Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 1,176–1,200
- Ends · in 142 days
Castlefield Viaduct – Enabling Works
National Highways Limited · Central government
Incumbent: Amalgamated Construction Ltd (a1 a2 a3 a4 a5 a6 a7 a8 a9 a10 a11)
Enabling works at Castlefield Viaduct, Manchester, to support Phase 2 of the public access and greenspace scheme being delivered with the National Trust. The works comprise site investigation, clearance of drainage channels and a full tacti…
- Published value
- £425k
- Annual run-rate
- £424kpublished value ÷ term, exc. VAT
- Term
- 20 Mar 2026 → 20 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-078a36
- Estimated end · in 143 daysFramework recordPanel · 3 suppliers
CE-34-23- Framework Agreement for External Fabric Upgrade Works
South Ayrshire Council · Local authority · Scotland
Panel: Ailsa Building Contractors Ltd, GMG Contractors Ltd, Hugh LS McConnell
- Published value
- £11mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Mar 2027 · start not published
- Reference
ocds-h6vhtk-045a28
- Ends · in 143 days
Micro Asphalt Surfacing
Stockton on Tees Borough Council · Local authority · North East England
Incumbent: Colas Limited
Micro asphalt surfacing is a critical element of the Council's preventative highway maintenance programme. It is a cost-effective treatment that helps extend pavement life, improve skid resistance, seal the carriageway against water ingress…
- Published value
- £140k
- Annual run-rate
- —not computed
- Term
- 21 Sept 2026 → 21 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-07885d
- Ends · in 143 days
Lizard Bridge and boardwalk replacement
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · South West England
Incumbent: Naturally Green · Last contest: awarded 10% under the estimate
Total replacement of an old bridge and boardwalk on the Lizard NNR to provide safe access to trails and footpaths
- Published value
- £40k
- Annual run-rate
- £76kpublished value ÷ term, exc. VAT
- Term
- 8 Sept 2026 → 21 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06d8d6
- Estimated end · in 144 days
17 New Housing Units, Dores, Inverness
The Highland Council · Local authority · Scotland
Incumbent: Simpson Builders · Last contest: 7 bids (7 SME)
17 New Housing Units at Dores Inverness
- Published value
- £4.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Mar 2027 · start not published
- Reference
ocds-h6vhtk-05fb7a
- Estimated end · in 144 days
Design, Supply and Install of a Materials Recovery Facility (MRF)
Glasgow City Council · Local authority · Scotland
Incumbent: Turmec Limited · Last contest: 6 bids (4 SME)
Procurement for the design, supply and install of a Materials Recovery Facility (MRF) as part of the planned re-development of Glasgow City Council's Easter Queenslie property at 90 Easter Queenslie Road Glasgow G33 4UL.
- Published value
- £15m
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Mar 2027 · start not published
- Reference
ocds-h6vhtk-040d2f
- Estimated end · in 144 days
Lot 1 - South - South Down Area
Northern Ireland Housing Executive · Northern Ireland
Incumbent: HETHERINGTON PAINTING BUILDING · Last contest: 11 bids (1 SME)
- Published value
- £3.5m
- Annual run-rate
- —start date not published
- Term
- Estimated end 22 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04dbb6
- Ends · in 144 days
External Wall Remediation Press Court
Southern Housing · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: AMBER CONSTRUCTION GROUP LTD
External wall remediation at Press Court
- Published value
- £3.8minc. VAT as published
- Annual run-rate
- £3.3mpublished value ÷ term, inc. VAT
- Term
- 4 Feb 2026 → 22 Mar 2027 · 1.2 yrs
- Reference
ocds-h6vhtk-06561c
- Ends · in 144 days
External wall remediation works at Press Court
Southern Housing · Other public body · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: AMBER CONSTRUCTION GROUP LTD
External wall remediation works at Press Court estate
- Published value
- £3.1m
- Annual run-rate
- £2.9mpublished value ÷ term, exc. VAT
- Term
- 22 Feb 2026 → 22 Mar 2027 · 1.1 yrs
- Reference
ocds-h6vhtk-064dd4
- Ends · in 144 days
Mulberry Environmental Works
Vico Homes · Other public body · Yorkshire and the Humber
Incumbent: JPW YORKSHIRE LIMITED
Vico Homes Ltd invites bids from organisations capable of delivering full-service Environmental works including but not limited to, driveways, fencing, soft landscaping and other associated works at Mulberry Place. The successful contractor…
- Published value
- £1.2minc. VAT as published
- Annual run-rate
- £1.5mpublished value ÷ term, inc. VAT
- Term
- 15 Jun 2026 → 22 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06a3cf
- Ends · in 144 days
NCC1109 Berwick Maltings Theatre Main Contractor
Northumberland County Council · Local authority · North East England
Incumbent: WILLMOTT DIXON LIMITED · Last contest: 2 bids
Northumberland County Council (NCC) conducted a procurement exercise to appoint a main contractor to carry out the works at The Berwick Maltings Theatre. Project Aims: • Provide a landmark cultural attraction at the heart of the town, creat…
- Published value
- £884k
- Annual run-rate
- —start date not published
- Term
- Ends 22 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04d698
- Ends · in 144 days
BAS - Rothera Fire Alarm Upgrade
UK Research and Innovation · Central government
Incumbent: G & A Barnie Group Ltd.
UKRI has appointed a supplier for the Rothera Fire Alarm Upgrade.
- Published value
- £468k
- Annual run-rate
- —not computed
- Term
- 28 Sept 2026 → 22 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-07771a
- Ends · in 144 days
DFG commission service Schedule of Works
London Borough of Hackney · Local authority · Greater London
Incumbent: UK Adaptations
Hackney Council (“the Authority”) is seeking Quotations for the supply of a specialist service to carry out a key element of the Disabled Facilities Grant (DFG) adaptation process for the new DFG Home Adaptations Service under Adult Social …
- Published value
- £96k
- Annual run-rate
- £96kpublished value ÷ term, exc. VAT
- Term
- 23 Mar 2026 → 22 Mar 2027 · 1 yr
- Reference
ocds-h6vhtk-068bf4
- Ends · in 144 daysExtension option · up to 20 Aug 2030
Witney Resource Centre Grid Upgrade
Oxfordshire County Council · Local authority · South East England
Incumbent: SOUTHERN ELECTRIC POWER DISTRIBUTION PLC
Witney Resource Centre Grid Upgrade Moorland Road
- Published value
- £89k
- Annual run-rate
- £152kpublished value ÷ term, exc. VAT
- Term
- 20 Aug 2026 → 22 Mar 2027 · 7 months · up to 20 Aug 2030 with extensions
- Reference
ocds-h6vhtk-078395
- Estimated end · in 145 days
Drainage
Wolverhampton City Council · Local authority · West Midlands
Incumbent: Draintech Services (Midlands) Limited · Last contest: 6 bids (6 SME) · awarded at the estimate
This contract will be to provide a drainage and a civils service to complement the in-house repairs and maintenance service in and outside of normal working hours to residential properties within the Wolverhampton area on behalf of Wolverha…
- Published value
- £1.6m
- Annual run-rate
- —start date not published
- Term
- Estimated end 23 Mar 2027 · start not published
- Reference
ocds-h6vhtk-0391f9
- Ends · in 145 daysExtension option · up to 23 Mar 2028
Marjorie Waite Court Floor Finishes
City of York Council · Local authority · Yorkshire and the Humber
Incumbent: TECHCON FLOORING SERVICES LIMITED
A number of carpets in high traffic communal areas at Marjorie Waite Court have become heavily soiled and stained. The carpets in question are now beyond cleaning and need to be replaced with a more durable and easier to clean alternative, …
- Published value
- £30k
- Annual run-rate
- £30kpublished value ÷ term, exc. VAT
- Term
- 23 Mar 2026 → 23 Mar 2027 · 1 yr · up to 23 Mar 2028 with extensions
- Reference
ocds-h6vhtk-066ae4
- Estimated end · in 146 days
Supply & Installation of Floor Coverings
Midland Heart · West Midlands
Incumbent: Stebro Flooring Company Ltd · Last contest: 5 bids (2 SME) · awarded 14% under the estimate
Midland Heart are seeking bids from fully experienced providers who are trained and capable in the replacement of domestic and commercial flooring and associated works. The winning contractors’ operatives are required to be skilled and trai…
- Published value
- £3.0m
- Annual run-rate
- —start date not published
- Term
- Estimated end 24 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04b20d
- Estimated end · in 146 daysFramework recordPanel · 6 suppliers
Framework Agreement for Reactive Maintenance Works
City & County of Swansea · Local authority · Wales (Cymru)
Panel: ASW Property Services Limited, CARDO (WALES & WEST) LIMITED, M Delacey & Sons (Holdings) Ltd +3 more
- Published value
- £0largest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 24 Mar 2027 · start not published
- Reference
ocds-h6vhtk-04b2ee
- Ends · in 146 daysExtension option · up to 2 Apr 2027
Surveying and Design
Medway NHS Foundation Trust · Central government · Nationwide (UK)
Incumbent: Harmony Fire Ltd
Surveying and Design Purchase order:270003404
- Published value
- £389k
- Annual run-rate
- £532kpublished value ÷ term, exc. VAT
- Term
- 1 Jul 2026 → 24 Mar 2027 · 9 months · up to 2 Apr 2027 with extensions
- Reference
ocds-h6vhtk-06cd77
- Estimated end · in 148 daysFramework recordPanel · 9 suppliers
Framework Agreement for Mechanical and Associated Works 2023-2025 (2027) for works up to a value of £500,000
Wigan Council · Local authority · North West England
Panel: CPL Heating & Plumbing Ltd, DFP Services Ltd, EE Thompson and Son Ltd (Thompson Building Services Engineers) +6 more
- Published value
- £10mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Mar 2027 · start not published
- Reference
ocds-h6vhtk-038c20
- Estimated end · in 148 daysFramework recordPanel · 2 suppliers
Provision of Framework Agreement for the Disabled Facilities Grant Adaptations and Ramped Access Works
BLACKPOOL COUNCIL · Local authority · North West England
Panel: Bambers Remedial Contractors, The Excellent Ramp System Ltd
- Published value
- £6.0mlargest agreement; total ceiling not published
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03991f
- Estimated end · in 148 daysDynamic purchasing system recordPanel · 17 suppliers
DPS for the Provision of Highways and Civil Engineering Works within Powys, Mid Wales
Powys County Council · Local authority · Wales (Cymru)
Panel: ALUN GRIFFITHS (CONTRACTORS) LIMITED, COYLE SURFACING LIMITED, EVABUILD LIMITED +14 more
Re-procurement openDynamic Purchasing System for the Provision of Highways and Civil Engineering Works within Powys, Mid Wales · bids close
- Published value
- £4.0mpublished ceiling for the whole dynamic purchasing system
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 26 Mar 2027 · start not published
- Reference
ocds-h6vhtk-048478
- Ends · in 148 days
Bideford Pannier Market Modernisation
Bideford Town Council · Local authority · South West England
Incumbent: Arque Limited
Bideford Pannier Market repairs and refurbishment works, mainly to the external fabric of the existing building. Please note this tender is being issued by Torridge District Council on behalf of Bideford Town Council.
- Published value
- £1.4m
- Annual run-rate
- £1.9mpublished value ÷ term, exc. VAT
- Term
- 6 Jul 2026 → 26 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06bb9b
- Ends · in 148 days
Eastmoor Health Centre Building Upgrade
NHS Property Services Limited · NHS & health
Incumbent: Dobson Construction Ltd
Contract for Eastmoor Health Centre Building Upgrade
- Published value
- £526k
- Annual run-rate
- £991kpublished value ÷ term, exc. VAT
- Term
- 14 Sept 2026 → 26 Mar 2027 · 6 months
- Reference
ocds-h6vhtk-06d093
- Ends · in 148 days
Contract for Groundworks, Drainage & Surfacing Works at Maes Glas
City & County of Swansea · Local authority · Wales (Cymru)
Incumbent: NT GROUNDWORKS LIMITED
Contract for Groundworks, Drainage & Surfacing Works at Maes Glas
- Published value
- £107k
- Annual run-rate
- £137kpublished value ÷ term, exc. VAT
- Term
- 15 Jun 2026 → 26 Mar 2027 · 9 months
- Reference
ocds-h6vhtk-06b3f8
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,66945Construction work2,10872IT services: consulting, software, internet1,62760Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.