Expiring UK Public Contracts: Retender Radar
Explore UK public contracts by expiry date, with buyers, incumbent suppliers and extension options. Estimated end dates are labelled; expiry does not guarantee a new tender.
Contracts ending in the next 12 months
Showing 851–875
- Estimated end · in 73 days
DfI:2309911-Belfast Tidal Flood Alleviation Scheme
Department for Infrastructure - Rivers · Central government · Northern Ireland
Incumbent: CHARLES BRAND GROUP LIMITED · Last contest: 8 bids (0 SME)
The objective of this procurement is for the provision of Develop and Build services by an Economic Operator’s Team (EOT). The EOT will complete the detailed develop and build of a tidal flood defence for Belfast along the tidal reach of th…
- Published value
- £33m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Jan 2027 · start not published
- Reference
ocds-h6vhtk-02e5d8
- Estimated end · in 73 days
Award Notice - Planned Boiler Replacement Programme & Associated Works
London Borough of Hillingdon · Local authority · Nationwide (UK)
Incumbent: TSG Building Services plc · Last contest: 6 bids · awarded 22% over the estimate
Award Notice. The London Borough of Hillingdon is looking for a suitably qualified contractor to conduct a programme of planned boiler replacements with associated works across a variety of dwellings within the London Borough of Hillingdon.…
- Published value
- £11m
- Annual run-rate
- —start date not published
- Term
- Estimated end 9 Jan 2027 · start not published
- Reference
ocds-h6vhtk-034649
- Ends · in 73 days
PLA26055 Bay of Lights 2026 – Ice Rink Provider
Torbay Council · Local authority · South West England
Incumbent: Icescape
Ice rink to be delivered during Bay of Lights event 2026
- Published value
- £173k
- Annual run-rate
- —term under 6 months
- Term
- 9 Sept 2026 → 9 Jan 2027 · 4 months
- Reference
ocds-h6vhtk-077c36
- Ends · in 73 days
Gas Boiler Replacement to Audley & Queens Park Learning Centre
Blackburn With Darwen Borough Council · Local authority · North West England
Incumbent: LANCASHIRE GAS SERVICES LIMITED
Remove in their entirety, the two existing gas fired boilers and install two 120kw Ideal Evo max boilers, c/w shunt pumps and standard height mounting frames at Audley and Queens Park Neighbourhood Learning Centre, as indicated in the speci…
- Published value
- £66k
- Annual run-rate
- —term under 6 months
- Term
- 30 Nov 2026 → 9 Jan 2027 · 41 days
- Reference
ocds-h6vhtk-078fd9
- Ends · in 74 daysPanel · 2 suppliers
Energy Centre for new Leighton Hospital
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: SP Manweb, Scottish Power
Provision of an Energy Centre for the New Leighton Hospital in Crewe
- Published value
- £600k
- Annual run-rate
- —panel, not one supplier
- Term
- 24 Apr 2025 → 10 Jan 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-050700
- Ends · in 74 days
Energy Centre for New Leighton Hospital
Mid Cheshire Hospitals NHS Foundation Trust · Central government · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Incumbent: Scottish Power
Provision of an Energy Centre for the New Leighton Hospital in Crewe
- Published value
- £600k
- Annual run-rate
- £325kpublished value ÷ term, exc. VAT
- Term
- 8 Mar 2025 → 10 Jan 2027 · 1.8 yrs
- Reference
ocds-h6vhtk-050700
- Ends · in 74 days
Kibble Bank - Roofing Package Works
RING STONES MAINTENANCE AND CONSTRUCTION LIMITED · Other public body · North West England
Incumbent: R.L.LOVATT LIMITED
Roofing package works comprising the re-roofing of 60 properties at Kibble Bank.
- Published value
- £306kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 3 Aug 2026 → 10 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-078e7c
- Ends · in 74 days
Voids Refurbishment Works and Services
BD Group · Other public body · Greater London
Incumbent: T.E.B. (Builders) Limited
Voids Refurbishment Works and Services relating to a project at properties within the London Borough of Barking & Dagenham.
