Retender radar: UK public contracts ending soon
Every contract on Find a Tender with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting — unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.
When contracts end · Architectural, construction, engineering i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
188 contracts end within 24 months, 307 in total · £869m published GBP value, exc. VAT, in the all future end dates (framework ceilings included, not a spend forecast).
By sector, all future end dates i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
A likely retender, not a certain one.
CPV division of the procedure; a contract with several divisions counts in each.
90Sewage, refuse, cleaning and environmental3,04285Health and social work services2,82160Transport services (except waste transport)1,28933Medical equipments, pharmaceuticals1,00679Business services: law, marketing, consulting87380Education and training services74345Construction work42450Repair and maintenance services424
Contracts ending in the all future end dates
Showing 136–150
- Ends · in 169 days
Ceredigion - Energy from Waste: Transport & Treatment of Residual Waste 2024
Cyngor Sir Ceredigion County Council · Local authority · Wales (Cymru)
Incumbent: LAS Recycling Ltd
- Contract value
- £7.0m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-041650
- Ends · in 169 days
Farm Advisory Service One to One
Scottish Government · Scotland
Incumbent: Ricardo AEA Ltd
- Contract value
- £6.3m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03df6b
- Ends · in 169 daysFramework re-let
Redcar Electrical Inspection Condition Reports
Beyond Housing Limited · North East England
Incumbent: BES Group Electrical
- Contract value
- £2.4mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-030219
- Ends · in 169 daysFramework re-let
Redcar Electrical Inspection Condition Reports
Beyond Housing Limited · North East England
Incumbent: Warsett Ltd
- Contract value
- £2.4mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-030219
- Ends · in 169 daysFramework re-let
Redcar Electrical Inspection Condition Reports
Beyond Housing Limited · North East England
Incumbent: Complete Electrical UK Ltd
- Contract value
- £2.4mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-030219
- Ends · in 169 days
PHASE 1 AND 2 GEOENVIRONMENTAL SURVEY FRAMEWORK 2023 - 2027
Sheffield City Council · Local authority · Yorkshire and the Humber
Incumbent: Tetra Tech Consulting Limited
- Contract value
- £2.2m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-036309
- Ends · in 169 days
PHASE 1 AND 2 GEOENVIRONMENTAL SURVEY FRAMEWORK 2023 - 2027
Sheffield City Council · Local authority · Yorkshire and the Humber
Incumbent: Concept Engineering Consultants
- Contract value
- £2.2m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-036309
- Ends · in 169 days
Maintenance of Grounds and Gardens
NHS Wales Shared Services Partnership-Procurement Services (hosted by Velindre University NHS Trust) · NHS & health · Wales (Cymru)
Incumbent: Monnmouthshire County Council
- Contract value
- £1.3m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-042581
- Ends · in 169 days
Homes for Net Zero
Department for Energy Security & Net Zero · Central government · Nationwide (UK)
Incumbent: Energy Systems Catapult Limited
- Contract value
- £1.2m
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-03ae7b
- Ends · in 169 daysFramework re-let
Scarborough Electrical Inspection Condition Reports
Beyond Housing Limited · North East England
Incumbent: BES Group Electrical
- Contract value
- £1.1mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-030219
- Ends · in 169 daysFramework re-let
Scarborough Electrical Inspection Condition Reports
Beyond Housing Limited · North East England
Incumbent: Complete Electrical UK Ltd
- Contract value
- £1.1mceiling for the whole framework
- Annual run-rate
- —ceiling, not a run-rate
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-030219
- Ends · in 169 daysExtension option · up to 30 Sept 2027
B1022 - Provision of Low Carbon Heating Upgrade at Brynteg Comprehensive School (Blocks 1, 2 and 3)
Bridgend County Borough Council · Local authority · Wales (Cymru)
Incumbent: JackWolf Group Ltd
- Contract value
- £940k
- Annual run-rate
- £1.7mvalue ÷ published term
- Term
- 14 Sept 2026 → 31 Mar 2027 · 6 months · up to 30 Sept 2027 with extensions
- Reference
ocds-h6vhtk-06b94d
- Ends · in 169 daysFramework re-letPanel · 10 suppliers
INVITATION TO TENDER FOR THE PROVISION OF CONSULTANCY SERVICES TO SUPPORT ENERGY SAVING TRUST BUSINESS ENERGY SCOTLAND (BES)
Energy Saving Trust Ltd · Scotland
Panel: Data Engineering Projects Ltd. t/a Carbon Zero UK, Gateway Consultancy Sevices Ltd, J I Currie +7 more
- Contract value
- £920kceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-05f76e
- Ends · in 169 days
Grant Lodge Integrated Design Team
Moray Council · Local authority · Scotland
Incumbent: Page \ Park
- Contract value
- £911k
- Annual run-rate
- —start date not published
- Term
- Ends 31 Mar 2027 · start not published
- Reference
ocds-h6vhtk-043408
- Ends · in 169 daysExtension option · up to 31 Mar 2030Buyer plans to re-tender 2 Jan 2030
PRP305 Servicing and Testing of Gas Pipeline and Equipment
Derbyshire County Council · Local authority · East Midlands
Incumbent: Heating & Process Engineering Services Ltd
- Contract value
- £840k
- Annual run-rate
- £1.0mvalue ÷ published term
- Term
- 1 Jun 2026 → 31 Mar 2027 · 9 months · up to 31 Mar 2030 with extensions
- Reference
ocds-h6vhtk-060dce
How to read the radar
- End date is the contract period end the buyer published on Find a Tender. Contracts without an end date are not on the radar.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
- Incumbent is the canonical supplier on the award behind the contract. A panel (several suppliers on one award) is shown as a panel — no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
- Counts are exact from the nightly projection when you filter by horizon and sector only; any other filter shows a bounded total — exact up to 1,000 contracts, an honest “1,000+” floor above that.