Find a TenderAwardedContract details notice
Published 27 Mar 2025, 14:34 GMT

Official UK procurement notice

Village Grounds Maintenance Contract

Official notice

Authority: Chobham Parish Council (Local council)

Framework agreementServicesBelow threshold - open competitionBelow thresholdLight touch regimeReserved: E10000030SME suitable
Framework ceiling (notional)£24,000framework ceiling, not attributable revenue
Submissions closed 9 May 2025awarded 30 May 2025
Framework period 3 yrsends 31 May 2028 · starts 1 Jun 2025

What is being bought

Published requirement description

VILLAGE GROUNDS MAINTENANCE CONTRACT

Period of Contract - the contract shall be in force for a period of three years, commencing on 1st June 2025 and ceasing on 31st May 2028.

Specification of work - details of the work to be completed under this contract is shown in Appendix A.

Hours of maintenance work -The maintenance work must be undertaken between the hours of 8.00am and 6.00pm Monday to Friday and must not take place on Saturdays, Sundays, or Bank Holiday Mondays, unless agreed with the Clerk due to exceptional circumstances. All work should be carried out with the minimum noise and disturbance to the public.

Execution of work - the contractor shall be required to carry out and complete the specified work within the general horticultural/ agricultural practices. The Council expects the Contractor at all time to undertake the highest standards of customer care when dealing with the general public. The Contractor shall use only approved weed killers and fertiliser and provide the Parish Administrator with the COSHH paperwork.

Managements of contract - the Parish Administrator is responsible for overseeing the day to day management of the contract.

Risk Assessments - the Contractor shall complete risk assessments schedules for the works as required by the Parish Council.

Equipment - the Contractor shall provide his own equipment and ensure that all machinery is maintained in good working order at all times. The maximum acceptable breakdown period in respect of mechanical breakdown will be 48 hours.

Standard of grass cutting - all grass must be cut cleanly and evenly, to the same height on each site without damaging the existing surface. Mowing must take place on the full area of the grass at the site, up to the paving, fencing and any other boundaries.

Frequency of grass cutting - grass cutting is to be undertaken weekly during the growing season (April - September) as per specification. Flexibility is allowed for fewer cuts when the weather is hot, on the basis that these cuts may be held over and undertaken during wetter period.

Repair of damage - should the Contractor cause any damage to Council property he must reinstate and make good any damage to the satisfaction of the Council. The Contractor shall indemnify the Council against any claim or proceedings for any injury or damage to any property or persons or animals as a result of negligence, poor workmanship or failure to notify the Council of any action likely to cause injury or damage to a third party.

Staff and Supervision - the Contractor shall ensure that at all times during the contract period, all Staff of the Contractor are properly supervised and act in accordance with the Health and Safety at Work Act of 1974 and any other acts, orders, regulations and codes of practice relating to health and safety which may apply. The Council shall request that any employee of the Contractor whose behaviour or actions is considered to be unsatisfactory, shall be removed from the contract.

Insurance - throughout the period of the contract, the Contractor shall hold Public Liability Insurance and Employers Liability Insurance (if applicable). A copy of these policies should be given the Clerk annually.

Non- completion of works - if the Contractor shall omit or fail to perform any part of the work in accordance with the specification, the Council shall require the Contractor to complete the work within 24 hours.

Breach of contract - the Council will make a written complaint to the Contractor for omission or failure to complete the specified work to a satisfactory standard. Should the Contractor receive more than two written complaints, a meeting between the Council and the Contractor shall take place to discuss appropriate remedial actions. The Council reserve the right to terminate the contract giving one months' notice if the Contractor continues to breach the contract after the meeting with the Council has taken place.

Termination of the contract - either party may terminate the Contract by giving three months' notice in writing.

