Find a TenderPlanned procurementPipeline notice
Published 22 May 2026, 15:11 BST

Official UK procurement notice

HE Data Centre Equipment and Infrastructure Framework 2028

Authority: University of Leeds (Education)·Consortium: 6 public authorities

Framework agreementGoodsOpen procedureAbove threshold
Planned pipeline value£30,000,000pipeline notice, not a live tender
Tender notice expected 1 Jun 2027from the planned procurement notice
Framework period 2 yrsends 13 Feb 2030 · up to 13 Feb 2032 with extensions · starts 14 Feb 2028

What is being bought

Published requirement description

North Eastern Universities Purchasing Consortium Ltd (NEUPC) is one of six UK Higher Education purchasing consortia established to deliver and manage a wide range of collaborative framework agreements designed to maximise third party expenditure within the higher education sector. NEUPC wishes to develop a national framework agreement to service the requirements of UK Higher Education Institutions and Associate members for the supply of Data Centre equipment and infrastructure through the setting up of a Framework Agreement. The draft scope includes a range of data centre management equipment and infrastructure including but not limited to Uninterrupted Power Supplies (UPS), cooling equipment, generators, gas & fire suppression systems, power distribution units (PDU’s), blanking panels, caging. Any or all elements of the supply, Installation, and management of data centre equipment and Infrastructure would be intended to be able to be bought via the framework.

CPV: Air-conditioning installations · CO2 fire-extinguishing equipment installation work · Electrical installation work of electrical distribution apparatus · Emergency power systems · Facilities management services involving computer operation · Fire suppression system · Fire-detection systems · Fire-protection devices · Gas cooling systems · Generators · Infrastructure works consultancy services · Installation services of electricity distribution and control equipment · +9 more

How this framework works

From the published notice
Framework period
2 yrs · up to 4 yrs from 14 Feb 2028

The lotProcurement structure

single lot · no lot value published
Lot #1PlannedRenewal 2 yrs

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
What this means for your bid
  • “HE Data Centre Equipment and Infrastructure Framework 2028” is a framework: the contest is a place on its panel, not a single contract.

Pipeline intelligence · planning stage: how this market runs before the tender is published

How University of Leeds buys Ballasts for discharge lamps or tubes (CPV 3115), and who usually turns up

University of Leeds’s own published record, next to the published market for the same work. This notice is a framework or DPS, so only frameworks and DPS are compared. Whole-market view: Ballasts for discharge lamps or tubes (CPV 3115) →

1

How the contest usually goes

Winner shares use published awards; bid and price charts use contested lots.

Question for the bid
This buyerUniversity of Leeds · all categories
What to do with it
How often do SMEs win?
i

How often small and medium firms win.

Share of awards where the winner’s size is known.

The counts under this question show how many awards have a known supplier size.

Last 36 months.

Buyer: 0 of 2 known-size awards · market: division 31 · UK-wide, n=70
0 of 246%

No small-firm winners recorded among this authority’s published awards in this sample.

How often do local suppliers win?
i

How often local firms win similar work.

Winners with a registered address in the delivery region, out of awards with a known address.

Here, local means registered in Yorkshire and the Humber.

A local branch does not count if the registered address is elsewhere.

Last 36 months.

Buyer: 0 of 3 known-location awards · market: division 31 · Yorkshire and the Humber, n=8
0 of 30%

Most of this buyer’s recorded winners are registered outside Yorkshire and the Humber.

How long to a decision?
i

How long buyers here take to decide after bids close.

Middle value in days from the deadline to the first award notice, on competitions that published both dates.

Only decided tenders count, so slow ones still waiting are not in.

Last 36 months.

Buyer: 3 decided notices · market: division 31 · UK-wide, n=20
118 days54 days

Half of these awards were announced within 118 days of the bid deadline.

How often single-bid or direct?
i

How often work is awarded with no recorded rival.

Direct awards and tenders where every published lot count shows one bid.

