Official UK procurement notice
PFH Fire Safety Works Framework
Authority: Procurement for Housing (Public body)·Consortium: 2 public authorities
What is being bought7 lots · detail below
Published requirement descriptionEstablished in 2004, Procurement for Housing (PfH) is a national procurement consortium dedicated to the social housing sector and supported by the National Housing Federation (NHF), Chartered Institute of Housing (CIH) and HouseMark. Collectively our Members manage more than 90% of UK’ social housing stock, with PfH helping them to achieve efficiency savings using a wide range of services including framework agreements, dynamic purchasing systems, spend analyses, strategy reviews, consolidated billing and comprehensive reporting.
PfH is a contracting authority under Regulation 2 of the Public Contracts Regulations 2015 (“PCR 2015”) and a central purchasing body under regulation 37 PCR 2015.
Please refer to www.pfh.co.uk ↗ for additional information.
PfH is administered by Inprova Limited (Inprova) and is headquartered in the North West of England with over 20 years of expertise and experience offering a complete procurement solutions package across outsourcing, technology and consultancy. By integrating procurement services and technology, Inprova operates as a delivery partner supporting business performance improvement for both public and private sector clients.
PfH have sought qualified and experienced contractors and suppliers to establish a framework agreement for a range of fire safety works measures. The framework will be divided into seven lots with regions and value bands. A separate framework has recently been procured for Fire Safety Consultancy services.
CPV: Burglar and fire alarms · Cladding · Cladding works · Dampers · Emergency lighting equipment · Engineering design services for mechanical and electrical installations for buildings · Fire and explosion protection and control consultancy services · Fire doors · Fire suppression foam or similar compounds · Fire suppression system · Fire-alarm system installation work · Fire-alarm systems · +14 more
How this framework works
From the published notice- Places
- up to 50 suppliers · 38 bids on the busiest of 7 lots (0.8 per place) · 76 appointed (full)
Lots and requirements (7)Procurement structure
7 lots · all with a published value · same evaluation weights on every lotEvery one of these 5 lots carries the same published figure, £50,000,000: it is the framework's maximum for the whole notice, not each lot's own budget, and no share per lot is published. The cards below say ceiling above rather than repeat it.
Lot #1Active WorksAwardedRenewalceiling above
The scope includes the design, installation, testing, commissioning / handover and servicing and maintenance of new and existing active fire protection systems including but not limited to fire and smoke alarms, extinguishers, AOV’s, dry and wet risers and emergency lighting installations in accordance with the Specification including integration with the Member’s fire strategy / risk assessment and all required builder’s works.
PfH has awarded places on the framework to 5 supplier’s per region and value band.
Lot #2Passive WorksAwardedRenewalceiling above
The scope includes the design, installation, testing, commissioning / handover and servicing and maintenance of a range of passive fire protection measures including but not limited to fire resistant rated compartmentation works, replacement fire doors to PAS 24 standards, wet / dry riser works, fire sealing and damping, signage and photoluminescent path markers in accordance with the Specification including integration with the Member’s fire strategy / risk assessment and all required builder’s works.
PfH has awarded places on the framework to 5 supplier’s per region and value band.
Lot #3Fire Doors - Contractor Supply and InstallAwardedRenewalceiling above
The scope includes the supply and installation of fire doors in accordance with the Specification including integration with the Member’s fire strategy / risk assessment and all required builder’s works. Both supply and install of doors should be covered by relevant and valid third-party accreditation.
PfH has awarded places on the framework to 5 supplier’s per region and value band.
Lot #4Fire Doors - Manufacturer Supply and InstallAwardedRenewalPublished value£25,000,000
The scope includes the manufacture and installation of fire doors in accordance with the Specification including integration with the Member’s fire strategy / risk assessment and all required builder’s works. Both manufacture and install of doors should be covered by relevant and valid third-party accreditation.
PfH has awarded places on the framework to 5 supplier’s per region and value band.
Lot #5Fire Doors - Manufacturer Supply OnlyAwardedRenewalPublished value£25,000,000
The scope includes the supply of fire doors in accordance with the Specification including integration with the Member’s fire strategy / risk assessment and all required builder’s works. Doors supplied should be covered by relevant and valid third-party accreditation.
PfH has awarded places on the framework to 5 supplier’s per region and value band.
Lot #6CladdingAwardedRenewalceiling above
The scope includes the design, installation, testing, commissioning / handover and servicing and maintenance of a replacement Aluminium Composite Material (ACM) cladding panels with new fire-resistant cladding systems with appropriate compartmentation in accordance with the Member’s fire strategy / risk assessment and all required builder’s works.
PfH has awarded places on the framework to 5 supplier’s per region and value band.
Lot #7Whole Building WorksAwardedRenewalceiling above
The scope includes the design, installation, testing, commissioning / handover and servicing and maintenance of a range of active and passive fire protection measures as described in Lots 1, 2 & 3 inclusive, in accordance with the Specification including integration with the Member’s fire strategy / risk assessment and all required builder’s works.
PfH has awarded places on the framework to 5 supplier’s per region and value band.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (2)
- Quality: 60
- Price: 40
- Technical & professional ability
Accreditation and regulatory requirements are set out in the tender documents.
- Price carries 40 of 100 points: a 10% discount moves about 4 points. The method statement decides this lot, not the discount.
- “PFH Fire Safety Works Framework” is a framework: the contest is a place on its panel, up to 50 suppliers, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 10 Mar 2023, 10:38 GMT
- Last source update
- 15 Jan 2025, 10:22 GMT
- Award evaluation window
- 12 Sept 2024 – …
- FTS notice number
2025/S 000-001302- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03b1aaFind a Tender
- Electronic trading
- e-invoicing allowed · electronic ordering · electronic payment
- Performance terms
As stated in the procurement documents
- Planning notice 2023/S 000-007017 ↗
Publisher note: This Framework may be used by any contracting authority listed in or referred to in the FTS Notice. This includes: All current members of PfH at the time of the FTS notice for this procurement; Any registered provider of social housing (or Welsh registered social landlord ,or Scottish registered social registered social landlord) that becomes a member of PfH during the period of the Framework Agreement; Any public authority (as defined in the Freedom of Information Act 2000 for public authorities in England, Wales, Northern Ireland and UK-wide public authorities based in Scotland, or as defined in the Freedom of Information (Scotland) Act 2002 for Scottish public authorities) that becomes a member of PfH at any time during the period of the Framework Agreement; Any local authority (as defined in the Local Government Act 1972 for public authorities in England and Wales or as defined in the Local Government (Scotland) Act 1973 for Scottish local authorities or as defined in the Local Government Act (Northern Ireland) 1972 for local authorities in Northern Ireland) that becomes a member of PfH at any time during the period of the Framework Agreement; the Northern Ireland Housing Executive; any housing Arm's Length Management Organisation (ALMO) that becomes a member of PfH during the period of the Framework Agreement; Any wholly owned subsidiaries of any of the above Organisations; educational establishments and any other contracting authority listed on the following page of the PfH website : http://procurementforhousing.co.uk/permissible-users/ at the time of the FTS notice for this procurement. (MT Ref:233525)
How it was run
Official notice- Appointment period ends
- 12 Sept 2024, 17:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 90 days from the deadline
- Bids opened
- 12 Sept 2024, 17:00 BST
Timeline
1 Apr 2023 → 15 Jan 2025 · 4 dates- Next notice expected1 Apr 2023, 00:00 BST
- Admission / appointment period endsperiod end, not a bid countdown12 Sept 2024, 17:00 BST
- Bids opened12 Sept 2024, 17:00 BST
- Notice published15 Jan 2025, 10:22 GMT
Notice history
12 events · 7 releases on Find a Tender · since 1 Sept 2023- Published value updated to £100,000,0001 Sept 2023, 09:07 BSTwas £1,000,000,000
- Status changed to active1 Sept 2023, 09:07 BST
- Procurement method changed1 Sept 2023, 09:07 BST
- Deadline published: 10 Oct 2023, 17:00 BST1 Sept 2023, 09:07 BST
- Status changed to complete23 Jan 2024, 16:49 GMT
- Published value updated to £45,000,00013 Mar 2024, 11:57 GMTwas £100,000,000
- Status changed to active13 Mar 2024, 11:57 GMT
- Deadline moved to 15 Apr 2024, 17:00 BST13 Mar 2024, 11:57 GMT+188 days · was 10 Oct 2023, 17:00 BST
- Buyer details updated13 Mar 2024, 11:57 GMT
- Published value updated to £300,000,0002 Aug 2024, 12:46 BSTwas £45,000,000
- Deadline moved to 12 Sept 2024, 17:00 BST2 Aug 2024, 12:46 BST+150 days · was 15 Apr 2024, 17:00 BST
- Status changed to complete20 Aug 2024, 11:47 BST
Routine re-releases (7)
- 2024-03: 1 release · 13 Mar 2024
- 2024-01: 1 release · 23 Jan 2024
- 2023-09: 1 release · 1 Sept 2023
- 2023-03: 1 release · 10 Mar 2023
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast11 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 5 of these contracts carry the same published figure, £50,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Active Works
- Signed
- 10 Dec 2024
- Value
- ceiling above
- Status
- active
Passive Works
- Signed
- 10 Dec 2024
- Value
- ceiling above
- Status
- active
Fire Doors - Contractor Supply and Install
- Signed
- 10 Dec 2024
- Value
- ceiling above
- Status
- active
Fire Doors - Manufacturer Supply and Install
- Signed
- 10 Dec 2024
- Value
- £25,000,000
- Status
- active
Fire Doors - Manufacturer Supply Only
- Signed
- 10 Dec 2024
- Value
- £25,000,000
- Status
- active
Cladding
- Signed
- 10 Dec 2024
- Value
- ceiling above
- Status
- active
Whole Building Works
- Signed
- 10 Dec 2024
- Value
- ceiling above
- Status
- active
Fire Engineering Consultancy Services
- Signed
- 19 Jul 2024
- Value
- £20,000,000
- Status
- active
Fire Risk Assessments
- Signed
- 19 Jul 2024
- Value
- £15,000,000
- Status
- active
Fire Safety Consultancy Services
- Signed
- 19 Jul 2024
- Value
- £10,000,000
- Status
- active
Contract 002327-2024-1
- Signed
- 15 Jan 2024
- Value
- £100,000,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Active Works | 30bids · 30 electronic · 31 from abroad | 25 | — | — |
| 2 · Passive Works | 38bids · 38 electronic · 38 from abroad | 28 | — | — |
| 3 · Fire Doors - Contractor Supply and Install | 26bids · 26 electronic · 26 from abroad | 18 | — | — |
| 4 · Fire Doors - Manufacturer Supply and Install | 5bids · 5 electronic · 5 from abroad | 4 | — | — |
| 5 · Fire Doors - Manufacturer Supply Only | 5bids · 5 electronic · 5 from abroad | 4 | — | — |
| 6 · Cladding | 21bids · 21 electronic · 21 from abroad | 14 | — | — |
| 7 · Whole Building Works | 24bids · 24 electronic · 24 from abroad | 13 | — | — |
Contracting authority & participating public bodies
2 public bodies on the noticeFramework contractors & participating bidders
76 commercial parties on the notice · 50 awardedThe first 50 of 76 commercial parties (by name); the JSON mirror lists them all.
- A & E Elkins Ltd (Trading as Elkins Construction)Framework contractor
- ABCA Systems LtdFramework contractor
- ADEY Innovation LtdFramework contractor
- Adaston Ltd.Framework contractor
- Airex TechnologiesFramework contractor
- Alphatrack Systems LtdFramework contractor
- Ambisense LtdFramework contractor
- Axis Europe PlcFramework contractor
- BB7 Consulting LimitedFramework contractor
- Bailey Partnership (Consultants) LLPFramework contractor
Show 40 more suppliers
- Bell Group LimitedFramework contractor
- Britplas Facades LimitedFramework contractor
- Building PassportFramework contractor
- CLC Contractors LimitedFramework contractor
- Chubb Fire & SecurityFramework contractor
- Churches Fire Security LtdFramework contractor
- City Plumbing Supplies Holdings LimitedFramework contractor
- Clark ContractsFramework contractor
- DM Integrated LtdFramework contractor
- DorSuiteFramework contractor
- Dress for the WeatherFramework contractor
- EA-RS Group LimitedFramework contractor
- EVO Digital Techonologies Ltd.Framework contractor
- Fieldway Supplies LtdFramework contractor
- Fire Compliance Management ServicesFramework contractor
- Firntec LtdFramework contractor
- Formation Design & BuildFramework contractor
- Frankham Consultancy Group LimitedFramework contractor
- Gerda Security Products LtdFramework contractor
- Guildmore Facades and CladdingFramework contractor
- Harmony Fire LtdFramework contractor
- Heron Manufacture LimitedFramework contractor
- Higgins Partnerships 1961 PLCFramework contractor
- Hugh LS McConnellFramework contractor
- Hydrock Consultants LtdFramework contractor
- IFI Group LtdFramework contractor
- Ian Williams LimitedFramework contractor
- Insulated Render Systems (scotland) LtdFramework contractor
- Just CheckingFramework contractor
- KUPPAFramework contractor
- Lawtech Group LtdFramework contractor
- MP Group U K LimitedFramework contractor
- Magnum Opus Repairs LtdFramework contractor
- Maurice Flynn & Sons LtdFramework contractor
- Momentum 4 LtdFramework contractor
- Morgan Sindall Construction & InfrastructureFramework contractor
- NolijWork LtdFramework contractor
- Novus Property SolutionsFramework contractor
- PartB Group LtdFramework contractor
- Pavehall Construction LimitedFramework contractor
Official documents & specifications (6)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria
- Economic and financial selection criteria
- Technical selection criteria
- Economic and financial selection criteria
- Technical selection criteria