Official UK procurement notice
NHS SBS BUILDING SAFETY AND FIRE COMPLIANCE FRAMEWORK
Authority: NHS Shared Business Services Limited (NHS & healthcare)
What is being bought13 lots · detail below
Published requirement descriptionNHS Shared Business Services Limited (NHS SBS) act in an Agency capacity for and on behalf of its customers (Approved Organisations) - existing and new. These comprise of NHS and Social Care organisations (whether acting individually, or on behalf of, or together as members of any consortia) along with any other public or private sector bodies which NHS SBS authorises to use the resulting Framework Agreement.
Our Approved Organisation list can be found on:
www.sbs.nhs.uk/services/framework-a… ↗
NHS Shared Business Services intends to put in place a Framework Agreement for the provision of Building Safety and Fire Compliance goods and services to be used by NHS SBS Approved Organisations. It includes the following specialised Lots:
Lot 1: Fire Safety -
Lot 1.1: Passive Fire Safety
Lot 1.2: Active Fire Safety
Lot 1.3: Fire Risk Assessments and Consultancy Services
Lot 2: Asbestos -
Lot 2.1: Asbestos Management
Lot 2.2: Asbestos Removal
Lot 3: Lifts - Maintenance, Design, and Installation
Lot 4: Legionella and Water Treatment Services
Lot 5: PAT Testing
Lot 6: Authorising Engineers
Lot 7: Pneumatic Tube Systems - Maintenance, Design, and Installation
NHS SBS is committed to working with Suppliers who are dedicated to Sustainability and Social Value and there will be a significant weighting on these elements within the Invitation to Tender.
CPV: Advisory and consultative engineering services · Asbestos removal services · Asbestos-removal work · Electrical services · Engineering support services · Environmental engineering consultancy services · Fire blankets · Fire extinguishers · Fire suppression foam or similar compounds · Fire suppression system · Fire-alarm system installation work · Fire-alarm systems · +14 more
How this framework works
From the published notice- Bids received
- 28 bids on the busiest of 10 lots · 101 suppliers appointed
Lots and requirements (13)Procurement structure
13 lots · no lot values published · same evaluation weights on every lotLot #1Lifts - Maintenance, Design, and InstallationAwarded
This Lot involves the provision of planned and reactive maintenance of lifts, and the design and installation of lifts.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 3 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #2Legionella and Water Treatment ServicesAwarded
This Lot involves the provision of water treatment and legionella management.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 4 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #3PAT TestingAwarded
This Lot involves the provision of PAT testing services.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 5 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #4Authorising EngineersAwarded
This Lot involves the provision of authorising engineers for applicable disciplines.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 6 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #5Pneumatic Tube Systems - Maintenance, Design, and InstallationAwarded
This Lot involves the provision of planned and reactive maintenance of pneumatic tube systems, and the design and installation of pneumatic tube systems.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 7 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #6Fire Safety - Passive Fire SafetyAwarded
This Lot involves the supply, installation, and maintenance of passive fire safety systems.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 1.1 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #7Fire Safety - Active Fire SafetyAwarded
This Lot involves the supply, installation, maintenance, and monitoring of active fire safety systems and equipment.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 1.2 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #8Fire Safety - Fire Risk Assessments and Consultancy ServicesAwarded
This Lot involves the provision of risk assessments, consultancy services, design, surveys, and audits related to fire.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 1.3 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #9Fire Safety - TrainingPlanned
Provision of fire safety training. Additional information: Please see description in the main contract objective on the Request for Information (RFI). Further Lots may be defined as an outcome of this initial market engagement PIN. The new Framework Agreement, subject to review and change, is expected to go live during Q3 2024.
Please see the link at section I.3 above for instructions on how to participate and submit responses to the RFI.
Lot #10Asbestos - Asbestos ManagementAwarded
This Lot involves the provision of surveys, inspections, sampling, monitoring, and emergency response related to asbestos.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 2.1 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #11Asbestos - Asbestos RemovalAwarded
This Lot involves the removal of asbestos.
