Retender radar: UK public contracts ending soon

Every contract in the catalogue with a published end date in the future, one row per contract (lot). A contract ending is a procurement starting, unless the buyer uses a published extension option, which the row shows. Frameworks and DPS are marked: what ends there is the vehicle, not one supplier’s contract.

Contracts ending in the next 12 months

Page 69 · 15 contracts on this page · more available

1,000+ contracts

  1. Ends · in 168 daysFramework re-let

    Redcar Rewires

    Beyond Housing Limited · North East England

    Incumbent: SS Testing Ltd

    • Electrical services
    • Electrical wiring work
    • Technical inspection and testing services
    Contract value
    £372kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-030219
  2. Ends · in 168 daysFramework re-let

    Scarborough rewires

    Beyond Housing Limited · North East England

    Incumbent: SS Testing Ltd

    • Electrical services
    • Electrical wiring work
    • Technical inspection and testing services
    Contract value
    £372kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-030219
  3. Ends · in 168 daysFramework re-letPanel · 2 suppliers

    Framework Agreement for the Maintenance, Service and Repair of HVAC Systems, Air Source and Ground Source Heat Pumps

    Durham County Council · Local authority · North East England

    Panel: Acrol Air Conditioning Ltd, Airco Refrigeration and Airconditioning Limited

    • Repair and maintenance services of building installations
    Contract value
    £360kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-049869
  4. Ends · in 168 daysFramework re-letExtension option · up to 31 Mar 2030Panel · 6 suppliers

    Lot 2. Rebinding and binding of unbound material, including lettering

    British Library Board · Central government · Nationwide (UK)

    Panel: Bookends Bindery, Downie Allison Downie Ltd, FARCROFT RESTORATIONS LTD +3 more

    • Bookbinding and finishing services
    • Bookbinding services
    Contract value
    £360kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    1 Apr 2026 → 31 Mar 2027 · 11 months · up to 31 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-0600dd
  5. Ends · in 168 daysFramework re-letExtension option · up to 31 Mar 2029Buyer plans to re-tender 27 Jan 2029

    West Northamptonshire Council - Point of Care Testing (POCT) Equipment and Support Framework for NHS Health Check Services

    West Northamptonshire Council · Local authority · East Midlands

    Incumbent: BHR Pharmaceuticals Ltd

    • Diagnostic devices
    Contract value
    £350kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    8 May 2026 → 31 Mar 2027 · 10 months · up to 31 Mar 2029 with extensions
    Reference
    ocds-h6vhtk-060feb
  6. Ends · in 168 daysFramework re-let

    Lot 6 - Tools

    ESPO · Nationwide (UK)

    Incumbent: Major Brushes Limited

    • Art supplies
    • Artists' paints
    • Chalks
    Contract value
    £322kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0482fe
  7. Ends · in 168 daysFramework re-let

    Free Standing Drying Racks

    YPO · Nationwide (UK)

    Incumbent: Cicada Educational Equipment Limited

    • Drying racks
    Contract value
    £320kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03899f
  8. Ends · in 168 daysFramework re-let

    Wall Mounted Drying Racks

    YPO · Nationwide (UK)

    Incumbent: Cicada Educational Equipment Limited

    • Drying racks
    Contract value
    £320kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-03899f
  9. Ends · in 168 daysFramework re-letPanel · 2 suppliers

    Lot 3 - Power Tools

    ESPO · Nationwide (UK)

    Panel: Southern Power Tools and Abrasives Limited, TW Engineering Co. Ltd

    • Locks, keys and hinges
    • Tools
    • Tools, locks, keys, hinges, fasteners, chain and springs
    Contract value
    £300kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-04973e
  10. Ends · in 168 daysFramework re-letExtension option · up to 31 Mar 2030Panel · 5 suppliers

    Lot 1. Bulk Paper Packs

    Leicestershire County Council, trading as ESPO · Local authority · Nationwide (UK)

    Panel: Bright Ideas Marketing Limited, Budget Paper Supplies Ltd, Daler-Rowney Limited +2 more

    • Art supplies
    • Card for printing
    • Corrugated paper or paperboard
    Contract value
    £300kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    13 Apr 2026 → 31 Mar 2027 · 11 months · up to 31 Mar 2030 with extensions
    Reference
    ocds-h6vhtk-050931
  11. Ends · in 168 daysFramework re-let

    Communal Boiler servicing and installation and associated works

    Luton Council · Local authority · East of England

    Incumbent: CME Heating Ltd

    • Boiler installation work
    • Gas appliance maintenance services
    • Heating works
    Contract value
    £294kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0603d1
  12. Ends · in 168 daysFramework re-letPanel · 4 suppliers

    Lot 4 - Inks

    ESPO · Nationwide (UK)

    Panel: Anglo Adhesives & Services Ltd, COLOURCRAFT (COLOURS & ADHESIVES) LIMITED, Daler-Rowney Limited +1 more

    • Art supplies
    • Artists' paints
    • Chalks
    Contract value
    £280kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0482fe
  13. Ends · in 168 daysFramework re-letPanel · 3 suppliers

    Lot 3 - Fitness Equipment

    ESPO · Nationwide (UK)

    Panel: BISHOP SPORTS & LEISURE LTD., Foams 4 Sports Ltd, THE MAD GROUP (HQ) LIMITED

    • Fitness equipments
    • Gymnasium mats
    • Leisure equipment
    Contract value
    £280kceiling for the whole framework
    Annual run-rate
    —panel, not one supplier
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0498d1
  14. Ends · in 168 daysFramework re-let

    Food Intervention Inspections

    Sheffield City Council · Local authority · Yorkshire and the Humber

    Incumbent: Buckingham Futures

    • Business services: law, marketing, consulting, recruitment, printing and security
    • Hygiene services
    Contract value
    £240kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0375ad
  15. Ends · in 168 daysFramework re-let

    Food Intervention Inspections

    Sheffield City Council · Local authority · Yorkshire and the Humber

    Incumbent: Osborne Richardson Limited

    • Business services: law, marketing, consulting, recruitment, printing and security
    • Hygiene services
    Contract value
    £240kceiling for the whole framework
    Annual run-rate
    —ceiling, not a run-rate
    Term
    Ends 31 Mar 2027 · start not published
    Reference
    ocds-h6vhtk-0375ad
How to read the radar
  • End date is the contract period end the buyer published on the notice. Contracts without an end date are not on the radar.
  • Extension option means the notice publishes a renewal or option clause; the buyer may extend instead of retendering. Hide them to see contracts that must be re-procured.
  • Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
  • Annual run-rate = published GBP value ÷ published term, only for a single supplier, a term of six months or more and a plain contract (not a framework or DPS ceiling).
  • Counts are exact for the time-horizon and sector filters. With other filters, a result above 1,000 contracts shows as “1,000+”.
  • Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.