Find a TenderAwardedContract details notice
Published 6 May 2025, 16:38 BST

Official UK procurement notice

Fire Pressure Regulated Valves Maintenance Elizabeth Line

Official notice

Authority: Transport for London (Public body)

ServicesCompetitive flexible procedureAbove thresholdUtilitiesSME suitable
Published estimate£1,800,000≈ £600k / year · £2,160,000 inc. VAT · 1 value update47.8% below published estimate
Submissions closed 25 Nov 2025awarded 16 Feb 2026
Awarded to Walter Frank & Sons Limited
Contract term 3 yrsends 26 Feb 2029 · up to 26 Feb 2031 with extensions · starts 27 Feb 2026

What is being bought

Published requirement description

There is a requirement to establish a new contract for the maintenance of the Pressure Regulating Valves (PRVs) that form part of the Elizabeth line fire suppression system.

The current contract, awarded via Single Source to the manufacturer, Walter Frank, is due for re procurement.

Moving to a competitive process aligns with TfL's procurement strategy by opening the requirement to market competition, supporting value for money, improved commercial leverage, and compliance with PA23 regulations.

Maintenance of the PRVs is a highly specialised activity involving off site servicing, testing and recalibration, and the issuance of Certificates of Conformity. There are 1,584 PRVs in service, and maintenance is required on a 36-month cycle, based on Elizabeth line Asset Engineering guidance. TfL will undertake all removal and reinstallation; the service provider will be responsible solely for offsite works. Up to 40 PRVs may be processed weekly.

A competitive flexible procedure will be undertaken via Find a Tender (FTS) to ensure full market participation - including the incumbent, who is not registered on RISQS. A prior market engagement notice generated six expressions of interest. These suppliers will progress through to the next stage and would be invited to tender has it is anticipated that not all suppliers would submit one.

This contract will ensure continued regulatory compliance, operational reliability of safety critical assets, and alignment with wider strategies including asset management principles, TfL's vision and values, and the commitments of the Mayor's Transport Strategy.

Significant savings and commercial improvements were anticipated through the introduction of competition and achieved.

A preliminary market engagement notice (UK2) was issued via the Find a Tender Service (FTS). This resulted in six expressions of interest being received via email, in addition to a submission from the incumbent supplier, bringing the total number of responses to seven. Following this engagement, only two suppliers proceeded to submit a formal bid.

  • How the procedure runs: This Procurement will be undertaken in two stages: Procurement Specific Questionnaire (PSQ) and Invitation to Tender (ITT), followed by the Best and Final Offer. On this occasion, the PSQ and ITT stages will be conducted concurrently, with the Best and Final Offer stage to follow thereafter. 1) Invitation To Tender (ITT) - The final tender documentation will be issued at this stage and the process shall be managed via the TfL e-Tendering Portal - Ariba. The Procurement Specific Questionnaire (PSQ) would be responded to along with the ITT in their entirety which will be scored as published in the ITT documentation. 2) Best and Final Offer (BAFO) - Bidders will be requested to submit their best and final offer prior to TfL closing tender evaluation.

CPV: Fire-prevention installation works · Fire-protection devices · Repair and maintenance services

The lotProcurement structure

single lot · value published
Lot #1AwardedRenewal 3 yrsSMEPublished value£1,800,000
Contract period: 27 Feb 2026 – 26 Feb 2029 (3 yrs) · up to 26 Feb 2031 with extensionsValue: £1,800,000 exc. VAT · £2,160,000 inc. VAT
Delivery: LondonEligibility: SME eligible
Extensions: Should the supplier satisfactorily meet the maintenance requirements as outlined, and all relevant stakeholders are fully satisfied with the quality of service delivered, a contract extension of up to two years may be considered.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored
Quality: 60%Price: 30%Social value: 10%
Published sub-criteria (3)
  • Technical: 60%
  • Commercial Submission: 30%
  • Social Value: 10%
Published award criteria (3)
  • Technical: Technical submissions would be evaluated as per the information in the tender documents.
  • Commercial Submission: Commercial submissions would be evaluated as per the information in the tender documents.
  • Social Value: Social value would be evaluated as per the information in the tender documents.
What this means for your bid
  • Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Competitive flexible procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Utilities
Commercial structure
Call-off under a framework
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
6 May 2025, 16:38 BST
Last source update
17 Apr 2026, 09:39 BST
Award evaluation window
Submission end – 2 Feb 2026
Authority reference
WS2520389605
FTS notice number
2025/S 000-068794
Latest notice
Contract details notice (UK7)
Classification (CPV)
Fire-prevention installation worksFire-protection devicesRepair and maintenance services
Delivery area
UKNorth East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)
+2 moreSouth East (UKJ)South West (UKK)
Official registry OCID
ocds-h6vhtk-050d67 Find a Tender
How it runs

This Procurement will be undertaken in two stages: Procurement Specific Questionnaire (PSQ) and Invitation to Tender (ITT), followed by the Best and Final Offer. On this occasion, the PSQ and ITT stages will be conducted concurrently, with the Best and Final Offer stage to follow thereafter.