- Published value
- £200k
- Annual run-rate
- —term under 6 months
- Term
- 10 Oct 2026 → 10 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-077fa5
- Estimated end · in 75 daysFramework recordPanel · 6 suppliers
West Midlands Metro Framework Agreement relating to the provision of Diversionary Utilities Works for Metro extensions or any Major Highways Schemes
West Midlands Combined Authority · Local authority · West Midlands
Panel: Amelio Utilities Ltd, Barhale Ltd, CPC CIVILS LIMITED +3 more
- Published value
- £30mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 11 Jan 2027 · start not published
- Reference
ocds-h6vhtk-03293d
- Ends · in 75 days
RAWTENSTALL MARKET REFURBISHMENT
Rossendale Borough Council · Local authority · North West England
Incumbent: P Casey & Co. Limited
The scheme involves a comprehensive modernization and refurbishment of Rawtenstall Market Hall to create a vibrant, contemporary space for traders and the community. Key elements include: Installation of a new roof for structural integrity …
- Published value
- £4.0m
- Annual run-rate
- £4.0mpublished value ÷ term, exc. VAT
- Term
- 12 Jan 2026 → 11 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-05d621
- Ends · in 75 daysExtension option · up to 11 Jan 2029
London Chest Hospital Phase 0 - Demolition
Bonner Road LLP · Other public body
Incumbent: Erith Contractors Ltd
Demolition of ancillary buildings at former London Chest Hospital in North London.
- Published value
- £805kinc. VAT as published
- Annual run-rate
- —term under 6 months
- Term
- 8 Aug 2026 → 11 Jan 2027 · 5 months · up to 11 Jan 2029 with extensions
- Reference
ocds-h6vhtk-06df5d
- Ends · in 75 daysExtension option
Adaptations for Disabled Access
London Borough of Bromley · Local authority · Greater London
Incumbent: Accessible Solutions Limited
Major adaptations for disabled access to a residential property within the London Borough of Bromley.
- Published value
- £110k
- Annual run-rate
- £110kpublished value ÷ term, exc. VAT
- Term
- 12 Jan 2026 → 11 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-060471
- Ends · in 75 days
Installation of Water Tank, London House
Berkshire Healthcare NHS Foundation Trust · Central government
Incumbent: Vectair Environmental
Install of new water tank in London House, Bracknell
- Published value
- £12k
- Annual run-rate
- —term under 6 months
- Term
- 2 Nov 2026 → 11 Jan 2027 · 2 months
- Reference
ocds-h6vhtk-078fd4
- Estimated end · in 76 daysFramework recordPanel · 16 suppliers
Rooftop Development Framework
Watford Community Housing · North East England, North West England, Yorkshire and the Humber, East Midlands, West Midlands, East of England
Panel: BPG Limited, Breyer Group Plc, Calfordseaden LLP +13 more
- Published value
- £200mpublished ceiling for the whole framework
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 12 Jan 2027 · start not published
- Reference
ocds-h6vhtk-035b2e
- Estimated end · in 76 days
Homes England York Central ICP/IDNO - York, North Yorkshire
Homes England (the name adopted by the Homes and Communities Agency) · Other public body · Yorkshire and the Humber
Incumbent: Harlaxton Engineering Services Ltd · Last contest: 1 bid (1 SME)
Homes England has appointed an Independent Connection Provider (ICP) and Independent Distribution Network Operator (IDNO) to provide, own and operate a new electrical network to provide power to the York Central Development.
- Published value
- £5.1m
- Annual run-rate
- —start date not published
- Term
- Estimated end 12 Jan 2027 · start not published
- Reference
ocds-h6vhtk-037ced
- Ends · in 76 days
WHHT - Asbestos Removal Works on Level 1 & 2, Moynihan, SACH
West Hertfordshire Teaching Hospitals NHS Trust · Central government
Incumbent: SCK GROUP LTD
Asbestos Removal Works on Level 1 & 2, Moynihan, St Albans City Hospital (SACH), a property of the West Hertfordshire Teaching Hospitals NHS Trust (WHHT). This contract was awarded in line with Trust Standing Financial Instructions (SFIs).
- Published value
- £251k
- Annual run-rate
- —term under 6 months
- Term
- 12 Oct 2026 → 12 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-0785aa
- Ends · in 76 days
AP25143 - Temporary Bridge - St Peters School
Scape Group Limited (trading as SCAPE) · Other public body · East Midlands
Incumbent: VP PLC
This Contract Details Notice is issued in compliance with the Procurement Act 2023 for a Below Threshold Procurement and is issued on behalf of Arc Property Services Partnership Limited ("Arc Partnership"). Temporary bridge installation, in…
- Published value
- £59k
- Annual run-rate
- £59kpublished value ÷ term, exc. VAT
- Term
- 12 Jan 2026 → 12 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-060652
- Estimated end · in 77 days
PLACE116 Supply and Installation of Bus Shelters
Derbyshire County Council · Local authority · East Midlands
Incumbent: Bus Shelters Ltd · Last contest: 1 bid (1 SME) · awarded at the estimate
The Economy, Transport and Environment Department of Derbyshire County Council manages the bus stop and bus shelter infrastructure throughout the county, excluding Derby City. This tender is to procure a provision for the supply, including …
- Published value
- £800k
- Annual run-rate
- —start date not published
- Term
- Estimated end 13 Jan 2027 · start not published
- Reference
ocds-h6vhtk-037f00
- Ends · in 77 days
Internal Adaptations
East Devon District Council · Local authority · Nationwide (UK)
Incumbent: BELL GROUP LTD
Internal Adaptations on Multiple EDDC properties
- Published value
- £297k
- Annual run-rate
- £531kpublished value ÷ term, exc. VAT
- Term
- 24 Jun 2026 → 13 Jan 2027 · 7 months
- Reference
ocds-h6vhtk-06be5d
- Ends · in 77 days
Voids Refurbishment Works and Services
BD Group · Other public body · Greater London
Incumbent: Seaxe Contract Services Ltd
Voids Refurbishment Works and Services relating to a project at properties within the London Borough of Barking & Dagenham.
- Published value
- £200k
- Annual run-rate
- —term under 6 months
- Term
- 13 Oct 2026 → 13 Jan 2027 · 3 months
- Reference
ocds-h6vhtk-077faf
- Ends · in 77 days
Construction work
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: Pentaco Construction Ltd
956 - Construction works for capital theatre.
- Published value
- £88k
- Annual run-rate
- £88kpublished value ÷ term, exc. VAT
- Term
- 14 Jan 2026 → 13 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-060576
- Ends · in 77 days
Labour Works
Cambridge University Hospitals NHS Foundation Trust · Central government · East of England
Incumbent: Mechtronics Ltd
963 - labour - engineering works.
- Published value
- £68k
- Annual run-rate
- £68kpublished value ÷ term, exc. VAT
- Term
- 14 Jan 2026 → 13 Jan 2027 · 1 yr
- Reference
ocds-h6vhtk-0605aa
- Estimated end · in 78 days
Contract for Façade cladding remedial works at Northumbria Specialist Emergency Care Hospital
Northumbria Healthcare Facilities Management · North East England
Incumbent: Geoffrey Robinson Limited · Last contest: 2 bids (1 SME)
Contract for Façade cladding remedial works at Northumbria Specialist Emergency Care Hospital, Cramlington.
- Published value
- £12m
- Annual run-rate
- —start date not published
- Term
- Estimated end 14 Jan 2027 · start not published
- Reference
ocds-h6vhtk-049216
- Ends · in 78 days
Provision of Cladding Remediation at Blocks 1-38, Plas Y Mor, Glanmor Terrace, Burry Port
Codi Group Ltd · Other public body · Wales (Cymru)
Incumbent: Zeno Construction · Last contest: awarded 37% over the estimate
Codi Group conducted an Open Tender process to appoint a contractor for the Provision of Cladding Remediation at Blocks 1-38, Plas Y Mor, Glanmor Terrace, Burry Port, Carmarthenshire.
- Published value
- £972k
- Annual run-rate
- —term under 6 months
- Term
- 17 Aug 2026 → 14 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06075e
- Ends · in 78 days
Pre Construction Services Agreement
JOHN INNES CENTRE · Other public body · East of England
Incumbent: MJS Projects (March) Ltd
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centr…
- Published value
- £143k
- Annual run-rate
- —term under 6 months
- Term
- 6 Aug 2026 → 14 Jan 2027 · 5 months
- Reference
ocds-h6vhtk-06ded1
When contracts end · Construction work i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
2,848 contracts and agreements end within 24 months, 4,753 in total · £5.9bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
Top sectors, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each. Top 8 of 45 divisions shown.
85Health and social work services3,61279Business services: law, marketing, consulting2,66945Construction work2,10872IT services: consulting, software, internet1,62760Transport services (except waste transport)1,54071Architectural, construction, engineering1,42150Repair and maintenance services1,40880Education and training services1,260
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.