SSE PLC: Contract Register & Procurement Profile
Companies House: Public Limited Company·Scotland·PERTH
Companies HouseSC117119 ↗Websitesse.com ↗
i
Tenders you can still bid for.
Notices at tender stage whose deadline has not passed, counted the way the search counts them: a notice shows under every code and region it names.
i
Notices published in the last 12 months.
Counted per tender, not per lot, against the 12 months before where shown.
i
How much of this buyer’s work goes to its three most frequent suppliers.
Share of its awarded tenders that name at least one of the top three. Each tender is counted once.
28 awarded tenders, 260 different suppliers.
Describes the record. It is not a sign of favouritism.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
An end date does not confirm a new procurement.
Open notices
1 live · deadline in the future or not published · as of page build
| Notice | Deadline | Days left | Published value |
|---|---|---|---|
| SSE Transmission Marine Subsea Survey DPS | 14 Mar 2031 | 1606d | £120,000,000 |
What they buyi
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
i
What kind of work is bought here.
Notices by procurement category (CPV). A notice with several categories counts in each.
Last 24 months · CPV divisions on published procedures · a notice with several divisions counts in each
31 Electrical machinery5 procedures · 33%45 Construction work5 procedures · 33%64 Postal and telecommunications services2 procedures · 13%65 Public utilities2 procedures · 13%79 Business services: law, marketing, consulting2 procedures · 13%15 Food, drink, tobacco1 procedures · 7%24 Chemical products1 procedures · 7%34 Transport equipment and products1 procedures · 7%How they buyi
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Last 24 months · 15 notices · commercial tool and route as published on the notice, not a legal-regime claim
i
How work here is packaged.
Notices by commercial tool: a single contract, a framework, or a dynamic purchasing system.
Framework67%(10 notices)
10 of 15 notices are Framework (67%).Contract33%(5 notices)
5 of 15 notices are Contract (33%).
i
Which procedures buyers here use.
Notices by the procedure they declare: open, selective, limited or direct. Open and selective are competitions; limited and direct are not.
Selective67%(10 notices)
10 of 15 notices are Selective (67%).Limited / restricted27%(4 notices)
4 of 15 notices are Limited / restricted (27%).Open7%(1 notices)
1 of 15 notices are Open (7%).
i
How often this buyer changes a notice after publishing it.
Middle number of amendments per notice. Deadline extensions and corrections both count.
Based on 14 notices across all categories, last 24 months.
Who wins herei
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
i
Which suppliers win the most here.
Suppliers ranked by the number of tenders won, not by money. A supplier on one big framework with many call-offs does not outrank one that won many separate competitions.
All published awards naming a supplier · ranked by distinct procedures, not pounds · panel and call-off entries inflate award records
| Supplier | Procedures | Share | Last 24m | Award records | Last activity |
|---|---|---|---|---|---|
| Ensto Renley Limited | 3 | 10.7% | 1 | 5 | — |
| Hitachi Energy UK Limited | 3 | 10.7% | 1 | 3 | — |
| TE Connectivity Solutions GmbH | 2 | 7.1% | 1 | 11 | — |
| Brenntag UK Limited | 2 | 7.1% | 1 | 9 | — |
| Airedale Chemical Company Ltd | 2 | 7.1% | 1 | 6 | — |
| Power Poles Limited | 2 | 7.1% | 1 | 5 | — |
| R.J. McLeod (Contractors) LIMITED | 2 | 7.1% | 1 | 5 | — |
| Prysmian Cables & Systems Ltd | 2 | 7.1% | 1 | 4 | — |
The three most frequent suppliers are named on 18% of 28 awarded procedures (each procedure counted once, so a panel shared by several of them is not double-counted); 260 distinct suppliers hold at least one. Descriptive concentration of published awards, not a statement of preference.
Contracts endingi
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
An end date does not confirm a new procurement.
i
Contracts that finish in the next 18 months.
Published contracts with an end date in that window. No end date, not counted.
An end date does not confirm a new procurement.
Published end dates only · 3 of 682 contracts carry one · not a retender forecast
| Contract | Holder | Ends | Published value |
|---|---|---|---|
| FW Services - Electrical Inspection & Test - 0427 | Omega Red Group | 31 Mar 2027 | Not published |
Recent procedures
Latest 50 of 60 procedures where this authority buys, is the authority the work is for, or runs the procurement
| Procedure | Status | Published | Published value |
|---|---|---|---|
| Substation ECIConstruction work | Awarded / complete | 20 Oct 2026 | — |
| CO Construction - ECI AIS Substation Works – PT926/927/928 Tealing Solar – 1028Ammonium sulphate | Awarded / complete | 8 Oct 2026 | — |
| CO Supply & Install - Modular Substation Order - Achany - 0331Ammonium sulphate | Awarded / complete | 10 Sept 2026 | — |
| SGT EquipmentPower supply transformers | Awarded / complete | 25 Aug 2026 | — |
| CO Construction - LT374 Shetland 2 HVDC Cable Initial Works - Multi Site 0532Ancillary works for electricity power lines | Awarded / complete | 24 Aug 2026 | — |
| Project, Commercial & Contract ManagementProcurement consultancy services | Awarded / complete | 20 Aug 2026 | £5,000,000 |
| GIS EquipmentTransformer substation | Unsuccessful | 14 Aug 2026 | — |
| CO Services – Transmission Training Campus Lead Designer – 1127Construction work | Awarded / complete | 10 Jul 2026 | — |
| Framework for Overhead Line Construction Works - Distribution VoltagesOverhead line construction | Awarded / complete | 7 Jul 2026 | — |
| Design, Manufacture, Supply, Installation and Commissioning of DVAr at various SHEPD locationsConstruction work for electricity power lines | Awarded / complete | 1 Jul 2026 | — |
| FW Services - Offshore Structural Engineering - Multi Site 0427Engineering design services | Awarded / complete | 11 Jun 2026 | — |
| CO Services - PAMs Benchmarking Validation Modelling Post Contract Support & Portfolio Tool - Multi Site 1231Procurement consultancy services | Awarded / complete | 1 Jun 2026 | — |
| Offshore Geoscience ServicesEngineering design services | Awarded / complete | 18 May 2026 | — |
| 35000000.00Motor vehicles | Awarded / complete | 7 Jan 2026 | — |
| FW Supply & Deliver - Batteries for Priority Services Register Customers - Multi 0328Battery chargers | Awarded / complete | 30 Dec 2025 | — |
| FW Services - Offshore Mechanical Engineering - Multi Site 0427Engineering design services | Awarded / complete | 11 Dec 2025 | — |
| CO-CONSTRUCTION-SKYE REINFORCEMENT LT000091 CIVILS WORKS – 0926 (FRAMEWORK REFERENCE NO. 21920 / CALL OFF NO. ITT_5571Works for complete or part construction and civil engineering work | Awarded / complete | 5 Dec 2025 | — |
| 0Building construction work | Awarded / complete | 24 Sept 2025 | — |
| UK public contract notice 007000-2025Electricity distribution | Awarded / complete | 14 Aug 2025 | — |
| 2,606,880Power supply transformers | Awarded / complete | 6 Aug 2025 | — |
About this data
- Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
- One profile per authority. Different spellings and registration numbers of the same body are merged into this profile. It includes tenders the authority ran for other bodies and tenders run on its behalf; spend is credited to the body that pays.
- Values are published values. Award values are what the authority published, excluding VAT and framework ceilings. They are not a budget or total spend.
- Contract end dates. 3 of 682 published contracts state an end date; those feed “Contracts ending”.
- Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.