Bidders will deliver all the mandatory requirements as detailed in the Specification schedule of the Framework Agreement.
There are additional Selection Qualification (SQ) and Award Questionnaire (AQ) requirements, and Bidder Declarations which are applicable, and Bidders are asked to respond to these also.
A Framework Agreement will be awarded to a maximum of 25 Bidders for Lot 2.2 in each of the following regions: 1. Rest of the UK, and 2. London and the South East.
For all Lots, the maximum number of Bidders may increase where 2 or more Bidders have tied scores in last awardable position for the Lot. Additionally, NHS SBS reserves the right to award to any Bidder whose final score is within 1% of the last awardable position of the Lot.
Lot #12Lifts - MaintenancePlanned
Provision of planned and reactive maintenance. Additional information: Please see description in the main contract objective on the Request for Information (RFI). Further Lots may be defined as an outcome of this initial market engagement PIN. The new Framework Agreement, subject to review and change, is expected to go live during Q3 2024.
Please see the link at section I.3 above for instructions on how to participate and submit responses to the RFI.
Lot #13Lifts - Design and InstallationPlanned
Design and installation of lifts. Additional information: Please see description in the main contract objective on the Request for Information (RFI). Further Lots may be defined as an outcome of this initial market engagement PIN. The new Framework Agreement, subject to review and change, is expected to go live during Q3 2024.
Please see the link at section I.3 above for instructions on how to participate and submit responses to the RFI.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published award criteria (3)
- Quality: 60
- Social Value: 10
- Price: 30
- Suitability
Selection criteria as stated in the procurement documents
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “NHS SBS BUILDING SAFETY AND FIRE COMPLIANCE FRAMEWORK” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record · publisher note attached- Procedure method
- Open procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- No (one-off requirement)
- First published
- 30 Aug 2023, 14:19 BST
- Last source update
- 31 Jul 2025, 08:58 BST
- Award evaluation window
- 26 Jul 2024 – …
- Authority reference
SBS10509- FTS notice number
2025/S 000-044547- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-03f809Find a Tender
Publisher note: The Framework Agreement procurement was undertaken as an Open Procedure. The Framework Agreement will commence on 17/02/2025 and end on 16/02/2025. The contract will be awarded for 48 months. Some purchases under this Framework Agreement may have requirements that can be met under this Framework Agreement but the purchase of which may be exempt from the Procurement Regulations. In such cases, Call-off Contracts from this Framework will be unregulated purchases for the purposes of the Procurement Regulations, and Approved Organisations may, at their discretion, modify the terms and conditions of any Call-off Contracts to reflect that Approved Organisation's specific needs.
How it was run
Official notice- Appointment period ends
- 26 Jul 2024, 12:00 BST
- Submission channel
- {"electronicSubmission"}
- Accepted languages
- en
- Bid validity
- 180 days from the deadline
- Bids opened
- 26 Jul 2024, 13:00 BST
Timeline
21 Feb 2024 → 31 Jul 2025 · 4 dates- Next notice expected21 Feb 2024
- Admission / appointment period endsperiod end, not a bid countdown26 Jul 2024, 12:00 BST
- Bids opened26 Jul 2024, 13:00 BST
- Notice published31 Jul 2025, 08:58 BST
Notice history
4 events · 3 releases on Find a Tender · since 14 Jun 2024- Status changed to active14 Jun 2024, 16:33 BST
- Procurement method changed14 Jun 2024, 16:33 BST
- Deadline published: 26 Jul 2024, 12:00 BST14 Jun 2024, 16:33 BST
- Status changed to complete31 Jul 2025, 08:58 BST
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast135 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
All 20 of these contracts carry the same published figure, £200,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.
Fire Safety - Passive Fire Safety
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Fire Safety - Passive Fire Safety
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Asbestos Removal
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Fire Safety - Passive Fire Safety
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Lifts - Maintenance, Design, and Installation
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Lifts - Maintenance, Design, and Installation
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Legionella and Water Treatment Services
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Legionella and Water Treatment Services
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Legionella and Water Treatment Services
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Legionella and Water Treatment Services
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Legionella and Water Treatment Services
- Signed
- 17 Jun 2025
- Value
- ceiling above
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Lifts - Maintenance, Design, and Installation | 3bids · 3 electronic | 2 | — | — |
| 2 · Legionella and Water Treatment Services | 15bids · 15 electronic | 12 | — | — |
| 3 · PAT Testing | 8bids · 8 electronic | 5 | — | — |
| 4 · Authorising Engineers | 6bids · 6 electronic | 4 | — | — |
| 5 · Pneumatic Tube Systems - Maintenance, Design, and Installation | 3bids · 3 electronic | 3 | — | — |
| 6 · Fire Safety - Passive Fire Safety | 27bids · 27 electronic | 21 | — | — |
| 7 · Fire Safety - Active Fire Safety | 20bids · 20 electronic | 14 | — | — |
| 8 · Fire Safety - Fire Risk Assessments and Consultancy Services | 25bids · 25 electronic | 14 | — | — |
| 10 · Asbestos - Asbestos Management | 28bids · 28 electronic | 21 | — | — |
| 11 · Asbestos - Asbestos Removal | 23bids · 23 electronic | 20 | — | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
101 commercial parties on the notice · 50 awardedThe first 50 of 101 commercial parties (by name); the JSON mirror lists them all.
- ABCA Systems LimitedFramework contractor
- AES Electrical & Compliance Services LtdFramework contractor
- Acorn Analytical Services LimitedFramework contractor
- Airborne Environmental Consultants LtdFramework contractor
- Airtube Technologies LtdFramework contractor
- Amstech Group LimitedFramework contractor
- Aqua Protec LtdFramework contractor
- Asbestech LtdFramework contractor
- Asbestos Control and Treatment LtdFramework contractor
- Asbestos Survey and Management LtdFramework contractor
Show 40 more suppliers
- Ascendant Lifts LtdFramework contractor
- Aspect Contracts LtdFramework contractor
- AtkinsRealis PPS LimitedFramework contractor
- Ayerst Environmental LtdFramework contractor
- BB7 Consulting LimitedFramework contractor
- BLS Asbestos LimitedFramework contractor
- Bardon Environmental LimitedFramework contractor
- Briggs Fire and Security LtdFramework contractor
- CLC Contractors LimitedFramework contractor
- Casa Environmental Services LtdFramework contractor
- Checkmate Fire Solutions LimitedFramework contractor
- Chirmarn LimitedFramework contractor
- Chubb Fire & Security LtdFramework contractor
- Churches Fire Security LimitedFramework contractor
- Clifford Devlin LimitedFramework contractor
- DB Fire Solutions LtdFramework contractor
- DRLC LtdFramework contractor
- Danacom LtdFramework contractor
- Drax UK LimitedFramework contractor
- EFT Systems LtdFramework contractor
- Emchia Asbestos Solutions LimitedFramework contractor
- Envirocure LimitedFramework contractor
- Environmental Essentials LtdFramework contractor
- Environtec LimitedFramework contractor
- Erith Contractors LtdFramework contractor
- Eta Projects LtdFramework contractor
- European Asbestos ServicesFramework contractor
- Fieldway Supplies LimitedFramework contractor
- Firesec Compliance LimitedFramework contractor
- Frankham Consultancy Group LimitedFramework contractor
- Full Circle Compliance LtdFramework contractor
- Guildmore LimitedFramework contractor
- HBE Healthy Buildings Ireland LtdFramework contractor
- Harmony Fire LimitedFramework contractor
- Hughes and Associates Property Services LtdFramework contractor
- Hydraclean LtdFramework contractor
- Hydro-X Water Treatment LtdFramework contractor
- Hydrock Consultants LtdFramework contractor
- IFI Group LtdFramework contractor
- Inspectas Compliance LtdFramework contractor
Official documents & specifications (2)
Official links; attachments are not copiedTender pack and attachments
- Economic and financial selection criteria
- Technical selection criteria