  1. Invitation To Tender (ITT) - The final tender documentation will be issued at this stage and the process shall be managed via the TfL e-Tendering Portal - Ariba. The Procurement Specific Questionnaire (PSQ) would be responded to along with the ITT in their entirety which will be scored as published in the ITT documentation.
  2. Best and Final Offer (BAFO) - Bidders will be requested to submit their best and final offer prior to TfL closing tender evaluation.
Related procedures1
  • Call-off under framework RISQS

How it was run

Official notice
Run through: portal not identified
Electronic submission allowedLanguage: EN
Requests to participate (first stage)
25 Nov 2025, 17:00 GMT
Submission deadline
25 Nov 2025, 17:00 GMT
Clarification deadline
14 Nov 2025, 17:00 GMT
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

6 May 2025 → 17 Apr 2026 · 11 dates
  1. Planning notice published
    6 May 2025, 16:38 BST
  2. Next notice expected
    23 Jun 2025, 23:59 BST
  3. Market engagementmet
    4 Aug 2025, 23:59 BST

    No process has been agreed at the time of publishing the UK2 notice, the engagement date shown on this notice is subject to change..

    Once all interest has been received, site visit and other engagement process would be corresponded to all.

  4. Tender notice published358 days ago
    28 Oct 2025, 09:41 GMT
  5. Clarification questions by341 days ago
    14 Nov 2025, 17:00 GMT
  6. Submission deadline330 days ago
    25 Nov 2025, 17:00 GMT
  7. Award decision expected by260 days ago
    2 Feb 2026, 23:59 GMT
  8. Assessment summaries sent245 days ago
    18 Feb 2026
  9. Contract starts236 days ago
    27 Feb 2026
  10. Standstill ends235 days ago
    27 Feb 2026, 23:59 GMT
  11. Latest notice published187 days ago
    17 Apr 2026, 09:39 BST

Notice history

10 events · 6 releases on Find a Tender · since 6 May 2025
  1. Planned procurement notice published
    6 May 2025, 16:38 BST
    UK3
  2. Preliminary market engagement notice published
    4 Jun 2025, 09:23 BST
    UK2
  3. Preliminary market engagement notice published
    9 Jul 2025, 12:59 BST
    UK2
  4. Tender notice published
    28 Oct 2025, 09:41 GMT
    UK4
  5. Published value published: £1,800,000
    28 Oct 2025, 09:41 GMT
  6. Status changed to active
    28 Oct 2025, 09:41 GMT
  7. Contract award notice published
    18 Feb 2026, 11:21 GMT
    UK6
  8. Status changed to complete
    18 Feb 2026, 11:21 GMT
  9. Contract signature expected
    28 Feb 2026, 23:59 GMT
    scheduled
  10. Contract details notice published
    17 Apr 2026, 09:39 BST
    UK7
Published amendments (1)

The notice ended on the June 17,2025.

Routine re-releases (6)
  • 2025-07: 1 release · 9 Jul 2025
  • 2025-06: 1 release · 4 Jun 2025
  • 2025-05: 1 release · 6 May 2025

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Awards 1
Awarded value £940,1471 award exc. VAT
Bids received 22 from SMEs
Contracts signed 1latest 14 Apr 2026
Awarded toValueDateStatus
Walter Frank & Sons Limited1 Mar 2026 – 31 Mar 2029 · up to 31 Mar 2031Extensions: The initial contract term would be 3 years after which this contract has a 2-year extension option 1+1 (2 years) in total.£940,14716 Feb 2026Awarded

Contracts

  • Contract 1 · Walter Frank & Sons Limited

    Signed
    14 Apr 2026
    Value
    £1,128,176
    Period
    14 Apr 2026 – 9 Apr 2029 · up to 9 Apr 2031 with extensions
    Status
    active
    Extensions
    Possible extension for 2 years (1+1)
    3 agreed KPIs: Regulatory and Technical Compliance of PRV Maintenance · Turnaround Time and Throughput Efficiency · Commercial Value and Continuous Improvement
    • Regulatory and Technical Compliance of PRV Maintenance
    • Turnaround Time and Throughput Efficiency
    • Commercial Value and Continuous Improvement

Bid statistics published by the authority

BidsSMEVCSEValid bid range
2final-stage tenders20—

Contracting authority & participating public bodies

Transport for London

Contracting authorityPublic authority - central government GB-PPON: PHMT-6197-NWNZ 5 Endeavour Square, London, London, E20 1JNContact name, email

Bidders & participating suppliers

1 commercial party on the notice
  • Walter Frank & Sons LimitedAwarded supplierGB-COH: 00434787GB-PPON: PMXR-9297-MWLM St Peg Lane, Cleckheaton, Yorkshire & Humber, BD19 3SLContact email

Official documents & specifications (6)

Official links; attachments are not copied

Notices published for this procedure