The market share is a minimum: some awards have no bid count.

Thin markets produce this too; it is not proof of a tailored specification.

Last 36 months.

Buyer: exactly 1 of 2 procurements with awards had no recorded rival · market: division 31 · UK-wide, n=39
1 of 228%

Direct awards or one recorded bid are common here. Check the route before spending time on a bid.

How many bids did past lots attract?

i

How many bids past lots received.

Each colour is a bid-count range. Only competed lots with a published count are included.

Past bids do not predict this tender.

Last 36 months.

This buyer26 lots with bid counts · all categories
12% had one bid
The market21 lots with bid counts · CPV 3115 · UK-wide
0% had one bid
Buyer / market · select a colour for counts
1 bid12% / 0%
Buyer: 3 of 26 lots with published bid counts. Market: 0 of 21 lots with published bid counts.
2–38% / 5%
Buyer: 2 of 26 lots with published bid counts. Market: 1 of 21 lots with published bid counts.
4–646% / 38%
Buyer: 12 of 26 lots with published bid counts. Market: 8 of 21 lots with published bid counts.
7+35% / 57%
Buyer: 9 of 26 lots with published bid counts. Market: 12 of 21 lots with published bid counts.

How did awards compare with estimates?

i

Where winning prices landed against estimates.

Each colour shows awards below, close to or above the published estimate, one lot at a time.

On a framework or DPS, prices are agreed when work is called off.

Past prices are a guide, not a bid price.

Last 36 months.

Not comparable on a framework or DPS. The notice sets up a supplier panel and a ceiling value; what the work actually costs is agreed later, on each call-off or mini-competition, and those publish as contract notices of their own. The award-vs-estimate record of this market therefore sits on the call-offs; this page shows it on the contracts, not on the panel that frames them.

2

Assess each lot
i

What past awards tell you about each lot.

See the forecast, this buyer’s earlier suppliers and firms with relevant wins.

No supplier is confirmed as a bidder.

Open a lot for its forecast, this buyer’s previous supplier and possible competitors, from published award history, not a bid list

Lot #1CPV 311524 monthsPublished estimate£30m
Expected competition
i

How many bids this lot may attract.

The forecast uses similar past competitions. The bar shows either that forecast or past bid counts; the line below says which.

Each lot shows its own forecast based on its own category; forecasts for different lots of the same notice are not comparative. The bar shows 15 past lots.

A forecast, not a list of bidders.

—No model forecast yet0% single-bid risk
Past bids on 15 similar lots
1 bid0%
0 of 15 similar past lots received 1 bid (0%).
2–37%
1 of 15 similar past lots received 2–3 (7%).
4–640%
6 of 15 similar past lots received 4–6 (40%).
7+53%
8 of 15 similar past lots received 7+ (53%).
Comparable past lots usually drew 7 bids.
Commercial price forecast
i

Where the award price may land.

The forecast uses similar awards and the buyer’s estimate. The band covers the middle half of likely prices.

No comparable awards for this lot yet.

A statistical guide from past awards, not a price to bid.

—Priced at call-off
On a framework or DPS the price is agreed on each call-off, so there is no award price to forecast here: the published figure is a ceiling.

Who has supplied this buyer on similar work?
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

A past supplier may not bid again.

SupplierThis buyer’s earlier contractLotAward valueWhy listed
Advanced Power Technology LtdEarlier contractHE Framework for Supply, Installation and management of Data Centre Management equipment and Infrastructure (2024)notice published Mar 2024——Matched as the earlier contract
Durata UK LtdEarlier contractHE Framework for Supply, Installation and management of Data Centre Management equipment and Infrastructure (2024)notice published Mar 2024——Matched as the earlier contract
Keysource LTDEarlier contractHE Framework for Supply, Installation and management of Data Centre Management equipment and Infrastructure (2024)notice published Mar 2024——Matched as the earlier contract
Upnorth Engineering Services LtdEarlier contractHE Framework for Supply, Installation and management of Data Centre Management equipment and Infrastructure (2024)notice published Mar 2024——Matched as the earlier contract
2BM LtdEarlier contractHE Framework for Supply, Installation and management of Data Centre Management equipment and Infrastructure (2024)notice published Mar 2024——Matched as the earlier contract

Who could compete for this lot?
i

Who could compete for this lot?

