, 12:00 GMT
Submission deadline
16 Feb 2026, 12:00 GMT
Clarification deadline
2 Feb 2026, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

23 May 2025 → 1 Sept 2026 · 9 dates
  1. Planning notice published
    23 May 2025, 11:35 BST
  2. Market engagement
    18 Aug 2025, 23:59 BST

    This market engagement process will be conducted through a questionnaire allowing TGPL to gather input from potential suppliers. This exercise is intended to enhance our understanding of the market's experience and capabilities. The insights gained will help shape the Lotting structure in terms of size and regions of the Lots, pricing mechanisms, conditions of participation and IT requirements.

    We reserve the option to have engagement meetings with our incumbent suppliers and also suppliers who may or may not respond to the questionnaire which will further help to shape the approach to our final contract requirements.

    If you are interested in taking part in this process, the questionnaire can be found on the Proactis Portal:

    supplierlive.proactisp2p.com/Account/Login ↗

    Responses should be submitted through the portal by 4pm on the 18th August 2025.

  3. Next notice expected392 days ago
    1 Oct 2025, 23:59 BST
  4. Tender notice published280 days ago
    21 Jan 2026, 17:09 GMT
  5. Latest notice published278 days ago
    23 Jan 2026, 09:26 GMT
  6. Clarification questions by268 days ago
    2 Feb 2026, 17:00 GMT
  7. Submission deadline254 days ago
    16 Feb 2026, 12:00 GMT
  8. Award decision expected by159 days ago
    22 May 2026, 23:59 BST
  9. Contract starts58 days ago
    1 Sept 2026, 00:00 BST

Notice history

7 events · 4 releases on Find a Tender · since 23 May 2025
  1. Pipeline notice published
    23 May 2025, 11:35 BST
    UK1
  2. Preliminary market engagement notice published
    29 Jul 2025, 14:36 BST
    UK2
  3. Tender notice published
    21 Jan 2026, 17:09 GMT
    UK4
  4. Published value updated
    21 Jan 2026, 17:09 GMT
  5. Status changed to active
    21 Jan 2026, 17:09 GMT
  6. Procurement method changed
    21 Jan 2026, 17:09 GMT
  7. Tender notice published
    23 Jan 2026, 09:26 GMT
    UK4
Published amendments (1)

For each Lot, the Technical ability conditions of participation have been amended. The requirement for TP1 certification (employees only) has been removed and is no longer a mandatory requirement.

Routine re-releases (4)
  • 2025-05: 1 release · 23 May 2025

Contracting authority & participating public bodies

THE GUINNESS PARTNERSHIP LIMITED

Contracting authorityPublic undertaking GB-COH: IP031693 · GB-PPON: PBNQ-4523-TMYT 7th Floor, 350 Euston Road, London, London, NW1 3AXContact email

Official documents & specifications (6)

Official links; attachments are not copied

Tender pack and attachments

  • Bidding documents and specificationstenderBidding documents and specificationsAccess: TUPE Employee Liability Information will only be provided to Participants that are shortlisted to Stage 2. These will be available to download from the Proactis portal.
  • Bidding documents and specifications tenderBidding documents and specificationsFrom the Proactis home page, select "Opportunities" and filter the "Customer Name" to "The Guinness Partnership"

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender
  • Preliminary market engagement notice planningPreliminary market engagement noticeUK2Preliminary market engagement notice on Find a Tender
  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender