Official UK procurement notice
Major Projects QUDM · UK public procurement notice
Authority: NATIONAL GRID UK LIMITED (Public body)
What is being bought
Published requirement descriptionThis QUDM is for Substation Construction, Underground Cabling, Overhead Tower Line Construction, Overhead Wood Pole Line Construction and Civils works, all primarily from 33kV to 132kV.
In addition to the requirements of National Grid Electricity Distribution (NGED), the Contracting Authority reserves the right for other National Grid group companies to procure works and services through this QUDM. This may include, but is not limited to, the delivery of substation, underground cable and overhead line construction works associated with transmission and distribution network infrastructure. No minimum volume of work is guaranteed in respect of such requirements.
Once established, this QUDM may be used to tender the Major Projects Partnership, NGED's principal delivery framework for third-party construction services in ED3.
ED3 (Electricity Distribution 3) refers to the next five-year electricity distribution price control period (2028-2033), set by Ofgem, which will determine how distribution network operators (DNOs) plan and invest in Britain's electricity system. It is important because it will shape the scale, pace and delivery of network upgrades needed to support growing demand, connect new generation, and enable the transition to low carbon technologies, while ensuring services remain reliable, affordable, and responsive to customer needs. Delivery will involve close collaboration with key partners, who will play a vital role in enabling investment in infrastructure, innovation and network resilience to meet the needs of customers and communities over the coming period.
Substation Construction
- Works under Substation Construction comprise of the following indicative list, specific to working within a live high-voltage (primarily 33 to 132kV) distribution network substation environment, with a typical project estimated between £200,000 and £5million:
- New Build AIS/GIS.
- AIS/GIS substation extension.
- Major AIS/GIS substation asset replacement.
- Protection and control systems installation, configuration and commissioning.
- Mechanical and electrical installation, testing and commissioning
- Contractors may be required to procure from NGED pre-approved supplier lists, accept free-issue equipment, or accept novation of contracts placed by NGED (e.g. power transformers, protection and control, GIS, AIS, consumables).
- These works will be awarded on a regional basis, split between the four DNO licence areas of NGED.
Overhead Tower Line Construction
- Works under Overhead Tower Line Construction comprises of the following illustrative list for Tower Overhead Line Construction works with typical project estimated between £500,000 and £20million. Scope shall include but is not limited to, the following indicative types of works (primarily 33 to 132kV):
- Supply or collect free-issue towers and install to NGED specification.
- Electrical works for new and replacement overhead tower construction.
- These works will be across all four DNO licence areas of NGED and successful contractors may be appointed nationally.
Overhead Wood Pole Line Construction
- Works under Overhead Wood Pole Line Construction comprises of the following illustrative list for Wood Pole Line Construction works (primarily 33 to 132kV) with typical project estimated between £50,000 and £2million. Scope shall include but is not limited to, the following indicative types of works:
- Supply or collect free-issue wood poles and install to NGED specification.
- Electrical works for new and replacement overhead wood pole construction.
- These works will be across all four DNO licence areas of NGED and successful contractors may be appointed nationally.
Underground Cabling
- Works under Underground Cabling comprise of the following illustrative list for Underground Cabling Construction works with typical project estimated between £200,000 and £10million. Scope shall include but is not limited to, the following indicative types of works (primarily 33 to 132kV):
- Cable jointing up to 132kV (client-issued and non-client-issued materials).
- Temporary works design for jointing techniques
- Cable pulling: access, trenches, duct installation, jointing, testing, backfilling, installation.
- Cable removal: buried HV cable and associated above-ground equipment (terminations, oil tanks, kiosks, foundations).
- These works will be awarded on a regional basis, split between the four DNO licence areas of NGED.
Civils
- Works under Civils comprise of the following illustrative list for Civils works with typical project estimated between £100k to £5 million. Scope shall include but is not limited to, the following indicative types of works (primarily 33 to 132kV):
- Modification, demolition, dismantling, foundations, fencing, interceptors, drainage, roads, trenching, excavation, cable ducts within existing substations.
- Associated building maintenance (roofs, redecoration, joinery, guttering, glazing, trench covers, doors/gates).
- Specialist works for environmental protection (flooding, wind, humidity).
Multi-Disciplinary Works
- These works are designed to allow Contractors to offer more than one service from the above areas as a package of works and covers the requirements of all the above works.
- Contractors may be awarded works that covers two or more of the work required in Overhead Line - Tower, Overhead Line - Wood Pole, Substation and Underground Cable.
- These works will typically include the largest and most complex of NGED's projects.
- These works will be across all four DNO licence areas of NGED and successful contractors may be appointed nationally.
Scope generally applicable to all work categories
Design
- Outline and detailed design (construction, maintenance, temporary works, electrical safety), including drawings and technical reporting for planning/consent and construction information.
- Act as Principal Designer under CDM 2015 and appoint Principal Designer Representative as required.
- Review System Design Specification and prior design works for gaps, limitations and restrictions.
- Discharge planning/consent conditions into detailed design
- Manage design change with version control, and coordinate across disciplines to reduce interface risk.
- Eliminate hazards so far as reasonably practicable and reflect NGED environmental and sustainability requirements.
Surveys
- Plan, deliver and report all lifecycle surveys, including site walkover, borehole, soil, intrusive (e.g. foundation), existing asset and utility surveys.
Project, programme and site management
- Act as Principal Contractor under CDM 2015.
- Deliver works to NGED Management of Works procedures and all applicable standards.
- Manage safety, quality, security and environmental compliance
- Maintain site records, document control and a safe/secure site
- Deploy sufficient competent resources.
Enabling and site establishment
- Welfare compounds, fencing, security, temporary utilities, reinstatement on completion.
- Highway and service diversions, ground preparation and remediation, flood mitigation, soil stripping, bridge construction, permits and licences, environmental mitigation.
Stakeholder and consents
- Liaise with landowners, grantors, statutory bodies and undertakers (Local Highways Authority, Network Rail, Environment Agency, DNOs).
- Coordinate with Lands Team for survey access and support S172 evidence.
- Support consultation materials, attend and present at events, input to Consultation Report, liaise with Consents Integrator
- Support Client at technical stakeholder meetings and liaise with Client operational and project delivery teams.
Other works
- Procurement and supply chain management.
- Subcontractor management.
- Temporary and permanent access design and provision.
- Temporary works design, management and provision.
- Traffic management.
- Landscaping.
- Maintenance for the period agreed in planning/consent or with stakeholders, including Biodiversity Net Gain obligations.
- In order to support communications needs on the electricity distribution network, the installation of Telecoms ducts, chambers and Fibre Optic cable may be required alongside the HV cable installations. Telecoms ducts and chambers must comply with Standard Techniques CA6A, TC3a and TC3B.
- Communications tower construction may also be required, comprising of a square base for a radio tower, generator base and associated ducts and chambers, cable management, earthing and fencing as required.
CPV: Installation of telecommunications equipment · Overhead power lines · Substation construction work
How this dynamic market works
From the published notice- Type
- Dynamic market · pending
- Market period
- 28 Sept 2026 – …
- Buyer types
- utilities
- Supplier levy on call-offs (max %)
- none
Who may buy through it
Available for use by any member of the National Grid group (parent company National Grid plc) and references to National Grid shall be interpreted accordingly as covering the whole group (except where the context requires otherwise).
Specifically this will include:
National Grid Electricity Distribution
National Grid Electricity Transmission
National Grid Ventures
other entities within the National Grid UK corporate structure as may require access
The lotProcurement structure
single lot · no lot value publishedLot #1
- Economic & financial standing
Financial Stability through defined areas of compliance to National Grids stability and legal requirements.
Meet requirements of PA23 Schedules 6 & 7.
Verified by: Validation - Technical & professional ability
Capability in defined areas of safety, sustainability, cyber security, OHL Towers construction, OHL Wood Poles construction, Cable Installation construction, Substation construction, Civils Construction and Multi-Disciplinary construction.
Verified by: Validation
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- Economic & financial standing
Financial Stability through defined areas of compliance to National Grids stability and legal requirements.
Meet requirements of PA23 Schedules 6 & 7.
Verified by: Validation - Technical & professional ability
Capability in defined areas of safety, sustainability, cyber security, OHL Towers construction, OHL Wood Poles construction, Cable Installation construction, Substation construction, Civils Construction and Multi-Disciplinary construction.
Verified by: Validation
- “Major Projects QUDM” is a dynamic market: the contest is a place on its panel, not a single contract.
Competition analysis · published record, not a forecast of who will bid
How NATIONAL GRID UK LIMITED buys Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523), and who usually turns up
NATIONAL GRID UK LIMITED’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork (CPV 4523) →
How the contest usually goes
Winner shares use published awards; bid and price charts use contested lots.
i
How often small and medium firms win.
Share of awards where the winner’s size is known.
The counts under this question show how many awards have a known supplier size.
Small firms have won here. Neither number says whether you qualify; it describes who has been winning.
i
How often local firms win similar work.
Winners with a registered address in the delivery region, out of awards with a known address.
Here, local means registered in Greater London.
A local branch does not count if the registered address is elsewhere.
Most of this buyer’s recorded winners are registered outside Greater London.
i
How long buyers here take to decide after bids close.
Middle value in days from the deadline to the first award notice, on competitions that published both dates.
Only decided tenders count, so slow ones still waiting are not in.
Half of these awards were announced within 84 days of the bid deadline.
i
How often work is awarded with no recorded rival.
Direct awards and tenders where every published lot count shows one bid.
Both shares are minimums: some awards have no bid count.
Thin markets produce this too; it is not proof of a tailored specification.
Missing bid counts may hide more single-bid awards. This share is a minimum.
How many bids did past lots attract?
i
How many bids past lots received.
Each colour is a bid-count range. Only competed lots with a published count are included.
Past bids do not predict this tender.
1 bid20% / 4%
2–30% / 20%
4–60% / 38%
7+80% / 38%
How did awards compare with estimates?
i
Where winning prices landed against estimates.
Each colour shows awards below, close to or above the published estimate, one lot at a time.
On a framework or DPS, prices are agreed when work is called off.
Past prices are a guide, not a bid price.
Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.
Assess each lot i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
i
What past awards tell you about each lot.
See the forecast, this buyer’s earlier suppliers and firms with relevant wins.
No supplier is confirmed as a bidder.
Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list
Lot #1CPV 4523Estimate not published
i
How many bids this lot may attract.
The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.
Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative.
A forecast, not a list of bidders.
1 bid0%
2–33%
4–610%
7+86%
i
Where the award price may land.
The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.
No comparable awards for this lot yet.
A statistical guide from past awards, not a price to bid.
Who has supplied this buyer on similar work? i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
i
Who has done similar work for this buyer.
Past contracts are matched by buyer, title and type of work.
A past supplier may not bid again.
| Supplier | This buyer’s earlier contract | Lot | Award value | Why listed |
|---|---|---|---|---|
| Balfour Beatty Utility Solutions LimitedWorked for this buyer | 66/132kV Cable Installation Frameworkruns to Jul 2027 | — | £80m | Similar wording and category |
| A THOMAS PLANT HIRE LIMITEDWorked for this buyer | 66/132kV Cable Installation Frameworkruns to Jul 2027 | — | £80m | Similar wording and category |
| Network Plus Services LimitedWorked for this buyer | 66/132kV Cable Installation Frameworkruns to Jul 2027 | — | £80m | Similar wording and category |
| KN Network Services LtdWorked for this buyer | 66/132kV Cable Installation Frameworkruns to Jul 2027 | — | £80m | Similar wording and category |
| M & A DOOCEY CIVILENGINEERING LIMITEDWorked for this buyer | 66/132kV Cable Installation Frameworkruns to Jul 2027 | — | £80m | Similar wording and category |
Who could compete for this lot? i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
i
Who could compete for this lot?
Firms with relevant past wins. On a framework, we show firms on that agreement.
None is confirmed as a bidder.
| Supplier | Won in this category | Live contracts | Award vs estimate |
|---|---|---|---|
BAM Nuttall LimitedLarge | £44m10 awards in 36m · last 4 months ago | 1 live · £9.5m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | 53% below n=3 |
| £168k3 awards in 36m · last 2 months ago | 2 live · £2.1m iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | 16% below n=1 | |
| £74k3 awards in 36m · last 1 months ago | 2 live · £74k iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs | |
| £57k3 awards in 36m · last 4 months ago | None on file | no comparable pairs | |
| 14 awards in 36m · last 1 months ago | 1 live iPublic contracts this supplier still holds. Its awards whose published end date is still in the future, with their values. Many contracts publish no end date, so this is a floor, not the whole book. Unexpired says nothing about spare capacity. | no comparable pairs |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
- Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.
Procedure terms & legal framework
From the official record- Procedure method
- Dynamic market
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Open admission
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Utilities
- Commercial structure
- Dynamic market
- Who may use this agreement
Available for use by any member of the National Grid group (parent company National Grid plc) and references to National Grid shall be interpreted accordingly as covering the whole group (except where the context requires otherwise).
Specifically this will include:
National Grid Electricity Distribution
National Grid Electricity Transmission
National Grid Ventures
other entities within the National Grid UK corporate structure as may require access
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 9 Jun 2026, 16:19 BST
- Last source update
- 6 Aug 2026, 10:00 BST
- FTS notice number
2026/S 000-074509- Latest notice
- Dynamic market intention notice (UK13)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-06b11fFind a Tender
How to participate & submission route
Official notice Apply via portal- Requests to participate (first stage)
- —
- Admission period ends
- —
- Clarification deadline
- —
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Supplier levy on call-offs (max %)
- submission fee · none
forms.cloud.microsoft/Pages/ResponsePage.aspx ↗
Link for registration form for National Grid eSourcing system.
Please complete the form and select correct Dynamic Market to receive further registration details.
Timeline
9 Jun 2026 → 25 Jun 2027 · 4 dates- Planning notice published134 days ago9 Jun 2026, 16:19 BST
- Market engagement125 days ago18 Jun 2026, 23:59 BST
Interested suppliers are invited to provide:
- Company overview and relevant experience
- Areas of interest (Substation Construction, Underground Cabling, Overhead Tower Line Construction and Overhead Wood Pole Line Construction, Multi-discipline works or combinations)
- Details of relevant accreditations and certifications
- Examples of similar projects or services delivered
- Any innovative approaches or technologies relevant to the sector
The Document should be limited to a total of 2 pages of A4. A list of accreditations is all that is required at this stage, with validation to take place in the future tender opportunity.
Please submit to: [email protected]
Following this notice, National Grid will:
- Conduct an in-person market engagement supplier day - to provisionally be held on 25 June 2026 in the Warwick area - with interested suppliers. National Grid reserves its right, in its sole discretion, to select attendees to this engagement day based on experience and capability. A signed non-disclosure agreement will be required to be provided prior to attendance of the day.
- Refine requirements and procurement strategy
- Issue a formal procurement notice at a later date but a formal tender is not confirmed at this point.
- Tender notice published76 days ago6 Aug 2026, 10:00 BST
- Today21 Oct 2026
- Contract startsin 246 days25 Jun 2027, 00:00 BST
Notice history
5 events · 3 releases on Find a Tender · since 9 Jun 2026- Preliminary market engagement notice published9 Jun 2026, 16:19 BSTUK2
- Preliminary market engagement notice published12 Jun 2026, 16:47 BSTUK2
- Dynamic market intention notice published6 Aug 2026, 10:00 BSTUK13
- Status changed to active6 Aug 2026, 10:00 BST
- Procurement method changed6 Aug 2026, 10:00 BST
Commercial outcome & contract awards
Nothing awarded yet- Awards (0)
- No award published
- Contracts (0)
- No contract published
- Bid statistics
- No aggregate bid statistics published
Contracting authority & participating public bodies
Official documents & specifications (3)
Official links; attachments are not copiedNotices published for this procedure
- Dynamic market intention notice Dynamic market intention notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender
- Preliminary market engagement notice Preliminary market engagement notice on Find a Tender