Firms with relevant past wins. On a framework, we show firms on that agreement.

None is confirmed as a bidder.

Candidate suppliers for this notice have not been worked out yet, so this is not a verdict that nobody fits.

About this data
  • Source. Official UK public procurement notices (Find a Tender), reused under the Open Government Licence v3.0. New notices arrive through the day; the figures are rebuilt nightly.
  • Two views, kept apart. The authority’s own track record and the wider market for the same kind of work sit side by side and are never mixed. Where the local picture is too thin, a figure widens to a broader market and says which one it used.
  • Forecasts are labelled. The price forecast and its range, possible competitors and the earlier-work matches are our estimates from past awards: not published facts, not win chances and not price advice. Official notices do not say who is bidding.
  • Every figure shows what it rests on. Not every notice publishes a bid count, a value or a delivery region, so each figure carries the number of records behind it, and one built on few records is marked as such. The on a figure explains it; the counting rules are in the methodology. Spotted something wrong? Tell us.

What this replaces
i

Who has done similar work for this buyer.

Past contracts are matched by buyer, title and type of work.

60% title match.

A past supplier may not bid again.

The prior contract this notice most likely re-tenders · matched by title and category (60% title match), the holder is not guaranteed to re-bid

Procedure terms & legal framework

From the official record
Procedure method
Open procedure
Legal basis
UKPGA · 2023/54 Procurement Act 2023
Procurement category
Goods
Notice status
Planned procurement
Procurement threshold
Above threshold (FTS publication)
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Unspecified in notice
Recurring procurement
Unspecified in notice
First published
22 May 2026, 15:11 BST
Last source update
22 May 2026, 15:11 BST
Authority reference
ITS2013NE
FTS notice number
2026/S 000-048075
Latest notice
Pipeline notice (UK1)
Classification (CPV)
Air-conditioning installationsCO2 fire-extinguishing equipment installation workElectrical installation work of electrical distribution apparatusEmergency power systemsFacilities management services involving computer operationFire suppression systemFire-detection systemsFire-protection devicesGas cooling systemsGenerators
+11 moreInfrastructure works consultancy servicesInstallation services of electricity distribution and control equipment
Delivery area
UK
Official registry OCID
ocds-h6vhtk-06a1c4 Find a Tender

How it was run

Official notice
Appointment period ends
—

Timeline

22 May 2026 → 14 Feb 2028 · 3 dates
  1. Planning notice published152 days ago
    22 May 2026, 15:11 BST
  2. Today
    21 Oct 2026
  3. Tender notice expectedin 223 days
    1 Jun 2027, 23:59 BST
  4. Contract starts
    14 Feb 2028

Notice history

1 event · 1 release on Find a Tender
  1. Pipeline notice published
    22 May 2026, 15:11 BST
    UK1

Commercial outcome & contract awards

Pipeline notice
Awards (0)
No award published
Contracts (0)
No contract published
Bid statistics
No aggregate bid statistics published

Contracting authority & participating public bodies

6 public bodies on the notice

NEUPC Ltd

Contracting authorityPublic authority - sub-central government GB-PPON: PVTM-8818-LTHQ NEUPC Ltd, Phoenix House, 3 South Parade, Leeds, Yorkshire & Humber, LS1 5QXContact email, phone

Consortium members and other public bodies

Official documents & specifications (1)

Official links; attachments are not copied

Notices published for this procedure

  • Pipeline notice planningPipeline noticeUK1Pipeline notice on Find a Tender