Find a TenderClosedTender notice
Published 6 May 2026, 23:23 BST

Official UK procurement notice

Refurbishment of Public Toilet Block (2 cubicles)

Official notice

Authority: St Buryan Lamorna Parish Council (Local council)

3 lotsWorksBelow threshold - open competitionBelow thresholdReserved: K02000001SME suitable
Published estimate£9,000total for 3 lots · £10,800 inc. VAT
Submissions closed 29 May 2026
Lots 3see the lot list below
Contract term 2 moends 31 Aug 2026 · up to 30 Sept 2026 with extensions · starts 22 Jun 2026

What is being bought3 lots · detail below

Published requirement description

St Buryan, Lamorna & Paul Parish Council is seeking to refurbish the existing public toilets in St Buryan, Galligan Lane, located behind the book swap / bus shelter.

The toilets are the only public toilets in the area and are frequently used by delivery drivers, trades workers, walkers and local residents.

The structure of the building is sound and the toilets are broadly in working order, however refurbishments are needed to improve the facilities. The aim is to provide a facility suitable for all users but which will be resistant to vandalism, a problem at this facility.

The Parish Council would be pleased to receive quotations for the following scope of work. Quotes can be provided for all works, or contractors may quote for one or more elements (plumbing, electrical, general building).

Please submit your quotation and supporting documents to: [email protected] by 5.00pm on Friday 29 May 2026

Works (supply and installation, material costs and labour)

Cost (ex VAT)

Plumbing

Drainage: Assess the current drainage arrangement and quote to carry out works to correct/improve the flow if needed.

Drainage: Assess the current plumbing arrangement and quote to carry out works to correct/improve if needed.

Toilet pans: replace the existing toilet pans with vandal-resistant toilet pans, including integral toilet seats and robust materials.

Plumbing & Electrical

Removal of 2 x Wallgate units (single unit for soap, wash, dry)

Install hand basin with sensor activated tap. Design - vandal resistant. 2 basins, one for each unit.

Notes - height 740mm at top of basin.

To be located on the wall where the Wallgate unit is currently (basin to be located in proximity to the WC, to be able to be used from seated, if possible)

Size, to be able to accommodate hand washing.

Install soap dispenser, to be sensor activated if possible. 2 soap dispensers, one to be located to the side of the basin in each of the units. Potential for the dispenser to be sensor activated and the soap reservoir / filling to be in the service cupboard.

Electrical

Supply and installation of hand drier - 1 in each unit. Height from floor: 1,000 mm

Supply and installation of water heater - either two (one for each unity) or one to serve both. Potential to be located in service cupboard. Must have max temperature limiter.

Upgrade the light fittings to LED, if they are not already LED.

Check that that electrical systems are fit for purpose, and quote for provision of works to bring to standard, if needed.

Building works

Doors to cubicles:

  • Replace locks (current locks are linked to the coin operated entrance system, now defunct) New locks to be vandal-resistant.
  • New door handles and the internal lock to be accessibility compliant, and for contractor / emergency services to be able to access a locked unit in case of emergency.
  • Make good the woodwork, light sand, prime, undercoat and topcoat with hard wearing gloss or satin paint.
  • Fit a hasp for a padlock

Walls

  • Repair / replace wall tiles, grouting where necessary
  • Make good and seal the join between wall and floors.

Toilet pans

  • Replace existing with vandal-resistant toilet pans. Flush mechanism also to have vandal-proof design and materials.

Accessibility -

Supply and fit handrails to meet Regulation M accessibility standards.

Additional notes

  • Where costs for options have been requested, the Council will decide on how to proceed based on budgetary constraints
  • This public toilet facility is prone to vandalism, suitable hard-wearing products are essential
  • Proposed products should be clearly presented with detailed specifications
  • It is strongly recommended that a site survey is undertaken prior to quote. This can be arranged via the Clerk. At time of issuing the invitation to quote, the left hand unit is open for public use and can be viewed at any time
  • An asbestos survey will be carried out, and if there is any asbestos present, contractors will be notified.
  • It is understood that a building regulations application is not needed as the works are replacement of existing facilities
  • Proof of Public Liability insurance to be provided by all contractors and subcontractors, also Employer liability insurance where applicable
  • All certificates required (eg electrical works) to be provided by all contractors and subcontractors
  • Risk Assessments and Method Statements to be provided by all contractors - contact the Clerk to discuss if needed.
  • If the contractor has not previously worked for the Parish Council, three references to be provided
  • Please state estimated start date for work and anticipated timescale for completion

Evaluation criteria:

  1. Quality and durability of products specified; evidence of experience and timescale for completion: 20%
  2. Cost: 80%

The Council is not obliged to accept the lowest quote

The Council will not cover any costs associated with any tender, quote or estimate.

