Retender radar: UK public contracts ending soon

Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

When contracts end · Repair and maintenance services
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

275 contracts end within 24 months, 424 in total · £2.0bn published GBP value, exc. VAT, in the all future end dates (framework ceilings included, not a spend forecast).

  1. Next 3 months15
  2. 3–6 months97
  3. 6–12 months55
  4. 12–24 months108

By sector, all future end dates
i

When contracts here run out.

Published contracts by their end date. No end date, not counted.

A likely retender, not a certain one.

Contracts ending in the chosen window, by category.

CPV division of the procedure; a contract with several divisions counts in each.

Contracts ending in the all future end dates

Showing 481–495

  1. Ends · in 526 daysExtension option · up to 22 Mar 2029Buyer plans to re-tender 21 Jan 2028

    Maintenance of Manual Handling Equipment

    Velindre University NHS Trust · NHS & health · Wales (Cymru)

    Incumbent: SMARTLIFT (SOUTH WALES) LTD

    • Repair and maintenance services
    Contract value
    £209k
    Annual run-rate
    £105kvalue ÷ published term
    Term
    23 Mar 2026 → 22 Mar 2028 · 1.9 yrs · up to 22 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-05da90
  2. Ends · in 530 daysFramework re-letExtension option · up to 26 Mar 2030Panel · 2 suppliers

    Framework agreement for the application of road markings.

    City & County of Swansea · Local authority · Wales (Cymru)

    Panel: Glamorgan White Lining Ltd, Nolan Road Marking Ltd

    • Construction work for highways, roads
    • Floor-screed works
    • Glass beads for road marking
    Contract value
    £800kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    27 Mar 2026 → 26 Mar 2028 · 1.9 yrs · up to 26 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-05998b
  3. Ends · in 531 days

    TD2357 - Council House Refurbishment of two existing passenger lifts (2 & 3)

    Derby City Council · Local authority · East Midlands

    Incumbent: Concept Elevators (UK) Ltd

    • Lift installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £181k
    Annual run-rate
    £109kvalue ÷ published term
    Term
    1 Aug 2026 → 27 Mar 2028 · 1.6 yrs
    Reference
    ocds-h6vhtk-0684d4
  4. Ends · in 532 days

    TD2358 - Museum & Art Gallery Refurbishment of the existing passenger lift

    Derby City Council · Local authority · East Midlands

    Incumbent: MORRIS VERMAPORT LIMITED

    • Lift installation work
    • Lift-maintenance services
    • Lifts
    Contract value
    £64k
    Annual run-rate
    £43kvalue ÷ published term
    Term
    5 Oct 2026 → 28 Mar 2028 · 1.4 yrs
    Reference
    ocds-h6vhtk-0684d1
  5. Ends · in 534 days

    Maintenance of Thermal Cyclers

    NHS Blood and Transplant · NHS & health · Nationwide (UK)

    Incumbent: Pendragon Scientific Ltd

    • Repair and maintenance services of medical equipment
    Contract value
    £286k
    Annual run-rate
    —start date not published
    Term
    Ends 30 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-039394
  6. Ends · in 535 days

    The Pan-Dorset (Bournemouth, Christchurch, Poole and Dorset) Integrated Equip for Living Service 2023

    Bournemouth, Christchurch and Poole Council · Local authority · South West England

    Incumbent: Nottingham Rehab Limited

    • Devices for the disabled
    • Medical equipments, pharmaceuticals and personal care products
    • Repair and maintenance services
    Contract value
    £100m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-02ed2a
  7. Ends · in 535 daysFramework re-letExtension option · up to 31 Mar 2030Panel · 34 suppliers

    Lot 1. Catering Equipment

    Leicestershire County Council, trading as ESPO · Local authority · Nationwide (UK)

    Panel: ABM Catering for Leisure , Airedale Catering Equipment Ltd, Alliance Disposables Ltd +31 more

    • Catering equipment
    • Catering supplies
    • Cooling and ventilation equipment
    Contract value
    £45mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Apr 2026 → 31 Mar 2028 · 1.9 yrs · up to 31 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-050f87
  8. Ends · in 535 daysFramework re-letExtension option · up to 31 Mar 2030Panel · 15 suppliers

    Lot 2. Light Catering Equipment and Catering Consumables

    Leicestershire County Council, trading as ESPO · Local authority · Nationwide (UK)

    Panel: ABM Catering for Leisure , Alliance Disposables Ltd, Bunzl UK Ltd trading as Greenham +12 more

    • Catering equipment
    • Catering supplies
    • Cooling and ventilation equipment
    Contract value
    £45mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Apr 2026 → 31 Mar 2028 · 1.9 yrs · up to 31 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-050f87
  9. Ends · in 535 daysFramework re-letExtension option · up to 31 Mar 2030Panel · 15 suppliers

    Lot 3. Maintenance Services for Catering Equipment

    Leicestershire County Council, trading as ESPO · Local authority · Nationwide (UK)

    Panel: A F & E F LIMITED, ABM Catering for Leisure , ELITE CATERING EQUIPMENT LTD +12 more

    • Catering equipment
    • Catering supplies
    • Cooling and ventilation equipment
    Contract value
    £45mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Apr 2026 → 31 Mar 2028 · 1.9 yrs · up to 31 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-050f87
  10. Ends · in 535 daysFramework re-letExtension option · up to 31 Mar 2030Panel · 17 suppliers

    Lot 4. Turnkey Kitchen Solutions

    Leicestershire County Council, trading as ESPO · Local authority · Nationwide (UK)

    Panel: ABM Catering for Leisure , Airedale Catering Equipment Ltd, COMMERCIAL APPLIANCE LIMITED (t/a CE-Tech) +14 more

    • Catering equipment
    • Catering supplies
    • Cooling and ventilation equipment
    Contract value
    £45mceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Apr 2026 → 31 Mar 2028 · 1.9 yrs · up to 31 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-050f87
  11. Ends · in 535 days

    Gas heating systems maintenance services

    East Midlands Housing Group · Housing · East Midlands

    Incumbent: Phoenix Gas Services Ltd

    • Repair and maintenance services of central heating
    Contract value
    £20m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-0419e0
  12. Ends · in 535 days

    Hard FM - Mechanical and Electrical Maintenance Services

    Royal Berkshire NHS Foundation Trust · NHS & health · South East England

    Incumbent: VEOLIA ES (UK) LIMITED

    • Mechanical and electrical engineering services
    • Repair and maintenance services of electrical and mechanical building installations
    Contract value
    £8.3m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-034928
  13. Ends · in 535 days

    Hard FM - Mechanical and Electrical Maintenance Services

    Royal Berkshire NHS Foundation Trust · NHS & health · South East England

    Incumbent: VEOLIA ES (UK) LIMITED

    • Mechanical and electrical engineering services
    • Repair and maintenance services of electrical and mechanical building installations
    Contract value
    £8.3m
    Annual run-rate
    —start date not published
    Term
    Ends 31 Mar 2028 · start not published
    Reference
    ocds-h6vhtk-034928
  14. Ends · in 535 daysFramework re-letExtension option · up to 31 Mar 2029Buyer plans to re-tender 1 Apr 2028

    Framework Agreement - Sterile Connection Devices, Consumables, Maintenance and Repair

    NHS Blood and Transplant · Central government · Nationwide (UK), Wales (Cymru), Scotland, Northern Ireland

    Incumbent: Terumo BCT Europe

    • Medical equipments
    • Miscellaneous medical devices and products
    • Repair and maintenance services of medical equipment
    Contract value
    £7.5mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 31 Mar 2028 · 1.9 yrs · up to 31 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-05a551
  15. Ends · in 535 daysFramework re-letExtension option · up to 31 Mar 2029Buyer plans to re-tender 1 Apr 2028

    Framework Agreement - Sterile Connection Devices, Consumables, Maintenance and Repair

    NHS Blood and Transplant · Central government · Nationwide (UK), Wales (Cymru), Scotland, Northern Ireland

    Incumbent: MacoPharma UK Limited

    • Medical equipments
    • Miscellaneous medical devices and products
    • Repair and maintenance services of medical equipment
    Contract value
    £7.5mceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    1 Apr 2026 → 31 Mar 2028 · 1.9 yrs · up to 31 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-05a551
How to read the radar
  • End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.