Payment - the Contractor shall submit invoices to the Council on a monthly basis in arrears. The Council shall pay the Contractor's invoice within 30 days of the date of invoice

Total value (estimated)

£24,000 excluding VAT

£28,800 including VAT

Below the relevant threshold

Contract dates (estimated)

1 June 2025 to 31 May 2028

3 years

CPV: Grounds maintenance services

How this framework works

From the published notice
Type
Closed framework
Call-offs
call-offs may be awarded directly or by further competition
Framework period
3 yrs from 1 Jun 2025
Published description of the framework

Section A: CHURCHYARD surrounding St Lawrence Church in Chobham High Street GU24 8AA

Area/task Requirement Timing Other notes

Grass Close cut mowing avoiding damage to headstones and similar structures

Cuttings can be left if grass less than 2inches/5cm.

Cut and clear if grass more than 2 inches/5cm 1st April to 30th September: Once a week

1st October to 31st March: mow when the grass reaches 2 inches/5cm

To strim around trees, headstones and similar structures avoiding damage.

1st April to 30th September: Once a week

1st October to 31st March: mow when the grass reaches 2 inches/5cm

Trees and Shrubbery

Clear undergrowth under the trees Once a month Be careful not to damage the spring bulb growth

Tidy shrubbery. Clear rubbish and weeds Once a month

Remove fallen branches

As necessary Report incidents to parish office

Parking area and paths Sweep and clear away debris to maintain a tidy appearance. Weekly

Apply approved moss and weedkiller Once a year

Provide COSHH paperwork As required

Cut back path edges Once a year

Paved path to be treated with Qualgex or suitable approved chemical Twice a year

Provide COSHH paperwork As required

Litter Clear all litter from the area and empty litterbins. Remove arisings from site. Once weekly Report excesses and incidents to the Parish clerk

Section B: BENHAMS CORNER, green area at junction of Vicarage Road and High Street, Chobham GU24 8LY, & CANNON CORNER, small green and war memorial at High Street Chobham

Area/task Requirement Timing Other notes

Grass

Close cut mowing

Cuttings can be left if grass less than 2inches/5cm.

Cut and clear if grass more then 2 inches/5cm 1st April to 30th September: Once a week

1st October to 31st March: mow when the grass reaches 2 inches/5cm

Cut path edges in line with natural boundaries and pathways

Once a year

Paths Sweep and clear away debris to maintain a tidy appearance

Weekly

Apply approved moss and weedkiller Twice a year

Apply Qualgex biocide or suitable alternative to brick paths to control algae Twice a year

Provide COSHH paperwork As required

Trees, Hedges & Shrubbery

Clear and remove leaves Weekly in Autumn and as needed throughout the rest of the year

Remove fallen branches As and when occurring Report incidents to the Clerk.

Cut beech hedge adjacent to museum Twice a year in July and November.

Maintain the flower bed at Benhams Corner which runs along the side of the path by the wall, keeping it weed free and trimming back plants to keep the path clear At all times

Bus Shelter Clear leaves and ivy As and when occurring

War memorial Yew bushes to be cut Twice a year in July and early November (in the week before Remembrance Day).

War Memorial for the week before Remembrance Day and afterwards

Ensure area immediately adjacent is neat and tidy.

In addition to regular mowing, the grassed area to be mown and grass clippings removed in the week before Remembrance Day. Annually

Remove tributes placed on Remembrance Day As they deteriorate, but no later than 1st March of the following year

High Street Poppies Poppies to be put up on High Street lampposts during the last week in October and taken down by the end of the first week of December every year Annually

Section C: THE LEAT, High Street, Chobham

Weekly maintenance

Area/task Requirement Timing Other notes

Grass verge To cut grass on the verge on the top of the bank. Leave a neat and well-cut finished Weekly

Bankside To strim edge of the bank overhanging the waterway to the leading edge Weekly

General To clear all leaves from the site

To remove suckers from base of trees Weekly

As required

Section D: VALLEY END WAR MEMORIAL, Valley End Road, Valley End, Chobham, GU24 8TD, opposite St Saviour Church

JUBILEE MOUNT, Chobham Common, access off Staple Hill.

