Official UK procurement notice
Village Grounds Maintenance Contract
Authority: Chobham Parish Council (Local council)
What is being bought
Published requirement descriptionVILLAGE GROUNDS MAINTENANCE CONTRACT
Period of Contract - the contract shall be in force for a period of three years, commencing on 1st June 2025 and ceasing on 31st May 2028.
Specification of work - details of the work to be completed under this contract is shown in Appendix A.
Hours of maintenance work -The maintenance work must be undertaken between the hours of 8.00am and 6.00pm Monday to Friday and must not take place on Saturdays, Sundays, or Bank Holiday Mondays, unless agreed with the Clerk due to exceptional circumstances. All work should be carried out with the minimum noise and disturbance to the public.
Execution of work - the contractor shall be required to carry out and complete the specified work within the general horticultural/ agricultural practices. The Council expects the Contractor at all time to undertake the highest standards of customer care when dealing with the general public. The Contractor shall use only approved weed killers and fertiliser and provide the Parish Administrator with the COSHH paperwork.
Managements of contract - the Parish Administrator is responsible for overseeing the day to day management of the contract.
Risk Assessments - the Contractor shall complete risk assessments schedules for the works as required by the Parish Council.
Equipment - the Contractor shall provide his own equipment and ensure that all machinery is maintained in good working order at all times. The maximum acceptable breakdown period in respect of mechanical breakdown will be 48 hours.
Standard of grass cutting - all grass must be cut cleanly and evenly, to the same height on each site without damaging the existing surface. Mowing must take place on the full area of the grass at the site, up to the paving, fencing and any other boundaries.
Frequency of grass cutting - grass cutting is to be undertaken weekly during the growing season (April - September) as per specification. Flexibility is allowed for fewer cuts when the weather is hot, on the basis that these cuts may be held over and undertaken during wetter period.
Repair of damage - should the Contractor cause any damage to Council property he must reinstate and make good any damage to the satisfaction of the Council. The Contractor shall indemnify the Council against any claim or proceedings for any injury or damage to any property or persons or animals as a result of negligence, poor workmanship or failure to notify the Council of any action likely to cause injury or damage to a third party.
Staff and Supervision - the Contractor shall ensure that at all times during the contract period, all Staff of the Contractor are properly supervised and act in accordance with the Health and Safety at Work Act of 1974 and any other acts, orders, regulations and codes of practice relating to health and safety which may apply. The Council shall request that any employee of the Contractor whose behaviour or actions is considered to be unsatisfactory, shall be removed from the contract.
Insurance - throughout the period of the contract, the Contractor shall hold Public Liability Insurance and Employers Liability Insurance (if applicable). A copy of these policies should be given the Clerk annually.
Non- completion of works - if the Contractor shall omit or fail to perform any part of the work in accordance with the specification, the Council shall require the Contractor to complete the work within 24 hours.
Breach of contract - the Council will make a written complaint to the Contractor for omission or failure to complete the specified work to a satisfactory standard. Should the Contractor receive more than two written complaints, a meeting between the Council and the Contractor shall take place to discuss appropriate remedial actions. The Council reserve the right to terminate the contract giving one months' notice if the Contractor continues to breach the contract after the meeting with the Council has taken place.
Termination of the contract - either party may terminate the Contract by giving three months' notice in writing.
Payment - the Contractor shall submit invoices to the Council on a monthly basis in arrears. The Council shall pay the Contractor's invoice within 30 days of the date of invoice
Total value (estimated)
£24,000 excluding VAT
£28,800 including VAT
Below the relevant threshold
Contract dates (estimated)
1 June 2025 to 31 May 2028
3 years
CPV: Grounds maintenance services
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Framework period
- 3 yrs from 1 Jun 2025
Published description of the framework
Section A: CHURCHYARD surrounding St Lawrence Church in Chobham High Street GU24 8AA
Area/task Requirement Timing Other notes
Grass Close cut mowing avoiding damage to headstones and similar structures
Cuttings can be left if grass less than 2inches/5cm.
Cut and clear if grass more than 2 inches/5cm 1st April to 30th September: Once a week
1st October to 31st March: mow when the grass reaches 2 inches/5cm
To strim around trees, headstones and similar structures avoiding damage.
1st April to 30th September: Once a week
1st October to 31st March: mow when the grass reaches 2 inches/5cm
Trees and Shrubbery
Clear undergrowth under the trees Once a month Be careful not to damage the spring bulb growth
Tidy shrubbery. Clear rubbish and weeds Once a month
Remove fallen branches
As necessary Report incidents to parish office
Parking area and paths Sweep and clear away debris to maintain a tidy appearance. Weekly
Apply approved moss and weedkiller Once a year
Provide COSHH paperwork As required
Cut back path edges Once a year
Paved path to be treated with Qualgex or suitable approved chemical Twice a year
Provide COSHH paperwork As required
Litter Clear all litter from the area and empty litterbins. Remove arisings from site. Once weekly Report excesses and incidents to the Parish clerk
Section B: BENHAMS CORNER, green area at junction of Vicarage Road and High Street, Chobham GU24 8LY, & CANNON CORNER, small green and war memorial at High Street Chobham
Area/task Requirement Timing Other notes
Grass
Close cut mowing
Cuttings can be left if grass less than 2inches/5cm.
