UK Battery Industrialisation Centre: Contract Register & Procurement Profile
Companies House: Private Limited Company·West Midlands·Coventry
Companies House11227726 ↗Websiteukbic.co.uk ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
12 awarded tenders, 17 different suppliers.
Describes the record. It is not a sign of favouritism.
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
42 Industrial machinery3 procedures · 100%31 Electrical machinery1 procedures · 33%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 3 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Contract100%(3 notices)
3 of 3 notices are Contract (100%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Open100%(3 notices)
3 of 3 notices are Open (100%).
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 3 notices across all categories, last 24 months.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Electroder | 1 | 8.3% | 0 | 2 | — |
| Robust Habicht & Heuser GmbH & Co. KG | 1 | 8.3% | 0 | 1 | — |
| AZO GmbH & Co. KG | 1 | 8.3% | 0 | 1 | — |
| ATS Applied Tech Systems | 1 | 8.3% | 0 | 1 | — |
| Binder GmbH | 1 | 8.3% | 0 | 1 | — |
| Buhler UK Ltd | 1 | 8.3% | 0 | 1 | — |
| Manz AG | 1 | 8.3% | 0 | 1 | — |
| ANSYS UK Ltd | 1 | 8.3% | 0 | 1 | — |
The three most frequent suppliers are named on 25% of 12 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 17 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
Recent procedures
Latest 27 of 27 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Facilities Management - M&E ServicesBuilding and facilities management services | Awarded / complete | 3 Jan 2025 | — |
| FPL Cylindrical Cell AssemblyElectrical machinery | Open | 3 Dec 2024 | £1 |
| FPL Vacuum Drying OvensIndustrial machinery | Open | 27 Nov 2024 | £250,000 |
| Pouch Cell EquipmentIndustrial machinery | Open | 6 Nov 2024 | £1,300,000 |
| Provision of Cleaning ServicesCleaning services | Open | 12 Aug 2024 | — |
| Provision of Cleaning ServicesCleaning services | Planned | 22 Jul 2024 | — |
| Facilities Management - M&E ServicesFacilities management services | Planned | 22 Jul 2024 | £1,000,000 |
| Electrode Notching & Stacking EquipmentIndustrial machinery | Awarded / complete | 11 Jul 2024 | £3,750,000 |
| Extrusion Mixing EquipmentIndustrial machinery | Awarded / complete | 16 May 2024 | — |
| Digital ManufacturingData services | Awarded / complete | 3 Apr 2024 | £4,000,000 |
| Big Bag Decanting EquipmentLifting and handling equipment | Awarded / complete | 29 Mar 2024 | £550,000 |
| Cell Assembly EnablerDesign and execution of research and development | Awarded / complete | 27 Feb 2024 | £650,000 |
| Slitter Equipment for UKBIC Flexible Industrialisation Line (FIL)Electrical machinery | Awarded / complete | 9 Jan 2024 | — |
| Roll to Roll EquipmentElectrical machinery | Open | 3 Nov 2023 | — |
| Construction of UKBIC Flexible Industrialisation Line and Industrial Analysis LaboratoryConstruction work for commercial buildings | Awarded / complete | 25 May 2023 | — |
| Coating and Drying Equipment for UKBIC Flexible Industrialisation Line (FIL)Electrical machinery | Awarded / complete | 15 May 2023 | — |
| Plant Resilience ChillerCooling and ventilation equipment | Awarded / complete | 25 Apr 2023 | — |
| Calender Equipment for UKBIC Flexible Industrialisation Line (FIL)Electrical machinery | Awarded / complete | 18 Apr 2023 | — |
| Cell Cycling Equipment for UKBIC Flexible Industrialisation Line (FIL)Electrical machinery | Awarded / complete | 4 Apr 2023 | — |
| Continuous Mixing Equipment for UKBIC Flexible Industrialisation Line (FIL)Electrical machinery | Open | 19 Dec 2022 | — |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 1 of 18 published contracts state an end date; those feed “Contracts ending”.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.