VALLEY END WAR MEMORIAL

Area/task Requirement Timing Other notes

Grass

Close cut mowing

Cuttings can be left if grass less than 2inches/5cm.

Cut and clear if grass more then 2 inches/5cm 1st April to 30th September: Once a week

1st October to 31st March: mow when the grass reaches 2 inches/5cm

To strim around the posts and ditch during the dormant period, from October to March, to maintain a tidy appearance When over 2 inches/5cm high

Paths Sweep and clear away debris to maintain a tidy appearance Weekly

In addition to regular mowing, the grassed area to be mown and grass clippings removed in the week before Remembrance Day. November

Apply Qualgex biocide or suitable alternative to brick paths to control algae Twice a year

Any litter to be removed from the War Memorial site As needed

Remove tributes placed on Remembrance Day As they deteriorate, but no later than 1st March of following year

JUBILEE MOUNT

To mow grass areas and leave cuttings in situ Annually at the end of September

The lotProcurement structure

single lot · value published
Lot #1Awarded 3 yrsSMEPublished value£24,000
Contract period: 1 Jun 2025 – 31 May 2028 (3 yrs)Value: £24,000 exc. VAT · £28,800 inc. VAT

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored

Lot awarding rule: AWARD CRITERIA: the following weightings will be applied Experience of public ground maintenance contracts - two references required 50% Value for money - 30% Local contractors - 10 miles radius from Chobham 20%

What this means for your bid
  • “Village Grounds Maintenance Contract” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.

Procedure terms & legal framework

From the official record
Procedure method
Below threshold - open competition
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Services
Notice status
Awarded
Procurement threshold
Below threshold
Regulatory regime
Light touch regime
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
27 Mar 2025, 14:34 GMT
Last source update
18 Sept 2025, 15:13 BST
Authority reference
Village Maintenance contract CPC
FTS notice number
2025/S 000-011584
Latest notice
Contract details notice (UK7)
Classification (CPV)
Grounds maintenance services
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+1 moreSouth West (UKK)
Official registry OCID
ocds-h6vhtk-04f995 Find a Tender
Contract terms
Reserved participation area
E10000030

How it was run

Official notice
Appointment period ends
9 May 2025, 23:59 BST
Electronic submission
Not allowed
Detailed submission instructions & authority contactsFrom official release

Chobham Parish Council

Station Road

Chobham

GU24 8AJ

email [email protected]

Timeline

27 Mar 2025 → 18 Sept 2025 · 4 dates
  1. Tender notice published
    27 Mar 2025, 14:34 GMT
  2. Admission / appointment period endsperiod end, not a bid countdown
    9 May 2025, 23:59 BST
  3. Contract starts
    1 Jun 2025, 00:00 BST
  4. Latest notice published397 days ago
    18 Sept 2025, 15:13 BST

Notice history

3 events · 2 releases on Find a Tender · since 27 Mar 2025
  1. Tender notice published
    27 Mar 2025, 14:34 GMT
    UK4
  2. Contract details notice published
    18 Sept 2025, 15:13 BST
    UK7
  3. Status changed to complete
    18 Sept 2025, 15:13 BST

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast

1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

  • Village Grounds Maintenance Contract

    Signed
    30 May 2025
    Value
    £24,000
    Period
    1 Jun 2025 – 31 May 2028
    Status
    active

Contracting authority & participating public bodies

Chobham Parish Council

Contracting authorityPublic authority - sub-central government GB-PPON: PYPP-5317-VXRD Chobham Pavilion, Chobham Recreation Ground, Station Road, Chobham, Woking, South East, GU24 8AJContact name, email

Framework contractors & participating bidders

1 commercial party on the notice
  • MK Landscape ConstructionFramework contractor 9 Oakdene, Chobham, Woking, South East, GU24 8PSContact email

Official documents & specifications (3)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Contract details notice contractContract details noticeUK7Contract details notice on Find a Tender
  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender