Eagle Kitchen Block Refurbishment

No classification published
Location not published
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Eagle & Swinethorpe Parish Council: "Eagle Kitchen Block Refurbishment". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityEagle & Swinethorpe Parish CouncilScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Eagle & Swinethorpe Parish Council
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Eagle & Swinethorpe Parish Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
Not availableNo published reports
Bid counts are not published for this buyer
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 1 active published awards; 0 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published6 Mar 2026, 10:24 GMT
Last source update6 Mar 2026, 10:24 GMT
Recurring procurementNot published
ClassificationNot published
Delivery areaLocation not published
OCIDocds-h6vhtk-0663ce
What is being bought
Scope of works - Demolition- • Strip out all windows and doors. • Remove existing fascia, guttering and downpipes • Remove existing roof covering • Fully strip out all internal fittings, ceilings and floor coverings • Strip out and isolate plumbing and electrical works. • Demolish internal wall • Form new door to Accessible WC DPC- • Inject all existing walls with new DPC injection Steel work- • Install new veranda steel framework. Foundations- • Excavate & concrete 4 x pad foundations as engineers' details • Excavate & concrete strip foundation for dwarf wall Brickwork- • Build new dwarf wall in engineering red bricks with brick on edge detail to the top of the wall. • We have allowed for 1 bricklayer plus materials for general brick work repairs to the existing building. Foul and rainwater underground drainage- • We have allowed to install new under ground drains and manholes as shown on the architect's drawings with a connection on to the existing run. Back fill and make good. Roof timbers- • We have allowed for all new roof timbers to the veranda only with Stirling board over the top and 9mmm ply to the underside as the engineer's detail. • We have allowed for new white UPVC fascia and guttering to the veranda and existing building. Insulation- • All roof; walls and acoustic insulation is included as per the architects' drawings. • With the associated vapour barriers as specified Internal walling- • All perimeter treated timber studwork as shown • All internal standard studs as shown • All metal stud walls with 18mm sheathing ply to both sides as shown. Joinery- • MDF window boards to all windows • 3 x vertical pipe boxings • 1 new internal door set • Architraves to 1 internal door • Supply and fit new kitchen from Howdens • Supply and fit internal dividing panels to the women's and man's WC • Supply and fit fire blanket, extinguisher and signage Plastering- • Plasterboard and skim ceilings • Plasterboard only the walls Electrical works- • All electrical items as specified • Supply and fit Solar panels (PV) • All extractor fans x4 • Panel heaters x4 • Smoke alarms Plumbing- • Remove and dispose of redundant services • Supply and fit 3no close coupled WC pans, cisterns and seats • Supply and fit 3no wall hung WHB's complete with TMV's and mixer taps • Supply and fit 1no urinal with exposed cistern and flush pipe • Supply and fit 1no Doc M pack with contrasting grab rails • Supply and fit 2no water heaters • Fit kitchen sink with allowance for 1no appliance Wall finishes- • Supply and fit white rock to all walls. Decorations- • Paint ceilings white • Paint internal exposed woodwork Floor coverings- • Supply and fit floor coverings as specified with coved upstand External paving- • Begin to excavate the existing concrete slab and dispose of from site. • Supply and install 150mm of type 1 sub-base material to the entire area and compact in layers using heavy plant. • Supply and install necessary formwork. • Break points and levels to be agreed on site. • Supply and install corduroy hazard warning tactiles • Supply and install C30/35 ready-mix concrete to achieve approx. 100mm thickness. • Level, tamp and apply brushed finish • Spread topsoil and seed to make good, disturbed areas • Install 4 x kee klamp barriers near doors/windows Quotation. Cost of works £117'181.54+VAT
What changed
From the official release history
  1. Status changed to complete
    6 Mar 2026, 10:24 GMT
  2. Official notice release published
    6 Mar 2026, 10:24 GMT
  3. Buyer information updated
    6 Mar 2026, 10:24 GMT
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    complete
    Published valueNot published
    The source published no individual title or description for this lot.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    6 Mar 2026, 10:24 GMT
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 1 Nov 2025, 00:00 GMT · £120,000
Commercial outcome and competition
Awards
Belton Construction
Not published · Not published · active
Contracts
Eagle Kitchen Block Refurbishment
£120,000 · signed 1 Nov 2025, 00:00 GMT · active
Contract period: 1 Jul 2026, 00:00 BST1 Dec 2026, 23:59 GMT
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

Eagle & Swinethorpe Parish Council

Contracting authority GB-PPON-PPTN-4921-JHGH
View buyer profile
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published