The Council may request further information.

Scoring for evaluation:

Has the contractor supplied correct insurance documents? Pass / Fail

References, warranty on works and materials, comply with the brief? 10%

Start date and timescale for completion

20%

Price

70%

Issued by Clerk/RFO - 2 May 2026

CPV: Electrical wiring and fitting work · Miscellaneous building structures · Plumbing and sanitary works

Lots and requirements (3)Procurement structure

3 lots · all with a published value (£9,000 together) · same evaluation weights on every lot
Lot #1Plumbing elementRenewal 2 moSMEPublished value£6,000

The works include plumbing, electrical and general building works. Contractors are invited to submit a quote for one, two or three of these three elements.

Contract period: 22 Jun 2026 – 31 Aug 2026 (2 mo) · up to 30 Sept 2026 with extensionsValue: £6,000 exc. VAT · £7,200 inc. VAT
Extensions: Possible delay due to August summer holiday period potentially slowing works. It is not anticipated that this will be a problem.
Lot #2Electrical worksRenewal 2 moSMEPublished value£1,500

The works include electrical, plumbing and general building works. Contractors are invited to submit a quote for one, two or three of these three elements.

Contract period: 22 Jun 2026 – 31 Aug 2026 (2 mo) · up to 30 Sept 2026 with extensionsValue: £1,500 exc. VAT · £1,800 inc. VAT
Extensions: Possible delay due to August summer holiday period potentially slowing works. It is not anticipated that this will be a problem.
Lot #3General building worksRenewal 2 moSMEPublished value£1,500

The works include general building works, plumbing and electrical works. Contractors are invited to submit a quote for one, two or three of these three elements.

Contract period: 22 Jun 2026 – 31 Aug 2026 (2 mo) · up to 30 Sept 2026 with extensionsValue: £1,500 exc. VAT · £1,800 inc. VAT
Extensions: Possible delay due to August summer holiday period potentially slowing works. It is not anticipated that this will be a problem.

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
How bids were scored · same split on all 3 lots
Quality: 20%Price: 80%
Published sub-criteria (2)
  • 1. Quality and durability of products specified; evidence of experience and timescale for completion: 20%
  • Cost: 80%
Published award criteria (2)
  • 1. Quality and durability of products specified; evidence of experience and timescale for completion
  • Cost: The Council is not obliged to accept the lowest quote The Council will not cover any costs associated with any tender, quote or estimate. The Council may request further information. Scoring for evaluation: Has the contractor supplied correct insurance documents? Pass / Fail References, warranty on works and materials, comply with the brief? 10% Start date and timescale for completion 20% Price 70%
What this means for your bid
  • Price carries 80 of 100 points: a 10% discount moves about 8 points. This one is won on the number: sharpen the price before polishing the prose.

Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.

Procedure terms & legal framework

From the official record
Procedure method
Below threshold - open competition
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Works
Notice status
Closed
Procurement threshold
Below threshold
Regulatory regime
Standard
Commercial structure
Stand-alone contract (no framework)
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
6 May 2026, 23:23 BST
Last source update
6 May 2026, 23:23 BST
FTS notice number
2026/S 000-041650
Latest notice
Tender notice (UK4)
Classification (CPV)
Electrical wiring and fitting workMiscellaneous building structuresPlumbing and sanitary works
Delivery area
North East (UKC)North West (UKD)Yorkshire & Humber (UKE)East Midlands (UKF)West Midlands (UKG)East of England (UKH)London (UKI)South East (UKJ)
+1 moreSouth West (UKK)
Official registry OCID
ocds-h6vhtk-0692b6 Find a Tender
Contract terms
Reserved participation area
K02000001

How it was run

Official notice
Run through: portal not identified
Electronic submission allowed
Submission deadline
29 May 2026, 17:00 BST
Submission channel
Official e-sourcing portal
Electronic submission
Allowed
Detailed submission instructions & authority contactsFrom official release

Timeline

6 May 2026 → 22 Jun 2026 · 3 dates
  1. Tender notice published169 days ago
    6 May 2026, 23:23 BST
  2. Submission deadline146 days ago
    29 May 2026, 17:00 BST
  3. Contract starts123 days ago
    22 Jun 2026, 00:00 BST

Notice history

1 event · 1 release on Find a Tender
  1. Tender notice published
    6 May 2026, 23:23 BST
    UK4

Contracting authority & participating public bodies

St Buryan Lamorna Parish Council

Contracting authorityPublic authority - sub-central government GB-PPON: PMRR-6985-GDJY c/o 19 Carnhell Road, Gwinear, Hayle, South West, TR27 5LBContact name, email, phone

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

Notices published for this procedure

  • Tender notice tenderTender noticeUK4Tender notice on Find a Tender