Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Construction work
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

252 contracts end within 24 months, 424 in total · £1.5bn published GBP value, exc. VAT, in the next 12 months (framework ceilings included, not a spend forecast).

  1. Next 3 months26
  2. 3–6 months71
  3. 6–12 months48
  4. 12–24 months107

By sector, next 12 months
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the next 12 months

Showing 586–600

  1. Ends · in 260 days

    291 Harrow Road Pre-Construction Services, Enabling and Main Works

    Westminster City Council · Local authority · Nationwide (UK), Greater London

    Incumbent: WATES CONSTRUCTION LIMITED

    • Construction work for houses
    Contract value
    £2.5m
    Annual run-rate
    £2.6mvalue ÷ published term
    Term
    15 Jul 2026 → 30 Jun 2027 · 11 months
    Reference
    ocds-h6vhtk-0516f3
  2. Ends · in 260 days

    Paisley Grammar School Community Campus (PGSCC) - Principal Contractor (PC)

    Renfrewshire Council · Local authority · Scotland

    Incumbent: Galliford Try Construction Limited

    • Building construction work
    • Construction work
    • Secondary school construction work
    Contract value
    £2.0m
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-02dcab
  3. Ends · in 260 days

    TD2236 - Electrical Equipment & Fixed Wire Testing Services

    Derby City Council · Local authority · East Midlands

    Incumbent: Security and Fire Experts Ltd

    • Electrical equipment and apparatus
    • Electrical services
    • Electrical wiring work
    Contract value
    £450k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-04e671
  4. Ends · in 260 daysFramework re-letExtension option · up to 30 Jun 2029

    e-ITT for the provision of Framework for the Design, Supply, Erection and Hire of Independent Scaffolding

    New Forest District Council · Local authority · South East England

    Incumbent: S&K Scaffolding Ltd

    • Scaffolding work
    Contract value
    £330kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Jul 2025 → 30 Jun 2027 · 1.9 yrs · up to 30 Jun 2029 with extensions
    Reference
    ocds-h6vhtk-05088e
  5. Ends · in 260 days

    Paisley Grammar School Community Campus (PGSCC) - Principal Contractor (PC)

    Renfrewshire Council · Local authority · Scotland

    Incumbent: Galliford Try Construction Limited

    • Building construction work
    • Construction work
    • Secondary school construction work
    Contract value
    £229k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Jun 2027 · start not published
    Reference
    ocds-h6vhtk-02dcab
  6. Ends · in 260 daysExtension option · up to 30 Jun 2028

    Sanctuary Scheme for victims of Domestic Abuse in Milton Keynes

    Milton Keynes City Council · Local authority

    Incumbent: 24-7 Locks Ltd

    • Compulsory social security services
    • Engineering work for security installations
    • Other community, social and personal services
    Contract value
    £120k
    Annual run-rate
    £60kvalue ÷ published term
    Term
    1 Jul 2025 → 30 Jun 2027 · 1.9 yrs · up to 30 Jun 2028 with extensions
    Reference
    ocds-h6vhtk-05074c
  7. Ends · in 260 days

    PAN3380 - Installation of Public Toilets Access Control System

    Leicester City Council · Local authority · East Midlands

    Incumbent: Armson Electrical Services Ltd

    • Construction work
    Contract value
    £115k
    Annual run-rate
    £116kvalue ÷ published term
    Term
    1 Jul 2026 → 30 Jun 2027 · 11 months
    Reference
    ocds-h6vhtk-066065
  8. Ends · in 260 daysFramework re-let

    Passenger Lift Servicing and Repairs - Leeds Building Services

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: Ace Elevators Ltd

    • Lift and escalator installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £99kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-056708
  9. Ends · in 260 daysFramework re-let

    Passenger Lift Servicing and Repairs - Leeds Building Services

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: E A Foulds Ltd t/as Foulds Lifts

    • Lift and escalator installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £99kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-056708
  10. Ends · in 260 daysFramework re-let

    Passenger Lift Servicing and Repairs - Leeds Building Services

    Leeds City Council · Local authority · Yorkshire and the Humber

    Incumbent: PICKERINGS EUROPE LIMITED

    • Lift and escalator installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £99kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 30 Jun 2027 · 1.2 yrs
    Reference
    ocds-h6vhtk-056708
  11. Ends · in 261 days

    Watergate School Expansion Project 2023

    London Borough of Lewisham · Local authority · Greater London

    Incumbent: Neilcott Construction Limited

    • Building construction work
    Contract value
    £9.0m
    Annual run-rate
    —start date not published
    Term
    Ends 1 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04265d
  12. Ends · in 261 daysExtension option · up to 1 Jul 2028

    Stourbridge Main Contractor

    Greensquareaccord · West Midlands

    Incumbent: J.HARPER & SONS(LEOMINSTER)LIMITED

    • Building construction work
    • Construction work
    • Construction work for houses
    Contract value
    £3.7m
    Annual run-rate
    £3.0mvalue ÷ published term
    Term
    1 Apr 2026 → 1 Jul 2027 · 1.3 yrs · up to 1 Jul 2028 with extensions
    Reference
    ocds-h6vhtk-05992f
  13. Ends · in 261 days

    Contract for Supply and Installation of PIV at Townhill

    City & County of Swansea · Local authority · Wales (Cymru)

    Incumbent: Envirovent Limited

    • Electrical installation work
    • Electrical installation work of heating and other electrical building-equipment
    • Heating, ventilation and air-conditioning installation work
    Contract value
    £25k
    Annual run-rate
    £25kvalue ÷ published term
    Term
    1 Jul 2026 → 1 Jul 2027 · 1 yrs
    Reference
    ocds-h6vhtk-05de7e
  14. Ends · in 262 days

    Repair/replacement Footbridge, Mitton, Tewkesbury

    Tewkesbury Borough Council · Local authority

    Incumbent: Beaver Bridges Ltd

    • Architectural design services
    • Architectural, construction, engineering and inspection services
    • Construction work
    Contract value
    £377k
    Annual run-rate
    £497kvalue ÷ published term
    Term
    29 Sept 2026 → 2 Jul 2027 · 9 months
    Reference
    ocds-h6vhtk-0678fe
  15. Ends · in 265 daysFramework re-letPanel · 8 suppliers

    Lot 1 - Materials Handlers

    ESPO · Nationwide (UK)

    Panel: BALLOO HIRE CENTRE LIMITED, Clee Hill Plant Ltd, GAP Group Limited +5 more

    • Agricultural machinery
    • Compacting machinery
    • Compressors
    Contract value
    £10mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 5 Jul 2027 · start not published
    Reference
    ocds-h6vhtk-04e40c
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.