Cut and clear if grass more then 2 inches/5cm 1st April to 30th September: Once a week
1st October to 31st March: mow when the grass reaches 2 inches/5cm
Cut path edges in line with natural boundaries and pathways
Once a year
Paths Sweep and clear away debris to maintain a tidy appearance
Weekly
Apply approved moss and weedkiller Twice a year
Apply Qualgex biocide or suitable alternative to brick paths to control algae Twice a year
Provide COSHH paperwork As required
Trees, Hedges & Shrubbery
Clear and remove leaves Weekly in Autumn and as needed throughout the rest of the year
Remove fallen branches As and when occurring Report incidents to the Clerk.
Cut beech hedge adjacent to museum Twice a year in July and November.
Maintain the flower bed at Benhams Corner which runs along the side of the path by the wall, keeping it weed free and trimming back plants to keep the path clear At all times
Bus Shelter Clear leaves and ivy As and when occurring
War memorial Yew bushes to be cut Twice a year in July and early November (in the week before Remembrance Day).
War Memorial for the week before Remembrance Day and afterwards
Ensure area immediately adjacent is neat and tidy.
In addition to regular mowing, the grassed area to be mown and grass clippings removed in the week before Remembrance Day. Annually
Remove tributes placed on Remembrance Day As they deteriorate, but no later than 1st March of the following year
High Street Poppies Poppies to be put up on High Street lampposts during the last week in October and taken down by the end of the first week of December every year Annually
Section C: THE LEAT, High Street, Chobham
Weekly maintenance
Area/task Requirement Timing Other notes
Grass verge To cut grass on the verge on the top of the bank. Leave a neat and well-cut finished Weekly
Bankside To strim edge of the bank overhanging the waterway to the leading edge Weekly
General To clear all leaves from the site
To remove suckers from base of trees Weekly
As required
Section D: VALLEY END WAR MEMORIAL, Valley End Road, Valley End, Chobham, GU24 8TD, opposite St Saviour Church
JUBILEE MOUNT, Chobham Common, access off Staple Hill.
VALLEY END WAR MEMORIAL
Area/task Requirement Timing Other notes
Grass
Close cut mowing
Cuttings can be left if grass less than 2inches/5cm.
Cut and clear if grass more then 2 inches/5cm 1st April to 30th September: Once a week
1st October to 31st March: mow when the grass reaches 2 inches/5cm
To strim around the posts and ditch during the dormant period, from October to March, to maintain a tidy appearance When over 2 inches/5cm high
Paths Sweep and clear away debris to maintain a tidy appearance Weekly
In addition to regular mowing, the grassed area to be mown and grass clippings removed in the week before Remembrance Day. November
Apply Qualgex biocide or suitable alternative to brick paths to control algae Twice a year
Any litter to be removed from the War Memorial site As needed
Remove tributes placed on Remembrance Day As they deteriorate, but no later than 1st March of following year
JUBILEE MOUNT
To mow grass areas and leave cuttings in situ Annually at the end of September
The lotProcurement structure
single lot · value publishedLot #1AwardedPublished value£24,000
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Lot awarding rule: AWARD CRITERIA: the following weightings will be applied Experience of public ground maintenance contracts - two references required 50% Value for money - 30% Local contractors - 10 miles radius from Chobham 20%
- “Village Grounds Maintenance Contract” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.
Procedure terms & legal framework
From the official record- Procedure method
- Below threshold - open competition
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Below threshold
- Regulatory regime
- Light touch regime
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 27 Mar 2025, 14:34 GMT
- Last source update
- 18 Sept 2025, 15:13 BST
- Authority reference
Village Maintenance contract CPC- FTS notice number
2025/S 000-011584- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-04f995Find a Tender
- Reserved participation area
- E10000030
How it was run
Official notice- Appointment period ends
- 9 May 2025, 23:59 BST
- Electronic submission
- Not allowed
Timeline
27 Mar 2025 → 18 Sept 2025 · 4 dates- Tender notice published27 Mar 2025, 14:34 GMT
- Admission / appointment period endsperiod end, not a bid countdown9 May 2025, 23:59 BST
- Contract starts1 Jun 2025, 00:00 BST
- Latest notice published397 days ago18 Sept 2025, 15:13 BST
Notice history
3 events · 2 releases on Find a Tender · since 27 Mar 2025- Tender notice published27 Mar 2025, 14:34 GMTUK4
- Contract details notice published18 Sept 2025, 15:13 BSTUK7
- Status changed to complete18 Sept 2025, 15:13 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Village Grounds Maintenance Contract
- Signed
- 30 May 2025
- Value
- £24,000
- Period
- 1 Jun 2025 – 31 May 2028
- Status
- active
Contracting authority & participating public bodies
Framework contractors & participating bidders
1 commercial party on the notice- MK Landscape ConstructionFramework contractor
Official documents & specifications (3)
Official links; attachments are not copiedTender pack and attachments
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Tender notice Tender notice on Find a Tender